Corporate Presentation
Released
Released
Announcement PDF
ASX:KGL
Corporate Presentation
Australia’s Next Significant Copper Producer
May 2026
2
Investment highlights
(1) Recovered metal, once transitioned to steady-state underground mining; (2) See ASX release titled “Baseline Economic Model Confirms Attractive Economics” dated 24 April 2026; (3) see ASX released titled “KGL Jervois Project Feasibility Study Update 2025” dated 10 February
2025 for details on copper equivalent calculations
Australia’s next pure-play high-grade copper producer
Avg. copper production of 30ktpa over LOM (up to 35 – 40ktpa)1, plus meaningful gold & silver credits
10 year mine life (18.5Mt at 1.65% Cu)2, underpinned by Ore Reserves of 14.4Mt at 1.8% Cu (2.1% CuEq)3
Copper-gold-silver concentrate – straightforward metallurgy with a conventional processing flowsheet
Attractive economics2: post-tax NPV8 of A$839m, IRR of 31%, and EBITDA of up to A$400m/year1 at US$6.06/lb Cu
Jervois is a district-scale mineralised province, covering 115km2 of highly prospective tenure
Significant near-mine extensions, with all planned mining areas remaining open at depth and laterally
Highly credible team of proven base metal mine builders and operators with decades of execution experience
Fully permitted for a 2.0Mtpa plant, shovel-ready, with funding substantially de-risked (no debt, no offtake)
3
Proven mine builders and operators
Backed by global mining experience, KGL has a highly credentialled execution team
• +40 year global mining career spanning technical, operational, commercial and executive roles across Australia,
Africa, the Americas, China and Mongolia, including +20 years at Glencore/Xstrata:
o Chief Development Officer of Glencore Xstrata, driving major acquisitions and overseeing business
integration, improvement initiatives, and operational reviews across base metals and bulks
o CEO of Katanga Mining, DRC (Glencore rep.) – one of the world’s largest copper/cobalt operations
o Chief Operating Officer of Xstrata Coal – coordinated Xstrata's greenfield and brownfield project
developments, feasibility studies, approvals, and construction, delivering a broad range of mining and
processing projects safely, on time, and within budget
o DAppChem CQ University, GAICD
Jeff Gerard
Chairman
• +30 years of global mining experience in operational and major capital projects, having worked across several
zinc and copper operations in Australia, South America and Europe, including:
o Most recently, Chief Operating Officer of Glencore Zinc (Australia), where he was responsible for the Mount
Isa Complex, McArthur River Mine, Townsville Port and Refinery, and multiple underground and open-cut
operations
o Glencore’s South American operations across Peru, Bolivia, and Argentina
o Processing manager at Lundin Mining in Portugal, where he successfully constructed and commissioned
polymetallic concentrator at the Aljustrel operation
• Bachelor of Minerals Processing Engineering (Hons) from the University of Queensland and is a Fellow of
Engineers Australia, a Member of the Australasian Institute of Mining and Metallurgy
Sam Stromayr
CEO
4
Funding substantially de-risked – Wheaton
(1) See ASX release titled “US$300mill agreement for Ag and Au Streaming with Wheaton” dated 2 April 2026. The US$300m Wheaton funding package is subject to the conditions referred to in the cross-referred announcement, including FIRB approval being
received by Wheaton and evidence of early works expenditure, compliance with customary working capital testing, provision of an early works budget with respect to early development of the Project, and entry into of the security and guarantees associated with the
precious metals stream; (2) Weighted average economic interest over the LOM (as per the Baseline Economic Model) based on: 75% of payable gold & silver until 45koz Au and 4.3Moz Au delivered, reducing to 37.5% of produced gold & silver until an additional
15koz Au and 1.7Moz Ag is delivered, and thereafter reducing to 25%. Wheaton to acquire the delivered ounces for 20% of the prevailing spot price
US$300m financing package with Wheaton Precious Metals (WPM) provides certainty, flexibility and
alignment at an attractive cost of capital
What it delivers …
Attractive cost of capital
Covenant light
Copper remains fully unencumbered
KGL retains a ~50% economic interest in gold &
silver by-products over the initial LOM, increasing
to 80% thereafter2
Extensive technical due diligence validates
Jervois
Wheaton’s first investment in Australia
US$300m strategic funding package1, comprising:
– US$275m precious metals stream (gold & silver),
