Assays from first six holes of 2023 Jervois Drilling program received, confirming
extensions to mineralisation at Rockface and Marshall, and increasing confidence in
open pit resource at Reward.
KJCD556D2 at Rockface
o 12.1 m1 @ 1.64% Cu, 21.4 g/t Ag, 0.38 g/t Au from 950.95 m
KJCD556D3 at Rockface
o 5.6 m @ 3.10% Cu, 42.7 g/t Ag, 0.40 g/t Au from 985.1 m
KJCD434D1 at Marshall Lode
o 3.5 m @ 1.96% Cu, 12.4 g/t Ag, 0.3 g/t Au from 440.00 m
KJD570 at Reward
o 7.7 m @ 2.71% Cu, 35.4 g/t Ag, 0.63 g/t Au from 103.18 m including:
4.9 m @ 3.63% Cu, 44.1 g/t Ag, 0.33 g/t Au from 106.92 m
KJD571 at Reward
o 9.6 m @ 2.64% Cu, 50.9 g/t Ag, 0.51 g/t Au from 133.15 m including:
2.0 m @ 6.33% Cu, 155.0 g/t Ag, 0.57 g/t Au from 139.41 m
KJD572 at Reward
o 14.7 m @ 2.50% Cu, 25.8 g/t Ag, 0.87 g/t Au from 110.3 m including:
1.3 m @ 4.16% Cu, 34.6 g/t Ag, 4.20 g/t Au from 111.4 m
1.5 m @ 4.66% Cu, 37.2 g/t Ag, 0.56 g/t Au from 121.7 m
2.2 m @ 5.68% Cu, 39.0 g/t Ag, 0.81 g/t Au from 127.0 m
Drilling aimed at brownfields resource extensions at Rockface and Marshall Deeps
and resource classification uplift to JORC Measured category at Reward open pit.
Drilling continues with two rigs on-site.
KGL Resources (ASX:KGL) has recently obtained assay results for the first six drill holes in the ongoing 2023
drilling program conducted at Jervois. The initial phase of the 2023 drilling program is centered around three
specific target areas (Figure 1):
1
Rockface depth extensions
Marshall Lode extensions
Reward Open Pit Resource Upgrade
All intercept widths are Estimated True Thickness unless otherwise specified.
Latest drilling results from Jervois project
Figure 1: Simplified geology map of Jervois project showing locations of reported drilling results at Rockface, Reward
and Marshall.
Latest drilling results from Jervois project
Figure 2: Map of Rockface deposit showing locations of reported drill holes. Resource block model shown coloured by
copper grade, existing drilling shown by light grey trace lines. Line E-E’ indicates location of long section shown in
Figure 3.
Latest drilling results from Jervois project
Rockface Depth Extension Results
Hole KJCD556D2 intersected a wide zone of strong mineralisation carrying significant copper:
12.1 m @ 1.64% Cu, 21.4 g/t Ag, 0.38 g/t Au from 950.95 m
This intersection is located within the Rockface North Lode and was accurately predicted by Downhole EM
(DHEM). It is 50 metres up-dip from the previously reported2 parent hole KJCD556 (refer to Figure 3 Long
Section), which intersected 12.38 m @ 2.60% Cu, 23.8 g/t Ag, 0.34 g/t Au from 978.26 m.
Hole KJCD556D3 intersected high-grade copper mineralisation located approximately 35 metres west of
parent hole KJCD556:
5.6 m @ 3.10% Cu, 42.7 g/t Ag, 0.40 g/t Au from 985.1m
We are currently awaiting assay results for an additional hole (KJCD556D4) and drilling is underway on hole
KJCD575, which will be the deepest target ever tested at Rockface. Upon completion, hole KJCD575 will
undergo DHEM surveying, and all the results will be thoroughly assessed to develop plans for further drilling
activities.
Figure 3: Longitudinal (plane-of-vein) projection of the lower part of Rockface North target between 750 m and 950 m
depth showing the latest intersection in KJCD556D2 and KJCD556D3. An additional completed hole is waiting for assays
(KJ556D4), The target of the current hole (KJCD575) is shown. DHEM conductors are shown as green rectangles.
Planned mine openings are also shown. All intersections are quoted estimate true thickness (ETT).
