Half Year Accounts
Released
Released
Announcement PDF
KGL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
FINANCIAL STATEMENTS FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
CONTENTS
PAGE
DIRECTORS’ REPORT
1
AUDITOR’S INDEPENDENCE DECLARATION
15
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND
OTHER COMPREHENSIVE INCOME
16
CONDENSED CONSOLIDATED BALANCE SHEET
17
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
18
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
19
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
20
DIRECTORS’ DECLARATION
25
INDEPENDENT AUDITOR’S REVIEW REPORT
26
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
The directors of KGL Resources Limited present their report on the consolidated entity consisting of KGL
Resources Limited (KGL, Company) and the entities it controlled for the half-year ended 31 December
2023 (Group).
DIRECTORS
The names of the directors who held office during the half-year and up to the date of this report were:
DIRECTOR
POSITION HELD
Mr D. Wood
Executive chairman
Mr F. Purnamasidi
Non-executive director
Mr J. Gerard
Independent non-executive director
Mr. B. Gell
Independent non-executive director
PRINCIPAL ACTIVITY
The principal continuing activity of the Group during the half-year period was the exploration and
development of the Jervois Copper Project (Project) in the Northern Territory.
REVIEW OF OPERATIONS
OVERVIEW
During the half-year to 31 December 2023, the Company continued to progress the Jervois Copper Mine
Project (Project) along the development pathway towards the important milestones of Final Investment
Decision (FID) and financing for the Project, which is subject to an improvement in market conditions and
confidence that we can adequately address short term industry-wide challenges relating to labour
shortages, cost inflation and supply chain disruptions which may impact the ability to deliver a cost
competitive project on time.
Major work programs progressed during the period included:
•
A successful resource drilling campaign to enhance mineral resource categorisation and to expand
the Group’s mine plans with a focus on the Reward and Rockface deposits.
•
Ongoing work on optimisation studies to improve key value drivers and financing options for the
Project.
Ongoing discussions and negotiations with key contractors and each level of government and the
local community to ensure we can deliver a cost competitive project, on time.
•
DRILLING RESULTS / EXPLORATION PROGRAM
Growing the high-grade copper resource and mine life at the Project continues to be a key value driver for
the Company’s shareholders.
The results of the drilling program in 2023 were pleasing, confirming extensions to mineralisation at
Rockface and providing data to increase confidence in the open pit resource at Reward.
Reward
▪
Reward resource infill drilling confirmed shallow high-grade copper zones as well as deeper thick
intersections, containing zones of high-grade copper within the open pit design at the Reward-Main
Lode and the Reward-Marshall Lode potentially contributing to the Project’s economic viability.
Rockface
▪
Rockface remains open for further drilling at depth, with the deepest hole at Rockface intercepting
strong copper and gold grades.
▪
Infill drilling focused on shallow to intermediate depths where existing data is limited and revealed
additional high-grade copper mineralisation, potentially extending upward the mine plan. An additional
seven drill holes are awaiting assay results. Infill and exploratory drilling will continue.
1
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
The 2023 drilling program has been centred around four specific target areas:
▪
▪
▪
▪
Reward-Marshall Lode shallow to intermediate resource infill drilling.
Reward Main Lode shallow to intermediate resource infill drilling.
Rockface depth extensions.
Rockface shallow to intermediate resource infill drilling.
REWARD
The purpose of the infill drilling conducted within and around the intended Reward open pit was to increase
the confidence in the mineral resource estimate to deliver a more robust mine plan and mineral resource
to ore reserve conversion. Mineral resources for the Reward open pit are currently classified under JORC
(2012) as Indicated and infill drilling is aimed at improving these to Measured resource status.
The findings from infill drilling at Reward are largely consistent with the current mineral resource model
and have been a key driver in the Group’s decision to review options for prioritising mining of the Reward
deposit and the potential to increase the size of the Reward open pit.
In the ASX Announcement dated 24th January 2024, final assay results for Reward Main Lode and RewardMarshall Lode, the two areas to be exploited by the Reward open pit mine, confirmed findings of nearsurface, high-grade copper contributing valuable insights to the Project's potential and economic viability.
