Quarterly Activities Report
Period Ended 31 March 2024
30 April 2024
Drilling Results / Exploration Program
•
Final results of the successful 2023 drilling campaign were announced during the quarter.
Reward infill drilling intersected shallow high-grade copper and silver within the planned open pit
KJD613 1: 2.8m @ 8.37% Cu, 127.3 g/t Ag, 1.42 g/t Au from 30.35m including:
1.8m @ 11.80% Cu, 183.7 g/t Ag, 1.76 g/t Au from 30.35m
KJD614: 6.7m @ 3.13% Cu, 40.9 g/t Ag, 0.46 g/t Au from 19.00m including:
1.6m @ 9.25% Cu, 71.3 g/t Ag, 1.64 g/t Au from 20.00m
Deeper intersections within the Reward open pit design confirmed thick zones of strong copper with
higher grade cores.
KJD608: 11.7m @ 2.00% Cu, 54.1 g/t Ag, 0.32 g/t Au from 73.00m including:
2.3m @ 4.52% Cu, 108.3 g/t Ag, 0.85 g/t Au from 79.81m
KJD612: 10.4m @ 3.25% Cu, 90.6 g/t Ag, 0.34 g/t Au from 123.80m including:
3.2m @ 6.62% Cu, 195.7 g/t Ag, 0.61 g/t Au from 130.00m
At Rockface, high-grade copper intersections in the Rockface Main and Main Foot Wall (“FW”) Lodes
confirmed and strengthened the geological modelling.
KJCD215D2: 5.0m1 @ 9.80% Cu, 42.3 g/t Ag, 0.64 g/t Au from 577.48m
KJCD215D2: 12.1m @ 4.23% Cu, 21.0 g/t Ag, 0.33 g/t Au from 596.14m
•
Drilling recommenced during the quarter with two diamond drilling rigs with a focus on resource
extensions and an increase in mine life which can add materially to the value of the Project.
Progressing key project development activities
•
KGL is continuing to progress studies to improve key value drivers and financing options for the project as
we move along the development pathway towards the important milestones of Final Investment Decision
(FID) and financing for the project.
•
An update of the Feasibility Study, issued in November 2022, is expected to be released end Q3,
beginning Q4 2024.
Corporate
•
Resignation of Mr. Denis Wood as Executive Chairman. Ms. Kylie Anderson has been appointed as
interim CEO. Search for a permanent Chief Executive Officer continues.
•
Mr. Jeff Gerard has assumed the role of Independent Chairman.
•
Current cash & cash equivalent as at 31 March 2024 was $10.9 million.
1 All thicknesses quoted in this report are estimated true thickness unless otherwise specified.
KGL Resources Limited | Quarterly Activities Report
Page 1 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Drilling Results / Exploration Program
Growing the high-grade copper resource and mine life at Jervois continues to be a key value driver for KGL
Resources Limited (“KGL” or “the Company”).
Surging demand for copper – driven by the clean energy transition and demand from modern technologies
including semiconductors and the digital economy (data centres & AI industry), together with supply challenges,
low inventories and a lack of investment in exploration and new mine projects has analysts forecasting a chronic
shortfall in copper over the next decade commencing in 2024, ahead of schedule.
KGL believes an increased focus on its exploration program in 2024 has the potential for resource extensions
at existing deposits and an increase in mine life which can add materially to the value of the Project.
Final Results of 2023 Drilling program
During the quarter, KGL announced the final results of its infill drilling program at Reward (ASX Announcement
dated 24/1/24). The program was focused on getting the initial years to JORC measured status, which is
necessary for financing. An updated Mineral Resources Estimate for Reward is now being prepared. Drilling
predominantly focused on the Marshall Lode, positioned as the southernmost lode in the Reward deposit. The
Marshall Lode and Reward Main Lode, along with Bellbird, are key areas slated for exploitation through open pits
during the initial phases of mining operations.
Of note are the results from KJD613 and KJD614 within the Marshall Lode, revealing high-grade copper with
appreciable silver and gold in the near-surface deposits.
Marshall Lode
KJD613 2:
2.8m @ 8.37% Cu, 127.3 g/t Ag, 1.42 g/t Au from 30.35m including:
1.8m @ 11.80% Cu, 183.7 g/t Ag, 1.76 g/t Au from 30.35m
KJD614:
6.7m @ 3.13% Cu, 40.9 g/t Ag, 0.46 g/t Au from 19.00m including:
1.6m @ 9.25% Cu, 71.3 g/t Ag, 1.64 g/t Au from 20.00m
Within the Marshall lode, high-grade occurrences extend to deeper levels. These instances of elevated copper
grades are observed within thicker mineralised zones, as evidenced by the three intersections highlighted below.