2
KGL ASX Announcement 27 September 2022 “High-grade and thick copper intersected 120 metres below previous
Rockface drilling”.
Latest drilling results from Jervois project
Figure 4: Map of Reward deposit showing locations of reported drill holes within Reward open pit and Marshall Lode.
Resource block model shown coloured by copper grade, existing drilling shown by light grey trace lines. White dashed
lines indicate locations of sectional views shown in Figure 5 (A’-A), Figure 6 (B’-B), Figure 7 (C’-C) and Figure 8 (D’D).
Latest drilling results from Jervois project
Marshall Lode Extension Results
The main objectives of drilling at Marshall Lode are to increase confidence in the mineral resource and
expand the mining plan to deeper levels, ultimately extending the overall mine life at Jervois. The recent
findings from Marshall, particularly in KJCD434D1, represent a significant advancement in this regard, as
they reveal the intersection of a substantial copper-rich zone:
3.5 m1 @ 1.96% Cu, 12.4 g/t Ag, 0.30 g/t Au from 440.00 m
The current intersection is located 66 metres up-plunge from the original parent hole KJCD434, which
encountered notable copper grades over a thickness that may be amenable to underground mining (refer to
Figure 5).
Additional drilling activities are planned for other targets within Marshall, particularly in the Marshall Deeps
area. These targets include DHEM conductors centred on points P_MD_23A and P_MD23B as depicted in
Figure 5. These targets are backed by promising high-grade copper drilling results from KJCD557 and DHEM
conductors, providing further support for their exploration potential.
Figure 5: Longitudinal projection of the lower part of the Marshall Lode (looking west) between 250 m and 650 m depth
below surface. The new result in KJCD443D1 is shown in relation to other drilling, the mineral resource wireframe,
conductors from DHEM surveying and pierce points of targets for the current Marshall drilling program. All intersections
are quoted as estimated true thicknesses (ETT) with the exception of KJCD557 where there is insufficient nearby drilling to
determine ETT.
The purpose of the infill drilling conducted within and around the intended Reward open pit is to increase the
confidence in the mineral resource estimate to achieve a more robust mine plan and resource to reserve
conversion. Mineral resources for the Reward open pit are currently classified under JORC (2012) as
Indicated and it is anticipated that the planned infill drilling will enable this to be upgraded to Measured.
Latest drilling results from Jervois project
Thus far, the findings from infill drilling at Reward have validated the current mineral resource model. The
most recent results obtained from Reward are derived from three diamond drill holes:
KJD570 (Figure 6):
7.7 m @ 2.71% Cu, 35.4 g/t Ag, 0.63 g/t Au from 103.18 m including:
o 4.9 m @ 3.63% Cu, 44.1 g/t Ag, 0.83 g/t Au from 106.92 m
KJD571 (Figure 5)
9.6 m @ 2.64% Cu, 50.9 g/t Ag, 0.51 g/t Au from 133.15 m including:
o 2.0 m @ 6.33% Cu, 155.0 g/t Ag, 0.57 g/t Au from 139.41 m
KJD572 (Figure 6)
14.7 m @ 2.50% Cu, 25.8 g/t Ag, 0.87 g/t Au from 110.3 m including:
o 1.3 m @ 4.16% Cu, 34.6 g/t Ag, 4.20 g/t Au from 111.4 m
o 1.5 m @ 4.66% Cu, 37.2 g/t Ag, 0.56 g/t Au from 121.7 m
o 2.2 m @ 5.68% Cu, 39.0 g/t Ag, 0.81 g/t Au from 127.0 m
Figure 6 Reward deposit cross section (looking north) showing the recent results from KJD570 in relation to the resource
model wireframe, other nearby drill holes and the Feasibility Study open pit outline.
Latest drilling results from Jervois project
Figure 7 Reward deposit cross section (looking north) showing the recent results from KJD571 in relation to the resource
model wireframe, other nearby drill holes and the Feasibility Study open pit outline.
Figure 8 Reward deposit cross section (looking north) showing the recent results from KJD572 in relation to the resource
model wireframe, other nearby drill holes and the Feasibility Study open pit outline.