including a US$32m early works deposit
– US$25m cost overrun facility
Wheaton secures a ~50% economic interest in Jervois’
gold & silver by-product over the initial LOM (10-years),
reducing to 20% thereafter2
A$35m conditional commitment to participate in any
future equity raising by KGL in connection with funding
Jervois1
Substantially de-risked funding for Jervois
5
Corporate summary
(1) A$300m converted at an AUD:USD FX rate of 0.717. The US$300m Wheaton funding package is subject to the conditions referred to in the cross-referred announcement, including FIRB approval being received by Wheaton and evidence of early
works expenditure, compliance with customary working capital testing, provision of an early works budget with respect to early development of the Project, and entry into of the security and guarantees associated with the precious metals stream;
Well-funded with over A$400m of undrawn stream proceeds (not debt) and supportive shareholders
Capital Structure
A$0.29
Share price (19 May 2026)
771m
Shares on issue
A$224m
Market capitalisation
A$8m
Cash (31 March 2026)
Nil
Debt
A$216m
Enterprise value
A$418m1
Undrawn, stream proceeds (not debt)
Board of Directors
Jeff Gerard (Chairman)
Lindi Deguara (Independent NED)
Brian Gell (Independent NED)
Ferdian Purnamasidi (NED)
Kylie Anderson (Company Secretary)
33%
10%
5%
5%
47%
KMP (Salim Family)
RCF
Marshall Plenty
Konwave
Other
Senior Management
Sam Stromayr (CEO)
Anthony Liaw (CFO)
Konrad Litfin (Project Director)
Atiq Amiri (Exploration Manager)
Megan Sharp (ESG)
Share price (KGL:ASX) – 12 months (A$/share)
-
$0.10
$0.20
$0.30
$0.40
May-25 Aug-25 Nov-25 Feb-26 May-26
6
Jervois Copper Project
7
Overview of the Jervois Copper Project
(1) ) See ASX release titled “Baseline Economic Model Confirms Attractive Economics” dated 24 April 2026; (2) calculated based on from the Production Target outlined in the BEM study dated 24 April 2026 (18.5Mt ore, 304kt Cu, 148koz Au, 14.8Moz Ag); (3) 14.4Mt in Ore
Reserves and 18.5Mt in mining inventory; (4) commodity price and FX assumptions: US$6.06/lb Cu, US$80.75/oz Ag, US$4,834/oz Au, AUD:USD of 0.717; (5) net of by-product credits; (6) transitional = 726kt at 1.6% Cu and oxide = 478kt at 2.0% Cu; (7) oxide & transitional
recoveries expected to be lower than the 92% sulphide recoveries
Near-term, high-grade copper mine with compelling economics, low operating costs, clear permitting status
and substantial leverage to copper prices and exploration success
Jervois is a large mineral-rich system in the NT
– Mineral Resources of 27Mt @ 1.9% Cu, 25.3g/t Ag, 0.2g/t Au
– 95% of Resources are in sulphides (low oxide & transitional)
– Mineralisation is open at depth and laterally
– District-scale regional exploration upside
Robust 10-year mine life1
– Avg. 30ktpa Cu recovered over LOM (up to 35 – 40ktpa)1
– Mining inventory of 18.5Mt @ 1.65% Cu, 25g/t Ag, 0.25g/t Au1,2
– 78%3 of LOM underpinned by Ore Reserves (98% in first 2 years)
– Low-risk commissioning on sulphide only (stockpile the trans. & oxide)
Straightforward metallurgy
– Sulphides = 92% Cu recovery (95% of Resources)
– High-grade Cu concentrate (26%), with Au & Ag credits
– Conventional process flow sheet (2.0Mtpa capacity)
Attractive economics1,4
– Post-tax NPV8% of A$839m and IRR of 31%
– LOM EBITDA of A$3,226m and average AISC of US$2.51/lb5
– Peak funding of A$584m, including A$145m of mining costs incurred
to stockpile transitional & oxide ore6,7 (batch processed later in LOM)
8
Jervois is a large, mineral-rich system
The Jervois mineralised system is large, unique, and underexplored – IOCG, VHMS and SEDEX
– 27.5Mt @ 1.87% in Resources
across three deposits:
1. Rockface
2. Reward; and
3. Bellbird
– All Resources remain open at
depth and laterally
– The Jervois exploration license
covers 38km2
– +12km of mineralised strike
– 78% of the “J-Fold” remains
undrilled …
– … majority of drilling to date
(257km) has been focused on
de-risking known Resources at
Rockface, Reward and Bellbird
– Several walk-up growth targets
Rockface MRE
5.3Mt @ 2.5% Cu, 22g/t Ag, 0.2g/t Au
Bellbird MRE
7.1Mt @ 1.9% Cu, 12.2g/t Ag, 0.1g/t Au
Reward MRE
15.1Mt @ 1.7% Cu, 32.7g/t Ag, 0.3g/t Au
1 2 3
1
2
3
1
3
2
9
EBITDA profile (A$m)3 – financial year
Compelling baseline physicals and economics
Summary of the Baseline Economic Study (BEM) – April 2026
Value
Unit
Assumption1,2,3
10
Years
Mine life
3,226
A$m
LOM EBITDA
1,070
kdmt
Concentrate produced (LOM)
Production
30
ktpa
Avg. Copper LOM
24
Ktpa
Avg. Copper OP (year 2 – 5)
34
ktpa
Avg. Copper UG (year 6 – 10)
1.1
Mozpa
Avg. Silver
9
kozpa
Avg. Gold
Operating and capital costs
1.65
US$/lb
C1 cash costs (LOM avg.)