The outcomes from these drillholes serve to reinforce and validate the existing mineral resource model, as
depicted in Figure 1 and Figure 2.
KJD606:
9.9m @ 2.07% Cu, 32.9 g/t Ag, 0.30 g/t Au from 39.00m including:
2.9m @ 3.24% Cu, 26.4 g/t Ag, 0.60 g/t Au from 46.80m
KJD608:
11.7m @ 2.00% Cu, 54.1 g/t Ag, 0.32 g/t Au from 73.00m including:
2.3m @ 4.52% Cu, 108.3 g/t Ag, 0.85 g/t Au from 79.81m
KJD612:
10.4m @ 3.25% Cu, 90.6 g/t Ag, 0.34 g/t Au from 123.80m including:
3.2m @ 6.62% Cu, 195.7 g/t Ag, 0.61 g/t Au from 130.00m
2 All thicknesses quoted in this report are estimated true thickness unless otherwise specified.
KGL Resources Limited | Quarterly Activities Report
Page 2 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Figure 1. Longitudinal projection of the Reward open pit profile as approved in the Mining Management Plan,
showing the reported drill holes (labelled white dots) and the current Reward mineral resource block model.
Previous drilling shown as smaller black dots
Figure 2. Cross section showing the thick copper intersection in KJD606 and KJD608 demonstrating consistency
with the current mineral resource block model.
KGL Resources Limited | Quarterly Activities Report
Page 3 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Rockface
In the ASX Announcement dated 26/3/24, KGL announced the final results of its 2023 infill drilling program at
Rockface.
As well, the infill drilling at Rockface has just been completed to bring the resource status from inferred to
indicated which is necessary for conversion to reserve and for financing. Assays and analysis of the Rockface
holes are underway.
Rockface Hole KJCD215D2 is a wedged daughter hole from KJCD215, which was drilled in May 2017, and assay
results were announced on 4 September 2017 3. Significantly, KJCD215 intersected 2 high-grade zones of copper
mineralisation in the Rockface Main Lode. These results indicate that the Main Lode has split into two nearparallel lodes, namely Rockface Main Lode and Rockface Main FW Lode, both carrying significant widths of highgrade copper.
KJCD215: 6.0m @ 9.21% Cu, 38.1 g/t Ag, 0.29 g/t Au from 587.5m (Main Lode)
KJCD215: 10.2m @ 4.74% Cu, 23.0 g/t Ag, 0.26 g/t Au from 610.09m (Main FW Lode)
Hole KJCD215D2 was drilled to provide further definition and confirmation of the position of the lower terminus of
the RF Main Lode. The results from this hole confirm and strengthen the geological modelling and high-grade
copper intersections in both the Main and Main FW Lodes (
Figure 3).
KJCD215D2: 5.0m @ 9.80% Cu, 42.3 g/t Ag, 0.64 g/t Au from 577.48m (Main Lode) incl.
3.3m @ 11.06% Cu, 44.5 g/t Ag, 0.36 g/t Au from 577.48m and incl.
1.1m @ 10.71% Cu, 55.8 g/t Ag, 1.80 g/t Au from 582.80m
KJCD215D2:12.1m @ 4.23% Cu, 21.0 g/t Ag, 0.33 g/t Au from 596.14m (Main FW Lode)
3 KGL Resources ASX announcement Jervois Copper Project – Further High-grade Copper discovered at Rockface. 4/09/2017
KGL Resources Limited | Quarterly Activities Report
Page 4 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Figure 3: Cross section highlighting the results in KJCD215D2 which improved the definition of the Rockface Main and Main
FW Lodes. The inset to the right shows the position of the detailed diagram in relation to the surface terrain.
Another significant intersection in the Rockface Main Lode was obtained in KJD617. The intersection comprised a
wide zone of robust copper mineralisation containing higher-grade sub-intervals. Once more, this hole was drilled
to ascertain more information on the Main and Main FW Lodes, and in this case, the two splits have become
amalgamated (Figure 4).
KJD617:
10.8m @ 2.73% Cu, 15.2 g/t Ag, 0.19 g/t Au from 455.77 incl.