Of note are the results from KJD613 and KJD614 within the Marshall Lode, revealing high-grade copper
with appreciable silver and gold in the near-surface deposits.
Marshall Lode
KJD6131:
▪
2.8m @ 8.37% Cu, 127.3 g/t Ag, 1.42 g/t Au from 30.35m including:
1.8m @ 11.80% Cu, 183.7 g/t Ag, 1.76 g/t Au from 30.35m
KJD614:
▪
6.7m @ 3.13% Cu, 40.9 g/t Ag, 0.46 g/t Au from 19.00m including:
1.6m @ 9.25% Cu, 71.3 g/t Ag, 1.64 g/t Au from 20.00m
Within the Marshall lode, high-grade occurrences extend to deeper levels. These instances of elevated
copper grades are observed within thicker mineralised zones, as evidenced by the three intersections
highlighted below. The outcomes from these drillholes serve to reinforce and validate the existing mineral
resource model, as depicted in Figure 2 and Figure 3.
1
All thicknesses quoted in this report are estimated true thickness unless otherwise specified.
2
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REVIEW OF OPERATIONS (CONTINUED)
Marshall Lode (continued)
KJD606:
▪
9.9m @ 2.07% Cu, 32.9 g/t Ag, 0.30 g/t Au from 39.00m including:
2.9m @ 3.24% Cu, 26.4 g/t Ag, 0.60 g/t Au from 46.80m
KJD608:
▪
11.7m @ 2.00% Cu, 54.1 g/t Ag, 0.32 g/t Au from 73.00m including:
2.3m @ 4.52% Cu, 108.3 g/t Ag, 0.85 g/t Au from 79.81m
KJD612:
▪
10.4m @ 3.25% Cu, 90.6 g/t Ag, 0.34 g/t Au from 123.80m including:
3.2m @ 6.62% Cu, 195.7 g/t Ag, 0.61 g/t Au from 130.00m
Figure 1. Longitudinal projection of the Reward planned open pit showing the reported drill holes (labelled white dots) and
the Reward mineral resource block model. Previous drilling shown as smaller black dots.
Figure 2. Cross section showing the thick copper intersection in KJD606 and KJD608 demonstrating consistency with the
mineral resource block model.
3
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REVIEW OF OPERATIONS (CONTINUED)
Main Lode
Of note are the results from KJD588 and KJD586 within the Reward Main Lode, revealing high-grade
copper with appreciable silver and gold in the near-surface deposits. Refer to Figure 3.
KJD588:
▪
14.8m @ 1.55% Cu, 18.2 g/t Ag, 0.32 g/t Au from 17.00m including:
2.1m @ 3.53% Cu, 30.7 g/t Ag, 0.69 g/t Au from 18.00m
KJD586:
▪
13.6m @ 2.00% Cu, 25.3 g/t Ag, 0.29 g/t Au from 57.30 including:
5.7m @ 3.35% Cu, 35.8 g/t Ag, 0.47 g/t Au from 71.00m
Figure 3. Cross section showing the wide copper intersection in KJD586 and KJD588 demonstrating consistency with the
mineral resource block model.
ROCKFACE
During the half-year, assay results were received for two deep holes at Rockface, namely KJCD575W1
and KJCD556D4. KJCD575W1 is the second deepest hole drilled at the Project, yielding the deepest
copper intersection recorded on the property. Notably, it encountered high-grade stringer copper
mineralisation over an estimated true width of 5 m situated approximately 130 metres below the Feasibility
Study mine plan, at Rockface.
Deepest hole at Rockface intersects strong copper and gold in KJCD575W1:
▪
5.0 m2 @ 2.43% Cu, 0.55 g/t Au, 18.1 g/t Ag from 1,132.5 m including:
2.1 m @ 3.53% Cu, 1.01 g/t Au, 21.5 g/t Ag from 1,134.54 m
High-grade copper-zinc-lead-silver massive sulphides discovered in deep Rockface drillhole KJCD556D4:
▪
4.1 m @ 3.59% Cu, 20.49% Zn, 4.32% Pb, 199.9 g/t Ag, 0.65 g/t Au from 990.0 m
2
All thicknesses quoted in this report are estimated true thickness unless otherwise specified.