2.51
US$/lb
AISC (LOM avg.)
439
A$m
Project construction capital
584
A$m
Peak funding
145
A$m
Incl. mining & stockpiling (ox. & trans.)
Economic return
1,226
A$m
Pre-tax NPV8
37
%
Pre-tax IRR
839
A$m
Post-tax NPV8
31
%
Post-tax IRR
(108)
211 218
148 163
371
404
454
308
264
19
Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Yr 11
Open pit
Underground
Tonnes mined by source (open pit & underground, kt)3 – financial year
1,540
2,595
1,364
1,614
1,255
431
- - - - -
9
376
1,040
1,452
1,527 1,594
1,799
1,498
424
Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Yr 11
Open Pit Underground
(1) See ASX release titled “Baseline Economic Model Confirms Attractive Economics” dated 24 April 2026; (2) Commodity price and FX assumptions: US$6.06/lb Cu, US$80.75/oz Ag, US$4,834/oz Au, AUD:USD of 0.717; (3) Sourced from the Baseline Economic Model (April 2026)
underpinning the Baseline Economic Model outcomes disclosed in ASX release titled “Baseline Economic Model Confirms Attractive Economics” dated 24 April 2026; (4) US$1,000/t Cu
Sensitivity (post-tax NPV)
+/- US$0.45/lb4 Cu = +/- A$140m
+/- 10% upfront capex = +/- A$32m
10
2
26
27
21
25
36
39
40
32
24
6
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Recovered Copper (kt)
Copper production profile
(1) See ASX release titled “Baseline Economic Model Confirms Attractive Economics” dated 24 April 2026 slight rounding differences; (2) Recovered metal in concentrate; (3) Subject to exploration and infill success
Jervois copper production profile (kt, Cu)1,2
Increase in the sustained production
profile will be via potential extension of
existing underground mines and/or
potential new open pit mine targets across
the Jervois project area3
LOM average to 30ktpa Cu (up to 35 – 40ktpa)… plus meaningful gold & silver by-products
Open pit
(Avg. ~25ktpa Cu over 4 years)
Underground
(Avg. ~34ktpa over 5 years)
11
Mining profile
(1) Sourced from the Baseline Economic Model (April 2026) underpinning the Baseline Economic Model outcomes disclosed in ASX release titled “Baseline Economic Model Confirms Attractive Economics” dated 24 April 2026
Tonnes mined, ore sources by mining area (kt)1
Open-pit mining before transitioning to higher-grade undergrounds
-
500
1,000
1,500
2,000
2,500
3,000
Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Yr 11
Bell Bird OP Reward OP Bell Bird UG Reward UG Rockface UG Marshall UG
>95% Ore Reserves
kt, ore
12
0
500
1,000
1,500
2,000
2,500
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Underground Open Pit
Processing profile
Tonnes processed, open pit & underground (kt)1
Low-risk commissioning on open-pit ore
kt, ore
(1) Sourced from the Baseline Economic Model (April 2026) underpinning the Baseline Economic Model outcomes disclosed in ASX release titled “Baseline Economic Model Confirms Attractive Economics” dated 24 April 2026
13
Reward open pit & underground mine
Drill hole data on this slide sourced from ASX announcements dated 18 March 2025, 4 November 2024, 3 July 2024, 24 January 2024, 19 December 2023, 28 June 2023, 13 May 2021, 4 May 2022, 22 September 2021, 14 April 2020, 17 March 2020
Reward oblique 3D view _ looking northwest
Low-risk, high-grade staged open pit followed by underground mining
Prolific mineralised system … and open
* Estimated true width (ETW)
Reward Open Pit*
• 9.9m @ 2.1% Cu, 33g/t Ag, 0.3g/t Au (KJD606)
• 4.15m @ 5.0% Cu, 126g/t Ag, 0.41g/t Au (KJD628)
• 4.41m @ 6.40% Cu, 75g/t Ag, 0.33g/t Au (KJD625)
• 17.9m @ 3.90% Cu, 97g/t Ag, 0.38g/t Au (KJD382)