2.6m @ 5.03% Cu, 23.2 g/t Ag, 0.25 g/t Au from 459.51m and incl.
1.9m @ 3.55% Cu, 26.0 g/t Ag, 0.37g/t Au from 467.95m
Other holes at Rockface targeted the margins of the modelled lodes. KJCD611 targeted the upper boundary of the
Rockface North Lode and intersected a narrow but high-grade copper zone (Figure 5):
KJCD611: 1.3m @ 6.17% Cu, 44.8 g/t Ag, 0.45 g/t Au from 416.85m (North Lode)
KGL Resources Limited | Quarterly Activities Report
Page 5 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Figure 4: Cross section showing the intersection in KJD617 which improves definition of the bifurcation on the
Rockface Main and Main FW Lodes
Figure 5 Longitudinal Projection of the Rockface Main Lodes showing pierce points of all drilling. Red =
holes reported in this document. Mauve = proposed targets for H1 2024
The results of KJD615, 618,611 and 604 are consistent with the edge of the Rockface mineralisation and were
drilled to define the resource limits.
KGL Resources Limited | Quarterly Activities Report
Page 6 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
2024 Drilling program
For 2024, the company plans to have 2 rigs operating concurrently with the option of adding a third rig.
The priorities for the exploration program in 2024 include:
•
Infill drilling at Reward underground area to upgrade inferred to indicated status
Targeted Resource Extensions:
o Rockface shallow to intermediate depths
o Rockface Deeps extension
o Reward Deeps extension
• Review other open cut resource opportunities based on previous drilling programs
Rockface remains open for further drilling at depth, with the deepest hole at Rockface intercepting strong copper
and gold grades. Near term targets, including shallow to intermediate depths and Rockface depth extensions,
continue to be worked up based on drilling results and geophysics with a focus on expanding the resource and
extending the mine life of this high-grade deposit.
•
The Reward deposit also remains open at depth. Near term targets include infill drilling within the Reward
underground area and Reward Deeps extensions.
The distinctive J-shape of the outcropping mineralised system has a strike length of some 12 km. The Jervois and
Unca Creek deposits remain under-explored and highly prospective for high grade copper, gold and silver. Our
understanding of the geological structures continues to grow and utilising state of the art exploration methods, our
focus going forward will be on identifying additional high grade near mine extensions to the current resource.
KGL has drilled a 2km stratigraphic hole drilled to improve our understanding of the geological structures at depth.
Progressing Project Development Activities
KGL is continuing with the studies to improve key value drivers and financing options for the project as we move
along the development pathway towards the important milestones of Final Investment Decision (FID) and
financing for the project. An update of the Feasibility Study, issued in November 2022, is scheduled for release at
the end of Q3/ beginning of Q4 2024.
An updated JORC Resource estimate is underway for the Reward open cut and underground areas and once
finalised, will be used to further refine the Reward mine plan. Already part of the planning is a doubling the size of
the mining equipment thereby increasing the mining rate. This has positive implications for the timing of the
underground mine development as well as labour requirements. KGL prepared a revised Mining Management
Plan, which has been approved by the NT Government, to accommodate a larger open-cut shell.
Proposed process plant configuration changes will also reduce the amount of labour required on-site for
construction and increases the annual processing rate from 1.6 Mtpa to 2.0 Mtpa. The plant will utilise a
conventional crushing, SAG and ball mill comminution circuit and energy efficient Jameson Cell technology in the
flotation circuit.
We are continuing to work with key contractors and each level of government and the local community to ensure
we can deliver a cost competitive project, on time.
Once an updated Feasibility Study is completed, KGL will be in a position to initiate an Independent Technical
Review (ITR) ahead of a decision regarding FID and to progress financing for the project, when market conditions
are supportive.
KGL Resources Limited | Quarterly Activities Report
Page 7 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Corporate
Current cash & cash equivalent as at 31 March 2024 was $10.9 million.
During the quarter, KGL announced the resignation of Mr. Denis Wood as Executive Chairman due to health
reasons. The Board expressed their gratitude to Mr. Wood for his absolute dedication to the Company over the
last almost 9 years. Ms. Kylie Anderson has been appointed as interim CEO to ensure business continuity and
transfer of corporate knowledge. Ms. Anderson has been with the Company since 2008.
Mr. Jeff Gerard has assumed the role of Independent Chairman.
KGL will continue its search for a permanent Chief Executive Officer as it advances the Jervois project along the
development pathway towards being in a position to reach FID.