4
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REVIEW OF OPERATIONS (CONTINUED)
ROCKFACE (CONTINUED)
Following a recent Downhole Electromagnetic (DHEM) survey, a conductor was identified
(KJCD575W1_on-hole), correlating with the mineralisation found in the hole. This conductor is interpreted
to persist beyond the actual point of intersection (Figure 4). KJCD556D4 intercepted a 4.1 m true thickness
of massive sulphide mineralisation, which contains substantial amounts of sphalerite (zinc sulphide) as
well as copper and lead sulphides plus high silver grades. However, the exact extent and importance of
these zinc-rich massive sulphides remains uncertain and will necessitate further drilling for a
comprehensive assessment.
Figure 4 Long Projection of the deeper portion of the Rockface North Lodes showing the two most recent results. (N.B.
topographical surface is +365m RL). (colours serve to differentiate the physical boundaries conductor plates but do not relate
to any quality of the conductor).
Recent drilling efforts at Rockface have primarily focused on exploring deep holes to discover extensions
of the Rockface North Lode at significant depths. This exploration technique involves an iterative process
combining drilling and DHEM geophysics. The Group has previously reported successful results from this
approach and has plans to continue exploring at greater depths in the upcoming year.
Concurrently, there's a recognition that there is potential to refine and potentially expand the high-grade
Rockface Main Lode mineralisation, particularly at shallow to intermediate depths.
Four holes discussed in this report were strategically designed (Figure 6). Each of these holes intersected
copper mineralisation exceeding 1% Cu, as outlined in Table 1. Notably, the result from KJD582 is
particularly significant as it revealed an extended high-grade copper zone, which is expected to positively
impact the adjustment of the mineral resource model in an upward direction and expand the mine plan
(Figure 5).
5
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REVIEW OF OPERATIONS (CONTINUED)
ROCKFACE (CONTINUED)
Table 1: Mineralised intersections in recent Rockface drilling
Figure 5 Cross section of KJD582 At Rockface, which show the position of the strong high-grade copper intercept above the
currently planned extent of stoping.
6
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REVIEW OF OPERATIONS (CONTINUED)
ROCKFACE (CONTINUED)
Figure 6: Plan view of the 4 holes targeting the Rockface Main lode at shallow to intermediate depth.
Initial Drilling Program in 2024
The emphasis of the current infill drilling campaign at the Rockface resource will continue to be on shallow
to intermediate depths, where existing drilling data is relatively limited. This strategic approach has been
adopted to capitalise on the potential for resource expansion in these specific areas.
Rockface remains open for further drilling at depth, with the deepest hole at Rockface intercepting strong
copper and gold grades. Near term targets, including intermediate depths and Rockface depth extensions,
continue to be worked up based on drilling results and geophysics with a focus on expanding the resource
and extending the mine life of this high-grade deposit.
Having achieved our goal of a minimum 10-year mine life and based on recent exploration success, KGL
is currently drilling an initial 2km stratigraphic hole to improve our understanding of the geological structures
at depth and the origin of the mineralising processes which have led to the deposition of the known copper
deposits.
It is expected that the drill core and assay data from this hole, once added to the integrated 3D model of all
exploration drilling results and ground geophysics, will provide stratigraphic and structural information which
will assist in identifying target areas for follow up drilling.
The potential to add considerable value by extending the mine life justifies our focused exploration program.
Ongoing exploration success can add materially to the value of the project as it drives capital efficiencies,
cashflow and IRR improvement. A robust market for copper may also provide KGL with additional
production options in the mine plan.
7
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REVIEW OF OPERATIONS (CONTINUED)
PROGRESSING PROJECT DEVELOPMENT ACTIVITIES
During the half-year, the Group continued to progress optimisation studies to improve key project value
drivers including productivity improvements that will support Project financing.
This ongoing process is geared towards refining the economic, technical, and environmental aspects of the
Project. The optimisation efforts are anticipated to yield an optimised Feasibility Study, providing a detailed,
comprehensive, refined and definitive assessment of the Project's viability and potential for long-term
success.
Significant work has been undertaken to quantify the impact of potentially expanding the open pit mine plan
and increasing the size of the mining equipment that results in higher and more efficient open pit mining
rates. This will effectively delay the capital development of the underground mines whilst, smoothing capital
expenditure and peak labour and accommodation requirements.