Latest drilling results from Jervois project
Executive Chairman Denis Wood commented, “Despite the slow start to this year’s drilling campaign at
Jervois due to the wet weather and labour availability issues, we are progressing well in three designated
areas as detailed in this report. It is satisfying to have received the initial assay results for the 2023 drilling
program, and I am pleased to announce that the results are in line with our expectations.
“The primary objective of this year's drilling is to gather data that will extend the initial mine life to 15 years of
production. To achieve this goal, our current focus is on conducting brownfields extensional resource drilling
at Rockface and Marshall, which is part of the Reward deposit.
“A secondary objective is to upgrade the JORC classification of the mineral resources within the Reward
open Pit design from JORC Indicated to JORC Measured, which is the highest classification available. This
improvement, along with the already Measured Bellbird deposit, will enhance shareholders' and investors'
confidence in the projected output of the Jervois operation during the initial 4 years of open pit mining.
“I am eagerly anticipating the opportunity to share additional drilling results as they become available.”
Table A: Reported drill hole collar details
Hole_ID
Easting
Northing
Elevation
Collar
dip
-76.85
Collar
azimuth
(grid)
89.22
Final
depth
(m)
567.1
KJCD434D1
630143.307
7494388.858
349.864
KJCD556D2
628119.866
7490999.347
KJCD556D3
628119.866
KJD570
Comment
354.429
-74.78
140.31
1089.6
7490999.347
354.429
-74.78
140.31
1131.6
630288.675
7494785
345.008
-53.42
88.69
144.1
Wedged from KJCD434
parent hole at 121.8 m
depth. HQ core to 165.3 m,
NQ to end of hole.
Wedged from KJCD556
parent hole at 496.4 m
depth. NQ core to end of
hole.
Wedged from KJCD556
parent hole at 548.1 m
depth. NQ core to end of
hole
HQ core
KJD571
630266.301
7494761.799
345.251
-55.08
89.1
168
HQ core
KJD572
630277.37
7494832.572
345.477
-53.76
88.13
145
HQ core
Latest drilling results from Jervois project
Table B: Reported drill hole intercept summary
Cu
%
Ag
g/t
Au
g/t
5.00
Estimated
true
thickness
(m)
3.50
1.96
12.40
0.30
444.00
1.00
0.70
3.35
20.60
0.53
451.80
2.06
1.40
1.44
8.60
0.16
531.40
538.80
7.41
5.20
0.40
4.80
0.02
950.95
963.50
12.55
12.10
1.64
21.40
0.38
983.58
984.80
1.22
1.20
1.70
4.90
0.11
1037.80
1038.90
1.10
1.10
1.78
2.90
0.05
1046.00
1046.98
0.98
0.90
1.66
10.80
0.25
Hole ID
Depth from
(m)
Depth to
(m)
Downhole
width
(m)
KJC434D1
440.00
445.00
incl.
443.00
449.80
KJCD556D2
KJCD556D3
KJD570
985.10
991.00
5.90
5.60
3.10
42.70
0.40
1078.00
1079.00
1.00
1.00
1.27
12.10
0.06
90.00
91.00
1.00
0.70
0.59
13.80
0.18
94.06
98.47
4.41
3.30
0.75
4.60
0.11
103.18
113.51
10.33
7.70
2.71
35.40
0.63
incl.
106.92
113.51
6.59
4.90
3.63
44.10
0.83
KJD571
133.15
145.43
12.28
9.60
2.64
50.90
0.51
incl.
139.41
141.97
2.56
2.00
6.33
155.00
0.57
KJD572
105.00
107.00
2.00
1.40
0.78
8.40
0.09
110.30
131.11
20.81
14.70
2.50
25.80
0.87
incl.
111.40
113.20
1.80
1.30
4.16
34.60
4.20
and incl.
121.70
123.80
2.10
1.50
4.66
37.20
0.56
and incl.
127.00
130.07
3.07
2.20
5.68
39.00
0.81
This announcement has been approved by the directors of KGL Resources Limited.
Lode
Marshall
Rockface
Rockface
Reward
Reward
Reward
Latest drilling results from Jervois project
Competent Person Statement
The information in this report that relates to Exploration Results and Mineral Resources is based on
information compiled by Dr James Lally, a Competent Person who is a Member of The Australasian Institute
of Mining and Metallurgy and a Member of The Australian Institute of Geologists. Dr Lally is employed by
KGL Resources as a consultant through Mining Associates Pty Ltd. He has over 25 years of experience that
is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Lally consents to the inclusion
in the report of the matters based on his information in the form and context in which it appears.