Copper Market Commentary
The outlook for the Copper Market in the medium term has recently improved with analysts forecasting a deficit in
supply commencing in 2024 due to accelerating mine supply disruptions together with a surge in demand from the
clean energy transition and modern technologies including semiconductors and the digital economy (data centres
& AI industry).
Over 60 countries at the recent COP28 Climate Summit 4 supported a plan to triple the global renewable energy
capacity by 2030. Achieving this level will require huge amounts of copper to be produced in the coming years. In
fact, higher renewable energy targets could push the global copper demand up by an additional 4.2 million tonnes.
In addition, data centres and the AI industry are expected to drive significant copper demand growth. Ben Cleary,
Portfolio Manager with Tribeca Investment Partners, notes that “If you use Nvidia’s assumption on AI demand
growth for 2030, it implies we could eventually be at a level where data centres require an additional ~10% of
copper demand to that currently forecasted. If you also consider demand from other nations, not least China, the
disparity becomes more significant.” 5
However, accelerating supply challenges, low inventories, a lack of investment in exploration and new mine
projects and the impact of industry wide cost inflation requiring a sustained increase in the incentive price to
develop new projects, has analysts forecasting a chronic shortfall in copper over the next decade commencing in
2024, 12 months ahead of schedule.
Rio Tinto’s new Chairman, Dominic Barton, recently commented at the Ecosperity conference in Singapore that
“Low rates of investment in the global mining sector have put the global energy transition at risk, widening the
supply gap in critical minerals like copper…the gap is humungous, and I am actually very worried about whether
we will be able to close (it)".
According to BHP’s chief economist, Dr Huw McKay, the cumulative industry wide capex bill out to 2030 to bring
10 Mt of copper online could reach one–quarter of a trillion dollars. 6
The copper market is facing a structural deficit that will be very hard to solve without much higher prices.
Analysts from the likes of Bank of America and Citi predict prices will average over US$10,000/t (US$4.54/lb) by
the end of this year and US$12,000/t (US$5.45/lb) by 2026. Citi also sees a path up to $15,000/t (US$6.80/lb) by
2026 in their bull-case scenario.
4 www.unfccc.int/decisions 7/CP.28
5 Copper on $US15,000 trajectory as supply disruptions hit home.
12/04/2024 Angela East
https://mining.com.au/copper-on-us15000-trajectory-as-supply-disruptions-hit-home
6 BHP’s Economic and Commodity Outlook February 2024
KGL Resources Limited | Quarterly Activities Report
Page 8 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
According to Bank of America analysts, copper is increasingly ‘dancing to its own tune’, with prices of the red
metal forecast to reach about $12,000 per tonne by 2026. BofA analysts are tracking an energy transition and
technology-driven decoupling of the metal from traditional commodity markets and broader economic cycles. Tight
copper mine supply is increasingly constraining refined production, the bank said, adding the lack of mine projects
is finally starting to affect markets, according to Michael Widmer, a commodity strategist and co-author of an April
8 report. “The pronounced lack of new mine projects has begun to bite, constraining refined copper production
and spotlighting years of underinvestment in copper exploration and development,” Widmer wrote. The tension
between demand and supply, coming as capital costs at mines rise while copper prices are slower to catch up,
leads to significant price projections and concerns over the metal’s availability for essential technologies in the
near term. The bank’s price forecast reflects the severity of the supply constraint amidst rising demand. 7
Goldman Sachs (GS) recently noted at the CRESCO Symposium in Chile that copper is in the foothills of what will
be its Everest over the next 3-5 years. GS view is that the copper price will surge into next year (GSe 2025
$15,000/t (US$6.80/lb) average), expecting copper to rise to $10,000/t (US$4.54/lb) by year-end and then
$12,000/t (US$5.45/lb) by end of Q1-25’ as scarcity pressures mount. 8
Olivia Markham, co-manager of the BlackRock World Mining Fund recently stated that copper needs to reach
$12,000/t (US$5.45/lb) to incentivize large-scale investments in new mines. 9 Robert Friedland, Founder and Chair
of Ivanhoe Mines, recently stated that for the big copper porphyry mines in Latin America, copper at $15,000/t
(US$6.80/lb) is needed stable for a long period of time to spur new mines. 10 Other industry participants have
called for US$6-$8/lb copper as the minimum price range to incentive material investment into new copper
projects. 11
The high-grade Jervois Copper Project is well positioned to benefit from the expected long-term structural deficit in
copper and the copper price increase required to incentivize new production.