Proposed process plant configuration enhancements will also reduce the amount of labour required on-site
for construction and increases the annual processing rate from 1.6 Mtpa to 2.0 Mtpa. The plant will utilise
a conventional crushing, SAG and ball mill comminution circuit and energy efficient Jameson Cell
technology in the flotation circuit.
Discussions are ongoing in relation to the contracts for supply, construction and operation of the process
plant.
The Group will continue to work with key contractors and each level of government and the local community
to ensure we can deliver a cost competitive project, on time, as we move the project along the development
pathway towards the Financial Investment Decision (FID).
A critical milestone on the horizon is the FID, contingent upon prevailing market conditions. The decision
to move forward with the Project will be carefully evaluated based on economic factors, market dynamics,
and other relevant considerations. This prudent approach ensures that the Project aligns with favourable
conditions, thereby maximising the likelihood of success and sustainability in the long run. The FID serves
as a pivotal point in the Project timeline, signifying a commitment to advancing the Project towards its goal
of becoming a successful and economically viable venture.
COPPER MARKET COMMENTARY
The outlook for the Copper Market in 2024/2025 has recently improved with a number of analysts
forecasting a deficit in supply in 2024 due to mine supply disruptions together with expectations of an
acceleration of the clean energy transition with over 60 countries at the recent COP28 Climate Summit
supporting a plan to triple the global renewable energy capacity by 2030. Achieving this level will require
huge amounts of copper to be produced in the coming years. In fact, higher renewable energy targets could
push the global copper demand up by an additional 4.2 million tonnes. Based on these expectations,
analysts believe copper prices could rise to US$15,000/t (US$6.80/lb) in 2025. 3
The high-grade Project is well positioned to benefit from the expected long-term structural deficit in copper
and the copper price increase required to incentivise new production. Recent commentary from industry
participants calls for US$6-$8/lb copper as the minimum price range to incentive material investment into
new copper projects (Cu price as at 11 March 2024 is US$3.89/lb).4
3
Bank of America (December 2023 Report) quoted in CNBC Article, 2/1/2024: Copper could skyrocket over 75% to record highs by
2025 — brace for deficits, analysts say by Lee Ying Shan.
4
Nicole Adshead-Bell, Chair, Director Cupel Advisory Corp.
8
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REVIEW OF OPERATIONS (CONTINUED)
CHANGES TO THE SENIOR MANAGEMENT TEAM
Mr Anthony Liaw was appointed Chief Financial Officer (CFO) in December 2023. Anthony, a Certified
Public Accountant and Chartered Tax Adviser, started his career with Pricewaterhouse Coopers and Ernst
Young in Singapore and has worked as a CFO and Tax Director with global commodity and production
companies.
Mr Nick Spencer resigned as Chief Executive Officer (CEO) on 30 January 2024. The Board has resumed
its executive search for a CEO.
FEDERAL GOVERNMENT: COPPER IS A STRATEGIC MINERAL
Governments are increasingly recognising that dependence on foreign sources of critical materials creates
a strategic vulnerability for their economy and military in the face of adverse foreign government actions,
natural disasters, and other events that could disrupt supplies.
With chronic shortfalls in copper forecast over the next decade and challenges in supply from the traditional
low-cost markets of Chile and Peru, Australia has the opportunity to grow its critical minerals wealth and
become an important player in developing secure, reliable and sustainable global supply chains for copper
that are internationally competitive.
Many states in Australia, including the Northern Territory, have recognised copper as a critical mineral. The
Australian federal government recently announced that copper is to be included on the newly created
Strategic Materials List.
FINANCIAL REVIEW
For the six-month period ended 31 December 2023:
▪ The Group recorded a loss after taxation of $1,097,841 (31 December 2022: loss of $1,439,239),
▪ $7,572,292 (31 December 2022: $5,558,398) was capitalised to exploration and evaluation assets; and
The Group cash reserve as at 31 December 2023 was $13,509,556.
MATERIAL BUSINESS RISKS
The Group’s exploration and mining operations will be subject to the normal risks of mining and any
revenues will be subject to numerous factors beyond the Group’s control. The material business risks that
may affect the Group are summarised below.
