Quarterly Activities and Cashflow Report - Dec 2024
Released
Released
Announcement PDF
ASX Announcement
Quarterly Activities Report
Quarterly
Activities
Report
Period
Ended
31 December
2024
c Period Ended 31 December 2024
c
31 Jan 2025
Highlights
Drilling Program
During the quarter, KGL Resources Limited (ASX:KGL, “KGL” or “the Company”) completed the drilling program to
support the updated Mineral Resource Estimate and mine plan for the Feasibility Study Update.
Assays from 16 holes were received and reported. Results included:
•
At Reward Deeps, hole KJD637 and KJD638 intersected a wide zone of copper mineralisation at Reward
Deeps South lode:
▪ KJD6371: 18.90 m @ 1.99% Cu2, 17.43 g/t Ag, 0.32 g/t Au from 527.00 m (Deeps South)
▪
KJD638: 8.79m @ 2.57% Cu, 36.25 g/t Ag, 0.77 g/t Au from 506.00 m (Deeps South)
whilst hole KJD639 intersected a massive sulphide zone at Reward Deeps North lode:
▪
•
KJD639: 6.28m @ 4.05% Cu, 44.22 g/t Ag, 0.42 g/t Au from 570.55 (Deeps North)
At Reward underground, strong copper intersections confirm the Reward Main Shoot and provide
confirmation in regard to extension at depth. Holes KJD640, KJD640D1 and KJD640D2 continue to
intersect a broad zone of copper mineralisation:
▪ KJD640: 1.76 m @ 1.53% Cu, 7.02 g/t Ag, 0.12 g/t Au from 454.84 m (Main Shoot) and
3.17 m @ 2.17% Cu, 10.43 g/t Ag, 0.23 g/t Au from 477.00 m
•
▪
KJD640D1: 6.33 m @ 0.89% Cu, 6.15 g/t Ag, 0.14 g/t Au from 362.70 m (Main Shoot)
▪
KJD640D2: 8.21 m @ 1.68% Cu, 7.47 g/t Ag, 0.18 g/t Au from 443.00 m (Main Shoot)
At Rockface, hole KJD627D2 intersected mineralisation 70 meters below the current resource model,
confirming the DHEM conductor and indicating that the Rockface North Lodes remain open at depth.
Mineral Resource Estimate Increase
The Company updated the Jervois Mineral Resource Estimate which has increased by 17.4% from 23.37Mt to
27.45Mt, offset by a marginal reduction in the Cu grade from 2.02% to 1.87%.
•
The contained copper has increased across the project from 472Kt to 513Kt. Silver and gold contained
metal has also increased to 22.4Moz (+14.7%) and 215Koz (+11.3%) respectively.
Feasibility Study Update
The Feasibility Study Update has progressed with a number of study areas including mine design (Open cut and
Underground), scheduling and civil works reviewed and updated by separate Tier 1 contractors.
The immediate focus of the Company remains the delivery of the Feasibility Study Update (FSU) and Independent
Technical Engineer’s report for this project.
RPMGlobal (RPM), have been appointed to act as an Independent Technical Engineer (“ITE”) and Independent
Environmental and Social Consultant (“IESC”) for the Jervois Copper Project to review the aspects of the project
and provide the written assessments that meets the requirements of financial lenders.
RPM has commenced the Independent Technical Review (ITR) of the Project which is being completed in two
phases.
1
2
All intervals in this report are estimated true thicknesses unless otherwise specified.
A cutoff grade of 0.8% copper applied to all intersections unless otherwise specified.
Page 1 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
•
Phase 1: Critical Issues Review of all FSU sections and ESG documentation.
•
Phase 2: Detailed Independent Review that delivers ITE and IESR reports across all aspects of the
Project.
The Company has also appointed Axiom Project Services to provide KGL with highly experienced project delivery
personnel to augment the existing Jervois Copper Project team. Additional resourcing is being targeted as project
milestones are achieved.