Dr Lally replaced Mr John Levings following Mr Levings’ resignation from the Company.
The following drill holes were originally reported on the date indicated and using the JORC code specified in
the table.
JORC
Date originally
Hole
Reported
Reported
Under
KJCD
556
27/09/2022
2012
KJCD
556D1
27/09/2022
2012
KJCD
434
13/05/2021
2012
KJCD
557
19/01/2023
2012
Forward Looking statements
This release includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”,
“project”, “opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify
forward looking statements. All statements, other than statements of historical fact, included herein, including
without limitation, statements regarding forecast cash flows and potential mineralisation, resources and
reserves, exploration results and future expansion plans and development objectives of KGL are forwardlooking statements that involve various risks and uncertainties. Although every effort has been made to verify
such forward-looking statements, there can be no assurance that such statements will prove to be accurate
and actual results and future events could differ materially from those anticipated in such statements. You
should therefore not place undue reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements. Statements in relation to future matters can only be made where the Company has a reasonable
basis for making those statements.
Latest drilling results from Jervois project
JORC Code, 2012 Edition – Table
1.1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
At Jervois diamond drilling was used to obtain
samples for geological logging and assaying
described in this announcement. Core samples
comprised a mixture of sawn HQ quarter core
and sawn NQ half core. Sample lengths were
generally 1m, but at times length were adjusted
to take into account geological contacts.
Reported drilling utilised HQ3 and NQ diameter
coring equipment depending on depth of drilling.
Coring diameters for reported holes are
summarised in Table A.
Navigational drilling techniques were utilised for
drilling Marshall Lode and Rockface deep
targets, with reported holes in these areas being
wedged from earlier-drilled “parent” holes at
depths specified in Table A.
Diamond drilling was cored from surface for the
reported Reward open pit holes.
Oriented core has been measured for the recent
KGL drilling.
Core recovery for reported drill holes was >95%
with the mineralised zones having virtually 100%
recovery.
No evidence has been found for any relationship
between sample recovery and copper grade and
there are no biases in the sampling with respect
to copper grade and recovery.
All KGL diamond core samples were
geologically logged. Logging in conjunction with
multi-element assays is appropriate for mineral
resource estimation.
Core samples were also orientated and logged
for geotechnical information.
All logging has been converted to quantitative
and qualitative codes in the KGL Access
database.
All relevant intersections were logged.
Drilling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Drill sample
recovery
Logging
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
Latest drilling results from Jervois project
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Quality of assay
data and
laboratory tests
Verification of
sampling and
assaying
Location of data
points
The following describes the recent KGL
sampling and assaying process:
–
HQ core was quartered with a diamond
saw and generally sampled at 1 m
intervals with samples lengths adjusted at
geological contacts;
–
NQ core was halved with a diamond saw
and generally sampled at 1 m intervals
with samples lengths adjusted at
geological contacts;
–
Diamond core samples are crushed to
70% passing 2mm and then pulverized to
85% passing 75 microns.
–
Two quarter core field duplicates were
taken for every 20m samples by Jinka
Minerals and KGL Resources.
–
All sampling methods and sample sizes
are deemed appropriate for mineral
resource estimation
KGL drilling has QAQC data that includes
standards, duplicates and laboratory checks. In
ore zones standards are added at a ratio of 1:10
and duplicates and blanks 1:20.
Base metal samples are assayed using a fouracid digest with an ICP AES finish. Gold
samples are assayed by Aqua Regia with an
ICP MS finish. Samples over 1ppm Au are reassayed by Fire Assay with an AAS finish.
All assay methods were deemed appropriate at
the time of undertaking.
Data is validated on entry into the MS Access
database, using Database check queries and
Maxwell’s DataShed.
Further validation is conducted when data is
imported into Micromine and Leapfrog Geo
software
For the KGL drilling surface collar surveys were
picked up using a Trimble DGPS, with accuracy
to 1 cm or better.