• 13.6m @ 2.00% Cu, 25g/t Ag, 0.29g/t Au (KJD586)
• 14.7m @ 2.50% Cu, 26g/t Ag, 0.87g/t Au (KJD572)
• 3.72m @ 6.38% Cu, 101.3 g/t Ag, 0.50 g/t Au (KJD458D1)
• 6.27m @ 4.53% Cu, 90.8 g/t Ag, 0.42 g/t Au (KJD428)
• 8.0m @ 6.10% Cu, 164.3g/t Ag, 0.62g/t Au (KJD382)
Reward Underground (Main Shoot)*
• 7.34m @ 3.98% Cu, 33.8 g/t Ag, 0.30 g/t Au (KJCD446)
• 4.47m @ 3.81% Cu, 22.0 g/t Ag, 0.05 g/t Au (KJCD447)
• 4.87m @ 3.35% Cu, 12.3g/t Ag, 0.16g/t Au (KJCD504)
• 3.87m @ 4.60% Cu, 24.7 g/t Ag, 0.31 g/t Au (KJCD499)
• 4.87m @ 3.35% Cu, 12.3 g/t Ag, 0.16 g/t Au (KJCD504)
• 8.1m @ 3.57% Cu, 87.2g/t Ag, 0.56g/t Au (KJCD418)
Reward Underground (Deeps)*
• 10.6m @ 3.1% Cu, 28.5g/t Ag, 1.07g/t Au (KJD413)
• 9.88m @ 2.25% Cu, 31.9 g/t Ag, 1.03 g/t Au (KJCD438)
• 9.04m @ 3.27% Cu, 70.3 g/t Ag, 0.63 g/t Au (KJD411)
• 6.28m @ 4.05% Cu, 44.22 g/t Ag, 0.42 g/t Au (KJD639)
• 2.63m @ 4.54% Cu, 31.16 g/t Ag, 0.46 g/t Au (KJD641D3)
OPEN
Showing the proposed 2 stages of open pit, underground development,
mining stopes, and key holes with copper intersections above 3%
14
Bellbird open pit & underground mine
Drill hole data on this slide sourced from ASX announcements dated: 21 October 2021, 17 March 2020, 04 December 2014
Robust, broad-zoned starter pit with supplementary underground
Bellbird Open Pit*
• 5.30m @ 3.66% Cu, 29.1 g/t Ag, 0.29 g/t Au (KJD456)
• 4.68m @ 3.90% Cu, 20.6 g/t Ag, 0.21 g/t Au (KJD408)
• 3.85m @ 3.74% Cu, 19.9 g/t Ag, 0.58 g/t Au (KJD449)
• 5.45m @ 3.62% Cu, 15.8 g/t Ag, 0.15 g/t Au (KJD450)
• 4.46m @ 4.68% Cu, 38.3 g/t Ag, 0.12 g/t Au (KJD455)
• 9.4m @ 2.01% Cu, 7.2g/t Ag, 0.05g/t Au (KJD406)
• 7m @ 8.88% Cu, 95.5g/t Au, 0.29g/t Au (JOC304)
• 15m @ 3.66% Cu, 21.2g/t Ag, 0.5g/t Au (JOC297)
• 9m @ 4.25% Cu, 8g/t Ag, 0.29g/t Au (JOC305)
• 8m @ 5.63% Cu, 36.2g/t Ag, 0.14g/t Au (JOC081)
• 16m @ 1.69% Cu, 5.7g/t Ag, 0.07g/t Au (JOC300)
• 13m @ 2.29% Cu, 19.2g/t Ag, 0.15g/t Au (JOC090)
• 16m @ 4.85% Cu, 30g/t Ag, 0.45g/t Au (JOC093)
• 19m @ 2.94% Cu, 16.3g/t Ag, 0.11g/t Au (JOC089)
* Estimated true width (ETW)
Broad zones of high-grade mineralisation
support a low-risk starter pit
Supplementary underground tonnes
accessed from the base of the pit
Mineralisation remains open
Walk-up infill targets for potential near-term
mine life extensions
Infill drilling target for
possible near-term
lateral mine life
extension
Proposed 1.2km
decline to Rockface
Bellbird oblique 3D view _looking northwest
Showing the proposed open pit, satellite pit, UG development, mining stopes and
proposed decline to rockface, and key holes with copper intersections above 3%
15
Rockface underground mine
High-grade, consistent and open – clear potential for mine life extension
Rockface oblique 3D view _ looking southwest
Drill hole data on this slide sourced from ASX announcements dated: 29 July 2024, 8 November 2023, 28 June 2023, 27 September 2022, 14 February 2022, 04 September 2017, 09 February 2017, 19 September 2016
Accessed from
Bellbird
Drilling BELOW the mine plan*
• 5.1m @ 6.74% Cu, 331g/t Ag, 5.4g/t Au (KJD627D1)
• 4.1m @ 3.6% Cu, 200g/t Ag, 0.65g/t Au (KJCD556D4)
• 12.4m @ 2.6% Cu, 24g/t Ag, 0.34g/t Au (KJCD556)
• 5.6m @ 3.1% Cu, 143g/t Ag, 0.40g/t Au (KJCD556D3)
• 5.0m @ 2.4% Cu, 18.1g/t Ag, 0.55g/t Au (KJCD575W1)
Drilling within the mine plan*
• 23.2m @ 5.1% Cu, 22.4g/t Ag, 0.22g/t Au (KJCD203)
• 7.5m @ 9.0% Cu, 45.5g/t Ag, 0.60g/t Au (KJCD201)
• 4.5m @ 18.9% Cu, 396.8g/t Ag, 0.42g/t Au (KJCD481D3)
• 4.2m @ 20.5% Cu, 302g/t Ag, 1.09g/t Au (KJCD481D6)