Exploration Planning
The 2024 exploration program was completed comprising 75 holes for 23,037 metres across the Jervois Project
and delivered some of the highest polymetallic grades achieved at Jervois. There are currently 35 holes which
have been drilled, awaiting detailed analysis for announcement.
Corporate
Current cash & cash equivalent as at 31st December 2024 was $5.36 million.
Subsequent to the end of the Quarter, Mr Philip Condon tendered his resignation as Chief Executive Offer As an
interim measure, the Chairman, Mr Jeff Gerard, will assume the executive functions, becoming Executive
Chairman, whilst a search for a dedicated CEO is underway.
Page 2 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Drilling Program
The goal of the 2024 drilling program was to increase confidence in the Resource Model, extend the project life at
Rockface, Reward Deeps and Marshall and support completion of the Feasibility Study Update. The Company
announced on 4th November 2024 further intersections of high-grade copper mineralisation at Reward underground
and Reward Deeps with mineralisation intersected at Rockface North Lodes at 70 meters below the current
resource model indicating Rockface North Lodes remain open at depth. The 16 holes were reported included part
of a completed infill drilling campaign at Rockface and Reward underground aimed to increase geological
knowledge and confidence, facilitating the conversion of inferred resources to indicated categories.
All 10 holes drilled at Reward Main underground intersected zones of mineralisation consistent with the resource
model. Additionally, their extension encountered further mineralisation in line with the Reward East Lodes,
significantly extending the Reward East mineralisation further south than previously modelled.
Reward Deeps
Drill holes KJD637 and KJD638, spaced 95 meters apart, targeted the Reward Deeps South Lode, specifically
addressing gaps in the resource model where substantial underground development and stoping are planned. Both
holes intersected broad zones of strong copper mineralisation. Additionally, the extensions of these holes
encountered further mineralisation consistent with the Reward East Lodes
Hole KJD639, located 75 meters north of KJD638 and aimed at a gap in the Deeps North Lode, also intersected a
broad zone of copper mineralization (Figure 1).
The best intersections are as follows:
•
KJD639:
6.28m @ 4.05% Cu, 44.22 g/t Ag, 0.42 g/t Au from 570.55 (Deeps North) including
2.53 m @ 8.12% Cu, 88.27 g/t Ag, 0.26 g/t Au from 575.00 m
2.18 m @ 0.81% Cu, 5.81g/t Ag, 0.09 g/t Au From 614.02 m (East Lodes) and
1.91 m @ 1.70% Cu, 3.06 g/t Ag, 0.13 g/t Au From 619.52m
•
KJD638:
8.79m @ 2.57% Cu, 36.25 g/t Ag, 0.77 g/t Au from 506.00 m (Deeps South) including
1.24 m @ 4.35% Cu, 26.83 g/t Ag, 0.61 g/t Au from 511.20 m including
1.57 m @ 4.07% Cu, 54.26 g/t Ag, 1.19 g/t Au From 514.30m
0.78 m @ 2.96 % Cu, 15.90 g/t Ag, 0.13 g/t Au from 564.66 m (East lodes) and
0.65 m @ 1.09 % Cu, 7.30 g/t Ag, 0.02 g/t Au From 577.20 m
•
KJD637:
18.90 m @ 1.99 % Cu, 17.43 g/t Ag, 0.32 g/t Au from 527.00 m (Deeps South) including
1.08 m @ 5.39% Cu, 38.53 g/t Ag, 0.42 g/t Au From 527.68 and including
0.72 m @ 5.21 % Cu, 41.80 g/t Ag, 0.85 g/t Au from 544.72 m and including
2.29 m @ 3.42% Cu, 27.75 g/t Ag, 0.53 g/t Au From 546.80 m and including
2.24 m @ 4.45% Cu, 38.75 g/t Ag, 0.48 g/t Au From 549.90 m
1.91 m @ 1.94 % Cu, 20.20 g/t Ag, 0.05 g/t Au from 590.94 m (East lodes) and
0.51 m @ 1.15 % Cu 7.00 g/t Ag, 0.04 g/t Au from 616.32 m
Page 3 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Figure 1. Long projection of Reward deposit showing locations of reported drill hole intersections. 2024 resource block model
blocks shown coloured by copper grade. Proposed reward open pit outline 2024. The DHEM conductor plates modelled at
Marshall Deeps. Reward East Lodes have been filtered out, which are parallel to Deeps upper part.
