KGL Resources Limited (ASX:KGL) provides the attached corporate presentation
This announcement has been approved by the directors of KGL Resources Limited.
KGL Resources Limited | Corporate Presentation
Page 1 of 1
ASX:KGL
Jervois Project Update
Advancing the high-grade Jervois copper deposit toward production
Jeff Gerard
Executive Chairman
February 2025
Important Notices and Disclaimer
No reliance: To the maximum extent permitted by law, the information in this presentation is given without any liability whatsoever being accepted by KGL or any of its related bodies corporate or their
respective directors, officers, employees, advisors and agents (together, the Relevant Parties). The information contained in this presentation is not intended to constitute legal, tax or accounting advice
or opinion. No representation or warranty, expressed or implied, is made as to the accuracy, completeness or thoroughness of the information, whether as to the past or future. Recipients of this
presentation must make their own independent investigations, consideration and evaluation. To the maximum extent permitted by law, each Relevant Party disclaims all liability and responsibility for any
direct or indirect loss or damage which may be suffered by any recipient through the use of or reliance on anything contained in or omitted from this presentation or its contents or otherwise arising in
connection with it.
Limited disclosure: This presentation contains summary information about KGL and its activities which is current at the date of this presentation (unless otherwise noted). The information in this
presentation is of a general nature. This presentation does not purport to contain all the information that a prospective investor may require in evaluating a possible investment in KGL. It should be read
in conjunction with KGL’s other periodic and continuous disclosure announcements lodged with ASX, which are available at www.asx.com.au.
Seek your own advice: In providing this presentation, KGL has not considered the objectives, financial position or needs of the recipient. The recipient should consult with its own legal, tax or
accounting advisers as to the accuracy and application of the information contained herein, and conduct its own due diligence and other enquiries in relation to such information and any investment in
KGL and the recipient’s objectives, financial position or needs.
Financial information: All references to ‘$’, ‘A$’ or ‘AUD’ in this presentation are to Australian dollars unless otherwise noted.
Certain financial data included in this presentation is ‘non-IFRS financial information’ under ASIC Regulatory Guide 230 ‘Disclosing non-IFRS financial information’ published by ASIC and is also
considered ‘non-GAAP financial measures’ under Regulation G of the US Securities Exchange Act of 1934, as amended. Such measures are not recognised under Australian Accounting Standards or
the International Financial Reporting Standards (IFRS). The disclosure of such non-GAAP financial measures in the manner included in this presentation may not be permissible in a registration
statement under the US Securities Act.
KGL believes the non-IFRS financial information / non-GAAP financial measures provide useful information to users in measuring the financial performance and condition of KGL. However, investors
should note that the non-IFRS financial information / non-GAAP financial measures do not have a standardised meaning prescribed by the Australian Accounting Standards or IFRS.
Therefore, the non-IFRS financial information / non-GAAP financial measures are not a measure of financial performance, liquidity or value under the Australian Accounting Standards or IFRS and may
not be comparable to similarly titled measures presented by other entities, nor should the information be construed as an alternative to other financial measures determined in accordance with Australian
Accounting Standards or IFRS. Investors are therefore cautioned not to place undue reliance on any non-IFRS financial information / non-GAAP financial measures included in this presentation
Cautionary note regarding reserves and resources: As an Australian company with securities listed on ASX, KGL is required to report ore reserves and mineral resources in accordance with the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mining companies in other countries may be required to report their mineral
reserves and / or resources in accordance with other guidelines (for example, Subpart 1300 of Regulation S-K in the United States).
This announcement contains certain ‘forward-looking statements’ within the meaning of the securities laws of applicable jurisdictions. Forward-looking statements can generally be identified by the use
of forward-looking words such as ‘may,’ ‘should,’ ‘expect,’ ‘anticipate,’ ‘estimate,’ ‘scheduled’ or ‘continue’ or the negative version of them or comparable terminology. Any forecasts or other forward
looking statements contained in this announcement are subject to known and unknown risks and uncertainties and may involve significant elements of subjective judgment and assumptions as to future
events which may or may not be correct. There are usually differences between forecast and actual results because events and actual circumstances frequently do not occur as forecast and these
differences may be material. KGL does not give any representation, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in this
announcement will actually occur and you are cautioned not to place undue reliance on forward-looking statements.