This announcement has been approved by the board of KGL Resources Limited.
7 The big crunch us here as copper decouples from market cycles, Bank of America says. Henry Lazenby.
12/04/2024 https://www.mining.com./the-big-crunch-is-here-as-copper-decouples-from-market-cycles-bank-ofamerica-says/
8 Goldman Sachs Research Report – Copper’s time is now. 15/03/2024
9 BlackRock Says $12,000 Copper is Needed to Incentivize New Mines (Bloomberg, 25/04/2024)
10 Bloomberg Interview, 15/12/2023
11 Nicole Adshead-Bell, Chair, Director Cupel Advisory Corp.
KGL Resources Limited | Quarterly Activities Report
Page 9 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
Jervois Project, Northern Territory
100%
ML 30182
Jervois Project, Northern Territory
100%
ML 30829
Jervois Project, Northern Territory
100%
EL 25429
Jervois Project, Northern Territory
100%
EL 30242
Mt Cornish, Northern Territory
100%
EL 28340
Yambah, Northern Territory
100%
EL 28271
Yambah, Northern Territory
100%
EL 28082
Unca Creek, Northern Territory
100%
ML 32277
Lucy Creek Borefield, Northern Territory
100%
Mining Tenements Acquired/Granted and
Disposed during the quarter*
Location
Beneficial Holding
Location
Beneficial Holding
Location
Beneficial Holding
Nil
Tenements subject to farm-in or farm-out
agreements
Nil
Tenements subject to farm-in or farm-out
agreements acquired or disposed of during the
quarter
Nil
Related Party Payments
As reported in the quarterly cash flow report part 6.1, amounts paid to related parties of $159k
consist of directors’ fees and expenses for the quarter.
KGL Resources Limited | Quarterly Activities Report
Page 10 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
Forward Looking statements
•
•
This presentation includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”, “project”,
“opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward looking statements. All
statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast cash
flows and potential mineralisation, resources and reserves, exploration results and future expansion plans and development
objectives of KGL are forward-looking statements that involve various risks and uncertainties. Although every effort has been made
to verify such forward-looking statements, there can be no assurance that such statements will prove to be accurate and actual
results and future events could differ materially from those anticipated in such statements. You should therefore not place undue
reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements. Statements
in relation to future matters can only be made where the Company has a reasonable basis for making those statements.
Competent Person Statement
The following drill holes were originally reported on the date indicated and using the JORC code specified in the table. The Company confirms it is not
aware of any new information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed.
Date originally
Reported
`Hole
KJD
KJCD
KJCD
KJD
KJCD
KJD
613
614
606
608
612
617
215
215D2
615
618
611
607
601
610
605
603
600
596
588
591
595
586
592
597
590
602
KGL Resources Limited | Quarterly Activities Report
24/01/2024
24/01/2024
24/01/2024
24/01/2024
24/01/2024
26/03/2024
4/09/2017
26/03/2024
26/03/2024
26/03/2024
26/03/2024
24/01/2024
24/01/2024
24/01/2024
24/01/2024
24/01/2024
24/01/2024
19/12/2023
19/12/2023
19/12/2023
19/12/2023
19/12/2023
19/12/2023
19/12/2023
19/12/2023
24/01/2024
JORC
Reported
Under
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
Page 11 of 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
KGL Resources Limited
ABN
Quarter ended (“current quarter”)
52 082 658 080
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers – GST receipts
1.2
Payments for
Year to date
(9 months)
$A’000
196
962
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(314)
(1,078)
(e) administration and corporate costs
(426)
(2,279)
-
-
114
535
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Other
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(431)
(1,860)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(101)
(153)
(2,051)
(9,423)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – payment of security deposits
-
-
2.6
Net cash from / (used in) investing
activities
(2,152)
(9,576)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(58)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings – lease
payments
(44)
(130)
3.7
Transaction costs related to loans and
borrowings – lease interest
(4)
(11)
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(48)
(199)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
13,510
22,514
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(431)
(1,860)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(2,152)
(9,576)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(48)
(199)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
10,879
10,879
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
4,878
7,509
5.2
Call deposits
6,001
6,001
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
10,879
13,510
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
159
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
0
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(2,051)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(2,482)
8.4
Cash and cash equivalents at quarter end (item 4.6)
10,879
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
(431)
10,879
4.38
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A