Reward Underground
Drilling at Reward underground was aimed at testing the geological continuity of the Reward Main shoot and to
fill gaps in the data.
All 10 holes drilled at Reward Main underground intersected zones of mineralisation consistent with the resource
model. Additionally, their extension encountered further mineralisation in line with the Reward East Lodes,
significantly extending the Reward East mineralisation further south than previously modelled.
Highlights included confirmation of the Reward Main Shoot’s extension at depth below the base of the proposed
Reward pit, with holes KJD640, KJD640D1 and KJD640D2 (Figure 3) intersecting a broad zone of copper
mineralisation:
•
KJD640:
1.76 m @ 1.53% Cu, 7.02 g/t Ag, 0.12 g/t Au from 454.84 m (Main Shoot) and
3.17 m @ 2.17% Cu, 10.43 g/t Ag, 0.23 g/t Au from 477.00m including
1.60 m @ 3.12% Cu, 13.86 g/t Ag, 0.34 g/t Au from 480.00m and
1.07 m @ 2.29% Cu, 20.46 g/t Ag, 0.40 g/t Au from 484.75 m
Page 4 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
0.59 m @ 0.97% Cu, 5.30 g/t Ag, 0.01 g/t Au from 564.94 m (East Lodes) and
0.85 m @ 1.44% Cu, 14.18 g/t Ag, 0.07 g/t Au from 568.90 m and
0.43 m @ 1.56% Cu, 1.10 g/t Ag, 0.02 g/t Au from 658.86 m
•
KJD640D1:
6.33 m @ 0.89% Cu, 6.15 g/t Ag, 0.14 g/t Au from 362.70 m (Main Shoot) including
1.79 m @ 2.92%Cu, 9.91 g/t Ag, 0.34 g/t Au from 362.70 m
•
KJD640D2:
1.52 m @ 0.87% Cu, 5.50 g/t Ag, 0.11 g/t Au from 404.65 m (Main Shoot) and
2.38 m @ 0.96% Cu, 9.03 g/t Ag, 0.08 g/t Au from 408.00m and
0.95 m @ 1.27% Cu, 4.20 g/t Ag, 0.15 g/t Au from 418.40 m and
3.53 m @ 0.85% Cu, 5.81 g/t Ag, 0.09 g/t Au from 434.00m including
0.67 m @ 3.22% Cu, 13.80 g/t Ag, 0.39 g/t Au from 444.86 m and
8.21 m @ 1.68% Cu, 7.47 g/t Ag, 0.18 g/t Au from 443.00 m including
0.82 m @ 4.92% Cu, 19.38 g/t Ag, 0.54 g/t Au from 447.75 m including
1.10 m @ 2.25% Cu, 12.67 g/t Ag, 0.16 g/t Au from 450.93 m including
0.88 m @ 2.60% Cu, 7.41 g/t Ag, 0.23 g/t Au from 455.50 m
Figure 2. Long projection of Reward deposit showing locations of reported drill hole intersections. 2024 resource block model
blocks shown coloured by copper grade. Proposed reward open pit outline 2024. The DHEM conductor plates modelled at
Marshall Deeps. Reward East Lodes have been filtered out, which are parallel to Deeps upper part.
Page 5 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Rockface
Drill hole KJD627D2 intersected the Rockface North lodes 70 meters below the current resource model,
encountering narrow zones of mineralisation. Although the intersection was not substantial, it aligns with the
orebody’s pinch-and-swell structure, and sulphide hosted in brecciated magnetite and quartz veins, confirming the
extension at greater depth. All new intersections below the 2022 resource model are expected to add
further tonnage and enhance the resource at Rockface (Figure 3).
•
KJD627D2:
0.75 m @ 1.17% Cu, 10.80 g/t Ag, 0.26g/t Au from 1086.02m and
1.36 m @ 1.86 % Cu, 7.12 g/t Ag, 0.29 g/t Au from 1096.29m.