Jervois Copper Project Update | February 2025 | ASX:KGL
2
Highlights
Feasibility Study Update released
with robust economics, attractive
capital efficiency and strong margins
All necessary approvals
to commence construction in
Tier One mining jurisdiction
High Grade Cu Project
29Mt @ 1.8% Cu with Au & Ag credits
significant growth potential through
ongoing targeted exploration
10 Year Mine Life
straightforward processing,
~1Mt Cu concentrate LOM
(30k tpa Cu contained
steady state)
Jervois Copper Project Update | February 2025 | ASX:KGL
Experienced Board and
management
Track record in projects
Building the delivery team
Robust copper market
fundamentals
Jervois expected to produce into
growing supply deficits
3
Jervois Project, NT
KGL’s Jervois Project is a high-grade polymetallic project mid way between
Alice Springs, Northern Territory and Mt Isa, Queensland.
•
•
•
•
Fully Permitted
Initial 10 year mine.
2-year delivery timetable coincides with projected Cu supply gap.
High Grade Resource
29mt @ 1.8% Cu.
(including Rockface indicated resource of over 3% Cu).
Resources contain > 500kt of Cu, 29 Moz of silver and 200koz of gold.
Attractive Economics - Leveraged to rising copper price
Average 30kt per annum copper contained (steady state).
NPV (8%) after-tax $405 M @ US$4.58/lb (@ AU$0.64).
Extensive Exploration Potential
Adjacent to a crustal scale fault, large high-grade under-explored
mineralising system with significant upside potential, open both laterally
and at depth.
Exploration targets
Building on high grade at Rockface and southern domain lateral
extension.
Scarpe trend - similar mineralisation to Reward (brecciated IOCG).
Lead / Zinc mineralisation addition.
Jervois Copper Project Update | February 2025 | ASX:KGL
RL
+400
+200
0
-200
-400
-600
-800
Bellbird
Rockface
Amigo
4
Jervois Project: Overview
Two open pit mines (Reward and Bellbird) and four underground mining
areas (Rockface, Reward, Marshall, Bellbird).
Open cut operations - primary ore feed for first four years using
conventional earthmoving equipment.
Transition to Underground – initial development and stooping.
Straightforward Metallurgy
95% sulphides at 92% Cu recovery.
Simple process plant design with nameplate capacity 2 Mtpa ore,
(a 25% increase from FS22.)
Ore milling and regrind, using Jameson cells for rougher and cleaner
flotation and filters.
Approx. 1 Mt of 27% Cu concentrate with Au & Ag credits over a 10
year mine life.
Average production rate of 30kt per annum copper contained steady
state following plant ramp up.
Concentrate to be sold under a Free on Transport (FOT) / ex-site,
commercial offtake contract being finalised.
Jervois Copper Project Update | February 2025 | ASX:KGL
5
Feasibility Study Update – Headline numbers
$405 M
Post Tax NPV (8%) @ US$4.58/lb
c.$229 M
Average EBITDA (Steady State)
$112 M
10 Year
$1.95/lb
24% / 3.4 Yrs
Avg. After-tax Free Cash Flow (1)
Mine Life
Post Tax NPV (8%) A$688 M @ US$5.90/lb
29
Cu
Copper
$362 M
30 kt pa
Pre-production Capital Cost(2)
Avg. Annual Cu Production
Capital Efficiency A$12,000/t
With gold & silver credits
C1 Cash Costs (steady state)
IRR (post tax) / Payback Period
Jervois starts production
Note 1. Reflects the first 10 years of production. Free cashflow is unlevered.
Note 2. Funding requirement excludes working capital (open pit opex and contingency of $136m).
Jervois Copper Project Update | February 2025 | ASX:KGL
6
Robust 10 year mine life
with upside potential
2.0
CuEq Grade (%)
Additional adjacent open pit areas are being
considered.
2.5
Ore Mined (Mt/year)
Proportion of lower cost open cut ore (now primarily all
Proven reserves) has increased from 25% to 41% of total
ore mined. (FSU25 vs FS22).