• 7.4m @ 7.5% Cu, 36g/t Ag, 0.89g/t Au (KJCD208D1)
• 6.6m @ 11.5% Cu (KJCD197)
• 10.5m @ 7.1% Cu, 29.4g/t Ag, 0.89g/t Au (KJCD197)
• 6.0m @ 9.2% Cu, 38.1g/t Ag, 0.29g/t Au (KJCD215)
• 10.2m @ 4.7% Cu, 23.0g/t Ag, 0.26g/t Au (KJCD215)
• 2.2m @ 12.8% Cu, 218.4g/t Ag, 0.71g/t Au (KJCD481D7)
Consistent high-grade orebody
Clear opportunity for mine life extension
Large DHEM conductor at depth
Investigating lateral parallel extensions
* Estimated true width (ETW)
Showing decline, UG
development, mining stopes
and key holes with
intersection above 3% copper,
as well as the latest and
deepest DHEM conductor
below the currently proposed
mine plan
16
Rapidly advancing Jervois to production
Build out the KGL management team
Including the appointment of an experienced project delivery team
Baseline Economic Model (BEM – April 2026)
Open pit optimisation, mill feed increase, metallurgical recovery improvement, costs updated, risk assessment & mitigation measures
Funding substantially secured via US$300m Wheaton Precious Metals stream
Balance of project capital eminently financeable via debt, offtake and/or equity
Appoint the preferred EPC contractor and open-pit contract (targeting Q2’CY26)
Select offtake partner (copper fully unencumbered)
Highly competitive with a wide range of available outcomes, including negative TC/RCs and mine gate solutions
Approve FID and commence earthwork & construction activities (targeting Q3, CY26)
17
Timeline
Targeting commissioning in 1H’28
2029
2028
2027
2026
Calendar Year
Funding
Major contract
Design & long-lead items
Early works
Construction
Open pit mining
Stockpiling of oxide/trans/sulphides
Plant commissioning & ramp up
Steady-state
Exploration
FID
First sulphide
mill feed
18
Regional Exploration & New Mining Area Targets
19
KGL’s Integrated 3D Inversion Model
Integrated 3D geophysical modelling to refine & prioritise drill targets
During the past 10 years, over 30 mineralised targets have
been identified via soil sampling and drilling - over both
Jervois / Unca Creek tenements
Reward, Rockface and Bellbird are just the tip of the
pyramid
KGL has recently developed an Integrated 3D Inversion
Model (2025), which has:
Assisted KGL to prioritise these targets for potential mine
life extension
Identified prominent low-resistivity areas, 3km below the
surface:
– beneath the Bellbird-Rockface trend and
– along the centre of the J Fold
The model provides the strongest geophysical evidence to date
that Jervois hosts a significantly larger and deeper mineral
system than previously identified
20
Potential new mining areas
The Integrated 3D Inversion Modelling has confirmed existing and identified numerous exploration targets
Area 1: Central J-fold structure, which
may be associated with the single
domain models’ trend of Scarpe /
Crowes Nest
Area 2: South of Bellbird Area 3: South of Rockface Area 4: Continuation of the Reward
South trend on the eastern limb of the
main J-Fold
Exploration targets are significantly larger than the existing mining
areas that support the planned Jervois project
21
Integrated 3D MT assessment – new mine area targets
Area 1
• Area 1: Central J-fold structure, which may be associated with
the single domain models’ trend of Scarpe / Crowes Nest
• Area 2: South of Bellbird
• Area 3: South of Rockface
• Area 4: Continuation of the Reward South trend on the
eastern limb of the main J-Fold
Area 2
Magnetic-image-guided Joint MT _longsection over Bellbird
Area 2 Area 1