Figure 3. Long Section of Rockface North Lodes (7490527.00 mN), copper grade >0.8%. 2024 resource block model blocks shown
coloured by copper grade. older drill hole traces shown in grey. Previously reported intersection shown in teal colour.
Page 6 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Mineral Resource Estimate Increase
The Company updated the previous Mineral Resource Estimate (ASX Release ‘Increase in JORC Measured
Resource for Jervois Update’, 23 May 2024), following the completion of the 2024 drilling program (totalling 75
holes for 23,037 meters).
This MRE update resulted in an increase in the resource of 17.4%, from 23.37Mt to 27.45Mt, particularly through
an increase in underground tonnes, chiefly at Reward and Rockface. Indicated and Inferred Resources increased
by 2.18Mt and 1.89Mt respectively for the combined Rockface and Reward areas. This was achieved via a
combination of upgrading existing inferred resources to indicated resources, additional inferred resources, and a
change to the copper cutoff from 1.0% grade to 0.8% grade for the potential underground areas. The cutoff grade
was reviewed for these areas following a reassessment of the financial inputs.
Table 1. Jervois Mineral Resource - November 2024
Resource
Material
Area
Reward
Open Cut
Potential > 0.5 % Cu
Bellbird
Underground
Potential > 0.8 % Cu
Bellbird
Rockface
Sub Total
Total
•
•
•
•
Metal
Copper
(%)
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Silver
(Moz)
2.57
1.95
48.2
0.43
50.0
4.0
35.4
1.02
1.39
37.4
0.23
14.3
1.2
7.6
Inferred
0.61
0.95
10.7
0.08
5.8
0.2
1.5
Measured
1.23
2.53
15.1
0.14
31.2
0.6
5.6
Indicated
1.26
1.45
9.1
0.17
18.2
0.4
6.8
Inferred
Indicated
Inferred
1.02
7.72
6.22
4.71
1.24
1.71
1.87
1.35
10.6
27.2
38.4
18.6
0.12
0.25
0.38
0.17
12.7
132.1
116.0
63.6
0.3
6.7
7.67
2.82
4.0
60.9
75.5
25.5
Indicated
0.35
2.26
19.0
0.14
8.0
0.22
1.6
Inferred
3.20
1.95
12.1
0.10
62.4
1.24
10.4
Indicated
3.94
2.81
24.5
0.26
110.90
3.10
32.71
Inferred
1.32
1.55
13.7
0.19
20.42
0.58
8.02
19.74
27.45
1.93
1.87
24.6
25.3
0.24
0.24
381.3
513.4
15.63
22.37
153.7
214.5
Category
Mt
Measured
Indicated
Sub Total
Reward
Grade
Gold
(koz)
Cut-off grades: 0.5% Cu grade above 200 mRL (approximately 150 m below the surface), and 0.80% Cu below 200 mRL.
Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
Inferred Resources have less geological confidence than Measured or Indicated Resources and should not have modifying factors applied to them.
It is reasonable to expect that with further exploration most of the Inferred Resources could be upgraded to Indicated Resources.
Mineral Resources are not Ore Reserves and do not have demonstrated economic viability.
Page 7 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Graph 1: Growth in scale and confidence level of Jervois Copper resource over time
Contained copper has now increased across the project from 472Kt to 513Kt. Silver and gold contained metal has
also increased to 22.4Moz (+14.7%) and 215Koz (+11.3%) respectively.
Exploration Planning
The 2024 exploration program activity targeted exploration in and around the Resource Model to extend the project
life at Rockface, Reward Deeps and Marshall and delivered some of the highest polymetallic grades achieved at
Jervois, which continues to support the growth potential within the Jervois project area. A secondary and important
goal was to increase the knowledge and understanding of our geological model at depth, furthering the
understanding of the Jervois Project geology and mineralising systems. See Figure 2 for the drilling locations which
include other supplementary targets.