Ore Tonnage Mined by Source - Financial Year
1.5
1.0
0.5
-
Installed processing plant capacity enables incremental
concentrate output above current plan.
Bellbird OP
Reward OP
Bellbird UG
Reward UG
Simple payback is achieved during the period of open pit
ore feed to mill (incl. underground pre-production costs).
Mill feed transitions to underground ore in year 4 with the
average Cu Eq. grade @ 2.2%, peaking in year 7 to
c.3% Cu Eq., as mining progresses deeper.
Proven and Probable Reserves: 14.4Mt at 2.1% Cu Eq.
87% of LOM ore tonnage.
100%
90%
120
80%
100
70%
60%
80
50%
60
40%
30%
40
Ore Reserve %
All lodes remain open, laterally and at depth.
140
Thousand Tonnes
Steady state production avg. 30 ktpa Cu contained in
concentrate. (~34 ktpa Cu Eq. payable).
Concentrate Production based on Ore Reserve - Financial Year
20%
20
10%
0%
0
Concentrate Production
Jervois Copper Project Update | February 2025 | ASX:KGL
7
Project Generates Robust Economics
Short Payback / Strong Margins
Technically robust:
– Inputs from Xenith, Sedgman, Tier 1 mining
contractors.
– Independent review by RPM (Critical Issues)
- “No Red Flags”.
Low capital Intensity (A$12,000/t Cu).
Strong cash generation:
EBITDA Profile - Financial Year
– Strong EBITDA $229m p.a. (steady state).
700
600
Copper contributes approximately 84%, whilst gold and
silver by-products contribute circa 6% and 10%,
respectively (gross revenue basis).
NPV (8% real, after tax) $405M ($0.62/share).
Significant value upside:
– Resource growth / life extension and
– Cu price, driven by forecast copper supply deficit.
A$m Real
– Short Payback (3.4 yrs)1 / IRR (24%).
500
400
300
200
100
(100)
Net Revenue
Operating Costs
Royalty
EBITDA
Note 1. Simple payback from first concentrate.
Jervois Copper Project Update | February 2025 | ASX:KGL
8
Jervois Project FSU25: Key Metrics
Operating Metrics
Metal Price & Other Key Assumptions
Assumption
Units
Value
Assumption
Unit
L/T
Mine Life
Years
10
Copper Price
US$/lb
4.58
Life of Mine Net Revenue
A$ billion
4.4
Gold Price
US$/oz
2,668
Life of Mine EBITDA
A$ billion
1.9
Silver Price
US$/oz
32.62
Cu Concentrate (LOM)
kdmt
983
FX AU$:US$
US$
0.64
Diesel Prices
A$/L
1.30
Electricity Prices
c/kWh
29.8
Production
Copper (steady state)
kt pa
30
Silver
koz pa
1,016
Gold
koz pa
8.4
NPV (8% real, after tax) – Sensitivity to Copper Prices
1000
C1 Cost steady state
US$/lb
1.95
C1 Cost (LOM)
US$/lb
2.19
AISC steady state
US$/lb
2.86
Construction Capital
A$ million
362
Peak Funding
A$ million
498
800
A$ Mn
Operating and Capital Costs
600
400
200
0
Jervois Copper Project Update | February 2025 | ASX:KGL
Base Case
Incentive Price
Bullish Price
(US$4.58/lb)
A$0.62/share equiv.1
(US$5.90/lb)
~A$1.0/share equiv. 1
(US$6.80/lb)
~A$1.5/share equiv. 1
Note1. Excludes Resource conversion / exploration upside.