FUTURE CAPITAL RAISINGS
The Group’s ongoing activities are expected to require substantial further financing, in addition to amounts
raised pursuant to the entitlement offer completed in May 2023 and continue its drilling campaign. The
Group will require additional funding to bring the Jervois Copper Project into commercial production. Any
additional equity financing may be dilutive to shareholders and may be undertaken at lower prices than the
current market price, and debt financing, if available, may involve restrictive covenants which limit the
Group’s operations and business strategy.
Although the directors believe that additional capital can be obtained, no assurances can be made that
appropriate capital or funding will, if and when needed, be available on terms favourable to the Company
or at all. If the Company is unable to obtain additional financing as needed, it may be required to reduce,
delay or suspend its operations and this could have a material adverse effect on the Group’s activities and
could affect the Group’s ability to continue as a going concern.
9
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
MATERIAL BUSINESS RISKS (CONTINUED)
EXPLORATION RISK
The success of the Group depends on the delineation of economically mineable reserves and resources,
access to required development capital, movement in the price of commodities, securing and maintaining
title to the Group’s exploration and mining tenements and obtaining all consents and approvals necessary
for the conduct of its exploration activities. Exploration on the Group’s existing tenements may be
unsuccessful, resulting in a reduction in the value of those tenements, diminution in the cash reserves of
the Group and possible relinquishment of the tenements. The exploration costs of the Group are based on
certain assumptions with respect to the method and timing of exploration. By their nature, these estimates
and assumptions are subject to significant uncertainties and, accordingly, the actual costs may materially
differ from these estimates and assumptions.
Accordingly, no assurance can be given that the cost estimates and the underlying assumptions will be
realised in practice, which may materially and adversely affect the Group’s viability. If the level of operating
expenditure required is higher than expected, the financial position of the Group may be adversely affected.
The Group may also experience unexpected shortages or increases in the costs of consumables, spare
parts, plant and equipment.
FEASIBILITY AND DEVELOPMENT RISKS
It may not always be possible for the Group to exploit successful discoveries which may be made in areas
in which the Group has an interest. Such exploitation would involve obtaining the necessary licences or
clearances from relevant authorities that may require conditions to be satisfied and/or the exercise of
discretions by such authorities. It may or may not be possible for such conditions to be satisfied. The Group
continues to assess the economic viability of a potential mine through completion of final investment
decision (FID) works, including contract negotiations being undertaken aimed at reducing development risks
for the Jervois Copper Project. There is a risk, even if satisfactory contractual arrangements are put in place,
the Jervois Copper Project may not be successfully developed for commercial and/or financial reasons.
REGULATORY RISK
The Group’s operations are subject to various Commonwealth, State and local laws and plans, including
those relating to mining, prospecting, development permit and licence requirements, industrial relations,
environment, land use, royalties, water, native title and cultural heritage, mine safety and occupational
health. Approvals, licences and permits required to comply with such rules are subject to the discretion of
the applicable government officials. No assurance can be given that the Group will be successful in obtaining
or maintaining such approvals, licences and permits in full force and effect without modification or
revocation. To the extent such approvals are required and not retained or obtained in a timely manner or at
all, the Group may be curtailed or prohibited from continuing or proceeding with production and exploration.
The Group’s business and results of operations could be adversely affected if applications lodged for
exploration licences are not granted.
Mining and exploration tenements are subject to periodic renewal. The renewal of the term of a granted
tenement is also subject to the discretion of the relevant Minister. Renewal conditions may include increased
expenditure and work commitments or compulsory relinquishment of areas of the tenements comprising the
Group’s projects. The imposition of new conditions or the inability to meet those conditions may adversely
affect the operations, financial position and/or performance of the Group. It is also possible that, in relation
to tenements which the Group has an interest in or will in the future acquire such an interest in, there may
be areas over which legitimate common law native title rights of Aboriginal Australians exist. If native title
rights do exist, the ability of the Group to gain access to tenements (through obtaining consent of any
relevant landowner), or to progress from the exploration phase to the development and mining phases of
operations may be affected. The Group has a registered Indigenous Land Use Agreement with the
traditional owners for its Jervois Copper Project.