The KGL exploration team have completed that program ahead of schedule, comprising of 75 holes for 23,037
meters (62 holes of diamond for 20,488m, and 13 holes of RC drilling for 2,549m) across the Jervois Project,
consistent with the 2024 exploration plan.
Having achieved its exploration objectives, KGL took the opportunity through to December to delineate additional,
near-surface resources that might be recoverable by open cut methods, targeting expansion of the planned boxcut
at Reward East and an area identified as Bellbird North (See Figure 2). The results of this additional drilling will be
available during early 2025.
The Jervois project is positioned along the crustal-scale Jervois Fault with a unique mineralisation style blending
SEDEX and IOCG characteristics. Exploration results to date demonstrate the rationale for pursuing a systematic
approach to unlocking this project's immense value. In this regard, Dr. Warwick Crowe, a globally regarded
structural geologist, was commissioned to provide a report on the exploration potential at Jervois and to provide
Page 8 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
directions for future work as part of the exploration planning process. Dr Crowe completed a site visit and field
report, and on the basis of this report, a final exploration hole for 2024 was drilled at Crowes Nest.
An ongoing work program involving geophysics and gravity and magnetic inversion analysis will be progressed in
2025 to confirm additional high potential near mine, brownfield and greenfield exploration targets for future
exploration, subject to meeting Project development priorities and the availability of finance.
Figure 4 Jervois Copper Project Drilling Locations in 2024
Page 9 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Feasibility Update
The Feasibility Study Update has progressed with several study areas completed involving separate Tier 1
contractors whilst capital and operating cost updates were also updated.
Given the positive results of the 2024 drilling campaign and associated uplift to the resource estimate, which
includes an additional 4.1Mt of underground resources. Further updates to the underground mine plan will be
completed to improve the UG contribution following the planned open cut mining the project schedule.
RPM has commenced the Independent Technical Review (ITR) of the Project which is being completed in two
phases.
•
Phase 1: Critical Issues Review of all FSU sections and ESG documentation. – targeted for the end
of January 2025
•
Phase 2: Detailed Independent Review that delivers ITE and IESR reports across all aspects of the
Project.
The Company has also appointed Axiom Project Services to provide KGL with highly experienced project delivery
personnel to augment the existing Jervois Copper Project team. Additional resourcing is being targeted as project
milestones are achieved.
The immediate focus of the Company remains the delivery of the Feasibility Study Update (FSU) and Independent
Technical Engineer’s report for this project.
Corporate
Current cash & cash equivalent as at 31st December 2024 was $5.36 million.
Subsequent to the end of the Quarter, Mr Philip Condon tendered his resignation as Chief Executive Offer to pursue
other opportunities and KGL and Mr Condon agreed that Mr Condon’s employment would end on 21 January 2025.
As an interim measure, the Chairman, Mr Jeff Gerard, will assume the executive functions, becoming Executive
Chairman, whilst a search for a dedicated CEO is underway.
Copper Market Commentary
Elevated copper M&A activity continued through the quarter with Sumitomo Metal Mining acquiring a 30% stake in
Rio Tinto’s Winu copper project. Appian Capital advisory also made an unsuccessful bid for Cyprium Metals, owner
of the Nifty copper project. Press has emerged regarding Rio Tinto being in early discussions to acquire Glencore,
partly motivated by increasing its exposure to copper through its stake in the Collahuasi mine in Chile.
Copper remains critical to fields ranging from construction to electronics, and demand is growing as increasing
demand for electricity, the upgrading and expansion of power grids, and technological advancements such as
artificial intelligence (AI) are underway. The transition to clean, low-carbon energy accounts for 26% of copper
demand, a figure projected to soar to 57% by 2040.i
This demand increase is being met with a global copper supply facing significant hurdles, as ore grades are
decreasing in quality and copper reserves are shrinking. In addition, long lead times to develop new mines are
hampering any meaningful supply response.
Page 10 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Graph 2 Source: Bloomberg NEF Transition Metals Outlook
The copper market is hence forecast to move into a growing deficit through this decade, and to grow quickly to
expand to a large deficit of 21 million tonnes per year by 2050. Illustrating this, the orange line in the chart above
represents demand, and the shaded area represents supply (and its constituents by use type).