9
The Way Forward
Jervois Copper Project Update | February 2025 | ASX:KGL
10
Pathway to production in 2027
Jervois Copper Project Update | February 2025 | ASX:KGL
11
Project Delivery - Forward Work Plan
PROJECT EXECUTION PLAN (PEP)
Funding and FID
FID &
Funding
Prep
Operations
Site Prep
Construction
Construction Completion
6 months
12 months
6 months
Ongoing
Plant Procurement
Process Plant Site Erection
Plant: Commissioning & Ramp Up
Plant @ 2Mtpa rate
Clean up and
Drainage
Laydown prep
Reward O/C
Commissioning
OC Mining
commences at BB
Reward & BB Open Pit
Reward OC: 2 x diggers /
BB Completes
Water: Pipeline
Creek diversion
Haul Roads
TSF Construction
Rockface UG Site Prep
UG Mobilisation / Rockface
Development Commences
Construction Water
Supply Dams
Crushing Plant
Preliminary Power
Infrastructure
Site
Electrification
Fencing
Batch Plant
Fuel & Explosives
storage
Ore Feed Stockpile
Camp Infrastructure
Airstrip Bulk
Earthworks
Jervois Copper Project Update | February 2025 | ASX:KGL
Camp
Infrastructure
Airstrip
commissioning
12
Funding Strategy
Company can now actively engage with equity and debt investors as part of the capital raising process for project development.
The Project is expected to be funded via a combination of equity, term and working capital debt.
KGL is appointing a financial advisor to assist in structuring and funding process for the Jervois Project.
•
Equity discussions include institutional investors, strategic partnering and other investors.
•
This process will run in parallel with the senior debt and working capital process and will support an optimised funding package
for construction through to steady state concentrate production and sales.
The Project’s total funding requirement amounts to $498m peaking during Q1 2027 (pre-financing costs) comprised of:
•
Pre-production capital costs of A$362 million.
•
Working capital A$136 million – primarily open pit ramp up prior to plant commissioning.
•
Additional support from Federal Government funding initiatives will be targeted.
•
Project Construction is expected to commence in 2nd half calendar 2025.
•
The Project is expected to bring significant employment and economic benefits to the Northern Territory including economic
development, regional infrastructure, opportunities for Indigenous engagement, employment and royalties.
Jervois Copper Project Update | February 2025 | ASX:KGL
13
Copper Market
Jervois Copper Project Update | February 2025 | ASX:KGL
14
Copper outlook is robust
Market Outlook
Supply Demand Forecast2
S&P Global “demand for refined copper will double … by 2035”.
Demand forecasts reflect global commitments to achieve Net Zero by 2050 with
electric vehicles and the grid key demand drivers + traditional demand growth.
Demand
At COP28 climate change conference, over 60 countries endorsed a plan to triple
global renewable energy capacity by 2030.
Accelerating demand expected from the clean energy transition, data centres and
AI, defence industries and ongoing industrial demand in China, India and SE Asia.
Clean energy technologies are more copper intensive.
Supply Constraint
“The pronounced lack of new projects has begun to bite, constraining refined
copper production and spotlighting years of underinvestment in copper exploration
and development”.1
The average time to progress projects from discovery to production is around
16 years.3
BHP estimates that copper potentially needs around US$250 billion in growth
capital by 2030.4
Concentrate supply is expected to peak in 2025.
Lack of investment and approved project pipeline together with declining
grades in current operations could see a supply gap of 35% by the end of this
decade according to Trafigura5.
Note1 . Michael Widmer, Bank of America, Commodity Strategist – April 8, 2024.
Note2 . Woodmac; Goldman Sachs Global Investment Research
Note3 . Paul Manalo, S&P Global , Discovery to production averages 15.7 years for 127 mines
Note4 . Mike Henry, Bank of America Global Metals, Mining and Steel Conference 2023
Note5 . Emma Powel, The Times, Supply gap for copper “could grow to a third” trader predicts”.
Jervois Copper Project Update | February 2025 | ASX:KGL
15
Copper Market Forecast
The world cannot decarbonise without copper, a key component of renewables and
electrification. According to Wood Mackenzie, copper demand is expected to rise by
75% by 2050, reaching 56 million tonnes, driven by the clean energy transition,
urbanization, and electrification, which will require significant investment in new copper
projects to meet this growing demand. (August 2024).
Global copper demand is expected to accelerate for the period 2021-2035 to grow at
2.6% annually or roughly 1 Mt copper demand growth per year compared with a
1.9% CAGR over the past 15 years. Surging demand is being driven by the
simultaneous adoption of copper-intensive technologies, such as electric vehicles
(EVs), renewable energy systems, grid investments, and data centres, alongside
increased military demand and continued economic development in emerging markets.