Magnetic-image-guided Joint MT _longsection over Rockface
Area 3 Area 1
Magnetic-image-guided Joint MT _longsection over Reward
Area 4
22
Unlocking the Jervois mineral-rich province
The broader Jervois province covers 115 km² – three times the size of the Jervois Copper Project area
Unca Creek (EL28082) is adjacent to the Jervois Copper Project area
and triples the size of KGL’s foothold over the broader Jervois mineral
province from 38km2 to 115km2
The Jervois MRE is constrained within the Jervois Copper Project area,
which is 1/3rd the size of the broader Jervois mineral province
Unca Creek shares geological similarities with Jervois and is located
within the highly prospective Bonya Metamorphics, a sequence of
metamorphic rocks known for hosting significant mineralisation
Soil and rock chip sampling has confirmed continuous trends of copper
mineralisation, with soil assays up to 2080 ppm and rock chip samples
as high as 23% Cu
The tenement hosts multiple walk-up drill targets identified through
geochemical sampling, reconnaissance mapping, and geophysical
surveys
The development of Jervois and the establishment of critical
infrastructure (processing, ancillary, etc.) will provide the
foundation for KGL to unlock the Jervois mineral-rich province,
supporting a potential multi-decade district-scale operation
23
Key takeaways
Set to become Australia’s next pure-play copper producer
Avg. copper production of 30ktpa over LOM (up to 35 – 40ktpa) plus meaningful gold & silver credits
Fully permitted and shovel ready
Highly credible team of proven base metal mine builders and operators with decades of execution experience
US$300m strategic financing package with Wheaton substantially de-risks project funding
Straightforward metallurgy and conventional processing
Attractive base case economics
Significant near-mine extensions with all planned mining areas remain open at depth and laterally
10-year mine life, significantly underpinned by Ore Reserves
Appendix – Competent Person Disclosures
25
Jervois Mineral Resource
26
Jervois Ore Reserve
27
Competent Persons’ Statements
The information in this report that relates to the Jervois Mineral Resources Estimates was first released to the market on 25 November 2024 and prepared in
accordance with JORC 2012. The company confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
The information in this report that relates to the Jervois Ore Reserves Estimate was first released to the market on 10 February 2025 and prepared in accordance
with JORC 2012. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and
have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
The information in this announcement that relates to a Production Target and the forecast financial information derived from the production was first released to the
market on 24 April 2026. KGL Resources Limited confirms that all the material assumptions underpinning the production target and forecast financial information
derived from the production target continue to apply and have not materially changed.
The information in this announcement relating soil and rock chip sampling was first released to the market on 16 May 2017. The Company confirms it is not aware of
any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
The information relating to 3D Inversion results was originally reported on 30 July 2025. The Company confirms it is not aware of any new information or data that materially
affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed.