The Company is well-positioned to deliver its high-grade Jervois Project into a copper market at a time of projected
chronic supply shortfall.
This announcement has been approved by the Board of KGL Resources Limited
Page 11 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
Jervois Project, Northern Territory
100%
ML 30182
Jervois Project, Northern Territory
100%
ML 30829
Jervois Project, Northern Territory
100%
EL 25429
Jervois Project, Northern Territory
100%
EL 30242
Mt Cornish, Northern Territory
100%
EL 28340
Yambah, Northern Territory
100%
EL 28271
Yambah, Northern Territory
100%
EL 28082
Unca Creek, Northern Territory
100%
ML 32277
Lucy Creek Borefield, Northern Territory
100%
Mining Tenements Acquired/Granted and
Disposed during the quarter*
Location
Beneficial Holding
Location
Beneficial Holding
Location
Beneficial Holding
Nil
Tenements subject to farm-in or farm-out
agreements
Nil
Tenements subject to farm-in or farm-out
agreements acquired or disposed of during the
quarter
Nil
Related Party Payments
As reported in the quarterly cash flow report part 6.1, amounts paid to related parties of $46k
consist of directors’ fees and expenses for the quarter.
Page 12 of 13
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2024
c
Forward Looking statements
This release includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”, “project”,
“opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward looking statements. All
statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast
cash flows and potential mineralisation, resources and reserves, exploration results and future expansion plans and
development objectives of KGL are forward-looking statements that involve various risks and uncertainties. Although every
effort has been made to verify such forward-looking statements, there can be no assurance that such statements will prove to
be accurate and actual results and future events could differ materially from those anticipated in such statements. You should
therefore not place undue reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements.
Statements in relation to future matters can only be made where the Company has a reasonable basis for making those
statements.
Competent Person Statement
The Mineral Resource Estimate released to the market on 23 November 2024 complies with JORC 2012. The Company
confirms that it is not aware of any new information or data that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market announcement.
The following drill holes were originally reported under the JORC code 2012 on the date indicated in the table. The Company
confirms it is not aware of any new information or data that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
Hole
KJD
KJCD
KJCD
KJCD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
KJD
i
Date originally Reported
627D1
575W1
556D4
556
637
638
639
640
640D1
640D2
627D2
625
628
572
329
413
220W1
216
395
29/07/2024
08/11/2023
08/11/2023
27/09/2022
04/11/2024
04/11/2024
04/11/2024
04/11/2024
04/11/2024
04/11/2024
04/11/2024
03/07/2024
03/07/2024
28/06/2023
29/07/2019
17/03/2020
12/12/2017
30/10/2107
04/12/2019
JORC Reported
Under
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
Bloomberg NEF: Transition Metals Outlook 2024
Page 13 of 13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
KGL Resources Limited
ABN
Quarter ended (“current quarter”)
52 082 658 080
31 December 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers – GST receipts
1.2
Payments for
Year to date
(6 months)
$A’000
392
749
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(282)
(611)
(e) administration and corporate costs
(572)
(1,283)
-
-
104
185
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Other
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(358)
(960)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(10)
(27)
(4,071)
(7,715)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(6 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – payment of security deposits
-
-
2.6
Net cash from / (used in) investing
activities
(4,081)
(7,742)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
8,082
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(33)
(133)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(154)
(352)
3.7
Transaction costs related to loans and
borrowings – lease interest
(6)
(13)
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(193)
7,584
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
9,993
6,479
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(358)
(960)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(4,081)
(7,742)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(193)
7,584
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(6 months)
$A’000
-
-
5,361
5,361
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,212
3,343
5.2
Call deposits
3,000
6,501
5.3
Bank overdrafts
-
-
5.4
Other (security deposit)
149
149
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
5,361
9,993
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
46
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(4,071)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(4,429)
8.4
Cash and cash equivalents at quarter end (item 4.6)
5,361
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
5,361
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.21
(358)
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item