10
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
MATERIAL BUSINESS RISKS (CONTINUED)
OCCUPATIONAL HEALTH AND SAFETY
Given the Group’s exploration activities (and especially if it achieves exploration success leading to mining
activities), it will face the risk of workplace injuries which may result in workers’ compensation claims,
related common law claims and potential occupational health and safety prosecutions. Further, the
production processes used in conducting any future mining activities of the Group can be dangerous. The
Group has, and intends to maintain, a range of workplace practices, procedures and policies which will
seek to provide a safe and healthy working environment for its employees, visitors and the community.
LIMITED OPERATING HISTORY OF THE GROUP
The Group has limited operating history on which it can base an evaluation of its future prospects. If the
Group’s business model does not prove to be profitable, investors may lose their investment. The Group’s
historical financial information is of limited value because of the Group’s lack of operating history and the
emerging nature of its business. The prospects of the Group must be considered in the light of the risks,
expenses and difficulties frequently encountered by companies in their early stage of development,
particularly in the mineral exploration sector, which has a high level of inherent uncertainty.
KEY PERSONNEL
In formulating its exploration programs, feasibility studies and development strategies, the Group relies to
a significant extent upon the experience and expertise of the directors and management. A number of key
personnel are important to attaining the business goals of the Group. One or more of these key employees
could leave their employment, and this may adversely affect the ability of the Group to conduct its business
and, accordingly, affect the financial performance of the Group and its share price. Recruiting and retaining
qualified personnel is important to the Group’s success. The number of persons skilled in the exploration
and development of mining properties is limited and competition for such persons is strong.
RESOURCE AND RESERVE ESTIMATE RISK
Resource and reserve estimates are expressions of judgement based on knowledge, experience and
industry practice. These estimates were appropriate when made but may change significantly when new
information becomes available. There are risks associated with such estimates. Resource and reserve
estimates are necessarily imprecise and depend to some extent on interpretations, which may ultimately
prove to be inaccurate and require adjustment. Adjustments to resource and reserve estimates could affect
the Group’s future plans and ultimately its financial performance and value. Copper, silver and gold price
fluctuations, as well as increased production costs or reduced throughput and/or recovery rates, may render
resources containing relatively lower grades uneconomic and may materially adversely affect resource and
reserve estimations.
ENVIRONMENTAL RISK
The operations and activities of the Group are subject to the environmental laws and regulations of
Australia. As with most exploration projects and mining operations, the Group’s operations and activities
are expected to have an impact on the environment, particularly if advanced exploration or mine
development proceeds. The Group attempts to conduct its operations and activities to the highest standard
of environmental obligation, including compliance with all environmental laws and regulations. The Group
is unable to predict the effect of additional environmental laws and regulations which may come into effect
in the future, including whether any such laws or regulations would materially increase the Group’s cost of
doing business or affect its operations in any area. However, there can be no assurances that new
environmental laws, regulations or stricter enforcement policies, once implemented, will not oblige the
Group to incur significant expenses and undertake significant investments which could have a material
adverse effect on the Group’s business, financial condition and performance.
11
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
MATERIAL BUSINESS RISKS (CONTINUED)
AVAILABILITY OF EQUIPMENT AND CONTRACTORS
Appropriate equipment, including drill rigs, are in short supply. There is also high demand for skilled
contractors providing other services to the mining industry. Current economic conditions, global and
domestic, have only served to exacerbate these issues. Consequently, there is a risk that the Group may
not be able to source all the equipment and contractors required to fulfil its proposed activities. There is also
a risk that hired contractors may underperform or that equipment may malfunction, either of which may
affect the progress of the Group’s activities. The availability of equipment, material and contractors is also
a key consideration of the Company’s board of directors in relation to the timing of the final investment
decision.
FLUCTUATIONS IN COPPER PRICE AND AUSTRALIAN DOLLAR EXCHANGE RATE
The copper mining industry is competitive. There can be no assurance that copper, silver and gold prices
will be such that the Group can mine its deposits at a profit. Copper, silver and gold prices fluctuate due to
a variety of factors including supply and demand fundamentals, international economic and political trends,
expectations of inflation, currency exchange fluctuations, interest