Downhole surveys were taken during drilling with
a Ranger or Reflex survey tool at 30m intervals
All drilling by Jinka Minerals and KGL is
referenced on the MGA 94 Zone 53 grid. All
downhole magnetic surveys were converted to
MGA 94 grid.
For Reward there are concerns about the
accuracy of some of the historic drillhole collars.
There are virtually no preserved historic collars
for checking.
There is no documentation for the downhole
survey method for the historic drilling.
Topography was mapped using Trimble DGPS
and LIDAR
Latest drilling results from Jervois project
Criteria
JORC Code explanation
Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Orientation of
data in relation to
geological
structure
Sample security
Audits or reviews
1.2
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling
techniques and data.
Drilling at Rockface was on nominal 50m centres
with downhole sampling on 1m intervals.
Drilling at Reward was on 25m spaced sections
in the upper part of the mineralisation extending
to 50m centres with depth and ultimately
reaching 100m spacing on the periphery of
mineralisation.
For Reward shallow oxide RC drilling was
conducted on 80m spaced traverses with holes
10m apart.
The drill spacing for all areas is appropriate for
resource estimation and the relevant
classifications applied.
A small amount of sample compositing has been
applied to some of the near surface historic
drilling.
Holes were drilled perpendicular to the strike of
the mineralization; the default angle is -60
degrees, but holes vary from -45 to -80.
Drilling orientations are considered appropriate
and no obvious sampling bias was detected.
Samples were stored in sealed polyweave bags
on site and transported to the laboratory at
regular intervals by KGL staff or a transport
contractor.
The sampling techniques are regularly reviewed
internally and by external consultants.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral tenement
and land tenure
status
Exploration done
by other parties
JORC Code explanation
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
Acknowledgment and appraisal of exploration by other
parties.
Commentary
The Jervois Project is within EL25429 and
EL28082 100% owned by Jinka Minerals and
operated by Kentor Minerals (NT), both wholly
owned subsidiaries of KGL Resources.
The Jervois Project is covered by Mineral Claims
and an Exploration licence owned by KGL
Resources subsidiary Jinka Minerals.
Previous exploration was primarily conducted by
Reward Minerals, MIM and Plenty River.
Latest drilling results from Jervois project
Criteria
Geology
JORC Code explanation
Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Commentary
EL25429 and EL28082 lie on the Huckitta 1: 250
000 map sheet (SF 53-11). The tenement is
located mainly within the Palaeo-Proterozoic
Bonya Schist on the northeastern boundary of
the Arunta Orogenic Domain. The Arunta
Orogenic Domain in the north-western part of
the tenement is overlain unconformably by NeoProterozoic sediments of the Georgina Basin.
The stratabound mineralisation for the project
consists of a series of complex, narrow,
structurally controlled, sub-vertical
sulphide/magnetite-rich deposits hosted by
Proterozoic-aged, amphibolite grade
metamorphosed sediments of the Arunta Inlier.
Mineralisation is characterised by veinlets and
disseminations of chalcopyrite in association
with magnetite. In the oxide zone which is
vertically limited malachite, azurite, chalcocite
are the main Cu-minerals.
Massive to semi-massive galena in association
with sphalerite occur locally in high grade lenses
of limited extent with oxide equivalents including
cerussite and anglesite in the oxide zone.
Generally, these lenses are associated with
more carbonate-rich host rocks occurring at
Green Parrot, Reward and Bellbird North.
Drill hole details are given in Table A in the body
of the report.
For mineralised intercept depths refer to Table B
in the body of the report.
Minimum grade cut-off is 0.5%Cu for intercepts
above 200m RL
Minimum grade cut-off is 1.0%Cu for intercepts
below 200m RL
Aggregate intercepts use length-weighting.
No top-cuts are applied nor considered
necessary
No metal equivalents are used
All intercept lengths in this announcement are
estimated true widths: in the main deposit areas,
the lode geometries are well constrained and are
used to determine true widths.
Refer to Figures in body of the report
Latest drilling results from Jervois project
Criteria
Balanced
reporting
Other substantive
exploration data
Further work
JORC Code explanation
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The nature and scale of planned further work (eg tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
Commentary
Results for all holes are reported according to
the Data Aggregation Methods stated above
Outcrop mapping of exploration targets using
Real time DGPS.
IP, Magnetics, Gravity, Downhole EM are all
used for targeting