Lower grades and increased depth and complexity of deposits, present significant
Bloomberg NEF Transition Metals Outlook 2023
challenges for primary supply. Growing regulatory, environmental and sustainability
commitments have increased the time and cost of developing a mine, and this
inflationary trend may prove stubbornly persistent. The long lead times to develop new
mines are hampering any meaningful supply response.
According to Bloomberg NEF (2023), the copper market is forecast to move into a
growing deficit through this decade, and to grow quickly to expand to a large
deficit of 21 million tonnes per year by 2050. Illustrating this, the orange line in the
adjacent chart represents supply, and the shaded area represents demand (and its
constituents by use type).
According to BHP, “with the deficit conditions anticipated in the final third of the 2020s,
it is possible that we enter into a “fly-up” pricing regime, whereby prices disconnect
from the cost curve due to systematic excess of demand over supply amid inadequate
inventory levels”. BHP’s Economic and Commodity Outlook. August 2024
Jervois Copper Project Update | February 2025 | ASX:KGL
Trading Economics (Feb 2025)
16
KGL Corporate Snapshot
Corporate Structure
KGL Share Price Performance vs Copper Price
ASX Code: KGL
0.25
648.1m
Shares Outstanding
A$71m
Market Capitalisation
52 week low / high
0.2m
KGL Share Price A$
Share Price
A$0.085-$0.14
4.50
0.20
4.00
0.15
3.50
3.00
0.10
2.50
0.05
Copper Price US$/lb
A$0.11
5.00
2.00
Options on Issue
A$5.4m
Major Shareholders
KMP
Investments
35.1%
Shareholders by Geography
Europe
3.0%
Funds
11.0%
Asia
42.0%
Denis
Wood
8.9%
Cash (31 December 2024)
Marshall
Plenty
7.0%
Other
38.0%
Jervois Copper Project Update | February 2025 | ASX:KGL
Australia
30.5%
North
America
10.7%
17
Key Takeaways
1
FSU25 delivered Q1 2025
Confirmed robust technical and financial results.
4
Fully Permitted to commence.
Attractive project capital intensity; simple scope
Outside of the current exploration focus, the 12 km.
ITE Report being completed for project funding.
mineralising system remains relatively
underexplored with exploration targets including
anomalies at depth.
Funding discussions underway
Discussions commenced with potential equity
and debt investors.
Major contracts to be finalized in H1 2025.
Ongoing optimisation work separate to Project
5
delivery will continue.
3
Experienced Board & Management Team
focused on pathway to production in 2027
Jervois Copper Project Update | February 2025 | ASX:KGL
expanding Mineral Resources including geophysics
and gravity and magnetic inversion analysis.
All planned UG mining areas remain open at depth.
and rapid delivery - mitigate construction risks.
2
Growing the Resource
Active exploration program improving and
6
Improving copper fundamentals
supportive delivering project into
expected chronic market shortfall
KGL share price has disconnected from
bullish sentiment reflected in the increasing
copper prices. We expect KGL share price
to favourably re-position, benefiting from
project metrics and recent M&A multiples
18
Appendix – Competent Person Disclosures
Jervois Copper Project Update | February 2025 | ASX:KGL
19
Jervois Mineral Resource
Resource
Material
Area
Open Cut
Potential
> 0.35% CuEq
Reward
Bellbird
Reward
Bellbird
Rockface
Metal
Category
Tonnes(Mt)
Copper
(%)
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Silver
(Moz)
Gold
(koz)
Measured
2.67
1.89
46.4
0.42
50.4
3.98
36.2
Indicated
4.01
1.31
44.4
0.23
52.6
5.73
30.2
Inferred
0.05
1.08
15.4
0.14
0.6
0.03
0.2
Measured
1.73
1.91
11.7
0.11
33.1
0.65
6.1
Indicated
1.38
1.43
9.0
0.14
19.7
0.40
6.2
Inferred
0.27
1.00
7.2
0.09
2.7
0.06
0.8
10.12
1.57
33.4
0.25
159.1
10.85
79.7
Indicated
4.54
1.85
29.1
0.40
83.8
4.25
58.4
Inferred
6.13
1.25
19.6
0.17
76.9
3.86
33.1
Indicated
0.40
1.76
15.4
0.20
7.0
0.20
2.5
Inferred
3.98
1.82
12.1
0.11
72.4
1.55
13.6
Indicated
2.91
3.27
209.0
0.23
95.2
1.96
21.3
Inferred
0.88
1.73
16.3
0.16
15.3
0.46
4.5
18.84
1.86
20.3
0.22
350.7
12.28
133.4
28.95
1.76
24.8
0.23
509.8
23.13
213.1
Sub total
Underground
Potential
> 0.8% CuEq
Grade
Sub total
Total
Jervois Copper Project Update | February 2025 | ASX:KGL
20
Jervois Ore Reserve
Notes:
Jervois Copper Project Update | February 2025 | ASX:KGL
1. Mineral Resources are inclusive of Ore Reserves.
21
Competent Persons’ Statement and Disclaimer
Competent Person Statement
The information in this announcement that relates to a Production Target and the forecast financial information derived from the production was first released to the market on 10 February
2025. KGL Resources Limited confirms that all the material assumptions underpinning the production target and forecast financial information derived from the production target continue
to apply and have not materially changed.
The information in this announcement that relates to Mineral Resource Estimates released to the market on 10/02/2025 and is based on data compiled by Ian Taylor BSc (Hons), a
Competent Person who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Taylor is an independent consultant working for Mining Associates. Mr Taylor has sufficient
experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which is being undertaking to qualify as a Competent Person as
defined in the 2012 Edition of ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Taylor consents to the inclusion in the announcement of
the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to Ore Reserves Estimates was first released to the market on 10/02/2025 and is based on data compiled by Iain Ross BSc (Hons)
Mining, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Ross is a consultant working for Xenith Consulting Pty Ltd who were engaged by
the Company to carry out the ore reserve estimate. Mr Ross has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Ross consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.
Copper Equivalent calculation basis for Mineral Resource Estimate
Copper Equivalent uses a copper price of USD $4.90/lb, silver price of USD $32/oz and a gold price of USD $2400/oz, and a Bi penalty of US$1.5/dmt for every 100ppm over 1200ppm in
the concentrate. Fresh recoveries; Copper 92.7%, silver 65%, gold 65%, and bismuth 65%. Oxide recoveries; Copper 50%, silver 45%, gold 45%, and bismuth 50%. E.g. Cu 0.5%, Ag 20
g/t, Au 0.2 g/t and 100ppm Bi, the formula is Cu % + 0.478 x Au g/t +0.0068 x Ag g/t - 0.000074 x Bi ppm.
Forward Looking statements
This release includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”, “project”, “opinion”, “should”, “could”, “may”, “target” and other similar
expressions are intended to identify forward looking statements. All statements, other than statements of historical fact, included herein, including without limitation, statements regarding
forecast cash.
Jervois Copper Project Update | February 2025 | ASX:KGL
22
Competent Persons’ Statement and Disclaimer
Competent Person Statement
The following drill holes were originally reported under the JORC code 2012 on the date indicated in the table. The Company confirms it is
not aware of any new information or data that materially affects the information included in the original market announcement and that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and
have not materially changed.
Hole
Date originally Reported JORC Reported Under
Jervois Copper Project Update | February 2025 | ASX:KGL
KJD625
03/07/2024
2012
KJD628
03/07/2024
2012
KJD572
28/06/2023
2012
KJD329
29/07/2017
2012
KJD413
17/03/2020
2012
KJD395
04/12/2024
2012
KJD638
04/11/2024
2012
KJD637
04/11/2024
2012
KJD220W1
12/12/2017
KJD639
04/11/2021
2012
2012
KJCD216
30/10/2017
2012
KJCD197
19/09/2016
2012
KJCD171
20/10/2015
2012
KJCD201
09/02/2017
2012
KJCD481D3
11/10/2021
2012
KJCD556D3
28/06/2023
2012
KJCD556
02/10/2022
2012
KJCD203
09/02/2017
2012
KJCD215
04/09/2017
2012
KJCD556D4
08/11/2023
2012
KJCD627D1
29/07/2024
2012
23
Appendix – High-grade Undeveloped Copper Resource
Jervois Copper Project Update | February 2025 | ASX:KGL
24
High-grade undeveloped resource
The Jervois mineralization system is unique - IOCG, VHMS and elements of SEDEX mineralization.