28
Competent Persons’ Statements
The following drill holes were originally reported under the JORC code 2012 on the date indicated in the table. The Company confirms it is not aware of any new
information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
JORC Reported
Under
Date Originally
Reported
Hole
2012
21/07/2014
81
JOC
2012
21/07/2014
89
JOC
2012
21/07/2014
90
JOC
2012
21/07/2014
93
JOC
2012
19/09/2016
197
KJCD
2012
13/12/2016
201
KJCD
2012
9/02/2017
203
KJCD
2012
1/08/2017
215
KJCD
2012
4/12/2014
297
JOC
2012
4/12/2014
300
JOC
2012
4/12/2014
304
JOC
2012
4/12/2014
305
JOC
2012
4/12/2019
382
KJD
2012
17/03/2020
406
KJD
2012
17/03/2020
408
KJD
2012
17/03/2020
411
KJD
2012
17/03/2020
413
KJD
2012
17/03/2020
415
KJD
2012
14/04/2020
416
KJD
2012
14/04/2020
418
KJCD
2012
13/05/2021
428
KJD
2012
20/07/2021
438
KJCD
2012
22/09/2021
446
KJCD
JORC Reported
Under
Date Originally
Reported
Hole
2012
22/09/2021
447
KJCD
2012
21/10/2021
449
KJD
2012
21/10/2021
450
KJD
2012
21/10/2021
455
KJD
2012
21/10/2021
456
KJD
2012
4/05/2022
499
KJCD
2012
4/05/2022
504
KJCD
2012
27/09/2022
556
KJD
2012
19/12/2023
586
KJD
2012
1/11/2024
606
KJD
2012
3/07/2024
625
KJD
2012
3/07/2024
628
KJD
2012
4/11/2024
639
KJD
2012
6/06/2024
208D1
KJCD
2012
22/09/2021
458D1
KJD
2012
10/11/2021
481D3
KJCD
2012
8/12/2021
481D6
KJCD
2012
8/12/2021
481D7
KJCD
2012
28/06/2023
556D3
KJD
2012
8/11/2023
556D4
KJD
2012
8/11/2023
575W1
KJD
2012
29/07/2024
627D1
KJD
2012
18/03/2025
641D3
KJD
29
Metal Equivalents (JORC Code)
Copper Equivalent basis for Mineral Resource Estimate cut-off calculations.
Copper Equivalent uses a copper price of USD $4.90/lb, silver price of USD $32/oz and a gold price of USD $2400/oz, and a Bi penalty of US$1.5/dmt for every
100ppm over 1200ppm in the concentrate.
Fresh recoveries; Copper 92.7%, silver 65%, gold 65%, and bismuth 65%. Oxide recoveries; Copper 50%, silver 45%, gold 45%, and bismuth 50%. E.g. Cu 0.5%, Ag
20 g/t, Au 0.2 g/t and 100ppm Bi, the formula is Cu % + 0.478 x Au g/t +0.0068 x Ag g/t - 0.000074 x Bi ppm.
Copper Equivalent basis for LOM
Copper Equivalent uses a copper price of USD $6.06/lb, silver price of USD $80.75/oz and a gold price of USD $4834/oz, and a Bi penalty of US$1.5/dmt for every
100ppm over 1200ppm in the concentrate.
(Cu t*Cu price*2204.6+Au oz*1000*Au Price + Ag oz *10^6* Ag Price)/(Cu Price*2204.6)
The recoveries assumed in the calculation are based upon detailed test work as detailed in the FSU25 released to the market on 10 February 2025.
It is the Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to be recovered and sold.
30
Forward Looking Statements
This announcement includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”, “project”,
“opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward looking statements. All
statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast
cash flows and potential mineralisation, resources and reserves, exploration results and future expansion plans and
development objectives of KGL are forward-looking statements that involve various risks and uncertainties. Although every effort
has been made to verify such forward-looking statements, there can be no assurance that such statements will prove to be
accurate and actual results and future events could differ materially from those anticipated in such statements. You should
therefore not place undue reliance on such forward-looking statements. Statements regarding plans with respect to the
Company’s mineral properties may contain forward looking statements. Statements in relation to future matters can only be
made where the Company has a reasonable basis for making those statements.
Share your feedback
Discover