Total Resource at Jervois 28.95Mt @ 1.76% Copper, with 24.8g/t Silver and 0.23g/t Gold.
Capturing added value
3D rendition of Jervois copper deposits
Lodes remain open laterally and at depth.
Update structural geology & Inversion analysis
Resource conversion – OC additions, depth extension via drilling
/ DHEM
Lateral extension of Rockface hi-grade zone (~19%Cu)
Geophysical assessment of Scarp trend showing similar geology
to Reward (DHEM, gravity, seismic)
Additional UG potential
Future potential
Upgrade of Lead / Zinc resource mineralisation
Jervois exploration license covers 38km2 and 12kms (78%) of
the
‘J-structure’ remains undrilled or has seen shallow drilling only.
Additional license at Unca Creek 73km2.
Jervois Copper Project Update | February 2025 | ASX:KGL
RL
+400
+200
0
-200
-400
-600
-800
Bellbird
Rockface
Amigo
25
Rockface: Exploration potential
Significant Intercepts
Rockface Long projection
Cu grade block model 2022
(cut-off at 1% Cu)
High grade copper with silver and gold
credits; highest grades in bornite
mineralisation on western margin.
Elevated polymetallic grades have been
confirmed at depth.
Conductor open at depth.
Investigating lateral extensions.
KJCD171: 10m @ 2.14% Cu , 12.5g/t Ag, 0.10g/t Au from 255m
KJCD197:
• 6.6m @ 11.53% Cu from 535 m
• 6.2m @ 1.0% Cu , 7.3 g/t Ag, 0.9 g/t Au from 544.8m
• 10.5m @ 7.1% Cu , 29.4 g/t, 0.89 g/t Au from 558m
KJCD201: 7.5m @ 8.99% Cu , 45.5 g/t
Ag, 0.60 g/t Au from 645.65 m
KJCD481D3: 4.45m @
18.88% Cu , 396.8 g/t Ag,
0.42 g/t Au from 725.35 m
KJCD556D3: 4.15m @ 5.04% Cu ,
129.06 g/t Ag, 0.41 g/t Au from 15.38m
KJCD556: 12.38m @ 2.6% Cu , 23.8
g/t Ag, 0.34 g/t Au from 978.26m
Jervois Copper Project Update | February 2025 | ASX:KGL
KJCD203: 23.2m @ 5.08% Cu, 22.4 g/t Ag, 0.22
g/t Au from 435 including 11.6m @ 8.89% Cu ,
38.5 g/t Ag, 0.38 g/t Au from 436m
KJCD215:
• 6m @ 9.21% Cu , 0.19% Zn, 38.1g/t Ag, 0.29g/t Au from
587.5m including 3.3m @ 14.00% Cu , 53.6g/t Ag,
0.34g/t Au from 588.48m
• 10.2m @ 4.74% Cu , 23.0g/t Ag, 0.28g/t Au from 610.09m
KJCD556D4: 4.1m @ 3.59% Cu ,
20.49% Zn, 4.32% Pb, 199.9 g/t
Ag, 0.65 g/t Au from 990.0 m
KJD627D1: 5.08m @ 6.74% Cu , 330.63 g/t
Ag, 5.36 g/t Au, 18.41% Zn, 8.42% Pb,
199.9 g/t from 1013.05 m
E
26
Reward & Marshall: Exploration potential
Significant Intercepts
Drilling at shallow to intermediate
depths has increased confidence in
the mineral resource estimate.
Elevated gold grades have been
confirmed at Reward Main Lode
and Reward Deeps.
Conductors open at depth.
Exploration potential around
existing ore body.
Jervois Copper Project Update | February 2025 | ASX:KGL