Half Yearly Report and Accounts
Released
Released
Announcement PDF
KGL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
FINANCIAL STATEMENTS FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
CONTENTS
PAGE
DIRECTORS’ REPORT
1
AUDITOR’S INDEPENDENCE DECLARATION
18
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND
OTHER COMPREHENSIVE INCOME
19
CONDENSED CONSOLIDATED BALANCE SHEET
20
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
21
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
22
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
23
DIRECTORS’ DECLARATION
28
INDEPENDENT AUDITOR’S REVIEW REPORT
29
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
The directors of KGL Resources Limited present their report on the consolidated entity consisting of KGL
Resources Limited (KGL, Company) and the entities it controlled for the half-year ended 31 December
2024 (Group).
DIRECTORS
The names of the directors who held office during the half-year and up to the date of this report were:
DIRECTOR
POSITION HELD
Mr J. Gerard
Executive Chairman appointed 21 January 2025
Mr F. Purnamasidi
Non-executive director
Mr B. Gell
Independent non-executive director
PRINCIPAL ACTIVITY
The principal continuing activity of the Group during the half-year period was the exploration and
development of the Jervois Project (Project) in the Northern Territory.
REVIEW OF OPERATIONS
OVERVIEW
During the half-year to 31 December 2024, the Company continued to progress the Jervois Project
(Project) with the primary focus of the Company on completing major work programs to support delivery
of the Feasibility Study Update (FSU25). The results of FSU25 were announced subsequent to the halfyear end on 10th February 2025.
Major work programs progressed during the period included:
•
A successful resource drilling campaign to enhance mineral resource categorisation and to expand
the Group’s mine plans with a focus on the Reward and Rockface deposits.
•
Ongoing work on optimisation studies to improve key value drivers and financing options for the
Project.
Ongoing discussions and negotiations with key contractors and each level of government and the
local community to ensure we can deliver a cost competitive project, on time.
Progress on completing the Feasibility Study Update.
Preparation for the Independent Technical Review (ITR) of the Project.
•
•
•
DRILLING RESULTS
The goal of the 2024 drilling program was to increase confidence in the Resource Model, extend the project
life at Rockface, Reward Deeps and Marshall and support completion of the Feasibility Study Update.
The 2024 drilling program has been centred around five specific target areas:
•
•
•
•
•
Reward-Marshall Lode shallow to intermediate resource infill drilling.
Reward Main Lode shallow to intermediate resource infill drilling.
Reward Main underground and Reward Deeps resource infill drilling and depth extensions.
Rockface depth extensions.
Rockface shallow to intermediate resource infill drilling.
During the half-year, the company completed the drilling program to support the updated Mineral Resource
Estimate and mine plan for the Feasibility Study Update.
1
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
REWARD
The purpose of the infill drilling conducted within and around the intended Reward open pit was to increase
the confidence in the mineral resource estimate to deliver a more robust mine plan and mineral resource
to ore reserve conversion. Infill drilling for the Reward open pit was aimed at improving categorisation from
Indicated to Measured resource status as well as facilitating the conversion of inferred resources to
indicated categories. The findings from infill drilling at Reward are largely consistent with the current mineral
resource model and have been a key driver in the Group’s decision to review options for prioritising mining
of the Reward deposit and the potential to increase the size of the Reward open pit.
During the first half, KGL announced the results of the drilling program at Reward (ASX Announcement
dated 3rd July 2024) which included significant intersections of high-grade copper within the Upper Marshall
and Reward Main lodes within the planned open pit.
•
•
•
•
KJD628:
4.15 m @ 5.04% Cu, 129.06 g/t Ag, 0.41 g/t Au from 15.38 m
Including
1.82 m @ 8.16% Cu, 251.14 g/t Ag, 0.56 g/t Au
KJD625:
4.41 m @ 6.40% Cu, 74.79 g/t Ag, 0.33 g/t Au from 15.00 m
Including
1.32 m @ 11.06% Cu, 153.37 g/t Ag, 0.52 g/t Au
KJD629:
1.39 m @ 4.29% Cu, 19.05 g/t Ag, 2.93 g/t Au from 10.20 m
And
5.33 m @ 2.44% Cu, 17.10 g/t Ag, 0.71 g/t Au from 17.00 m
Including
1.79 m @ 5.05% Cu, 18.09 g/t Ag, 1.26 g/t Au
KJD631:
3.55 m @ 3.55% Cu, 36.79 g/t Ag, 0.49 g/t Au from 82.00 m
Including
0.75 m @ 7.30% Cu, 55.20 g/t Ag, 0.31 g/t Au
And
3.17 m @ 2.11% Cu, 21.77 g/t Ag, 0.61 g/t Au from 87.63 m
Including
0.76 m @ 5.79% Cu, 43.70 g/t Ag, 1.04 g/t Au
The five holes reported from Reward were targeted at the gaps in drilling where the 2024 mineral
resource estimate classified blocks as Indicated category at the edges of the Measured category zone in
the proposed open pit.
Drilling at the Reward Main underground and Reward Deeps lodes was focused on infill drilling with the
goal of upgrading the underground resource classification from Inferred to Indicated, and as part of an
effort to extend resources.
All 10 holes drilled at Reward Main underground intersected zones of mineralisation consistent with the
resource model. Additionally, their extension encountered further mineralisation in line with the Reward
East Lodes, significantly extending the Reward East mineralisation further south than previously modelled.
In the ASX Announcement dated 4th November 2024, assay results were announced at Reward Deeps
with holes KJD637 and KJD638 intersecting a wide zone of copper mineralisation at Reward Deeps South
lode, while hole KJD639 intersected a massive sulphide zone at Reward Deeps North lode:
1
2
•
KJD6371: 18.90 m @ 1.99% Cu2, 17.43 g/t Ag, 0.32 g/t Au from 527.00 m (Deeps South)
•
KJD638: 8.79m @ 2.57% Cu, 36.25 g/t Ag, 0.77 g/t Au from 506.00 m (Deeps South)
•
KJD639: 6.28m @ 4.05% Cu, 44.22 g/t Ag, 0.42 g/t Au from 570.55 (Deeps North)
All intervals in this report are estimated true thicknesses unless otherwise specified.
A cutoff grade of 0.8% copper applied to all intersections unless otherwise specified.
2
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
Figure 1. Long projection of Reward deposit showing locations of reported drill hole intersections. 2024 resource block model blocks shown coloured
by copper grade. Proposed reward open pit outline 2024. The DHEM conductor plates modelled at Marshall Deeps. Reward East Lodes have
been filtered out, which are parallel to Deeps upper part.
At Reward Main underground, strong copper intersections confirm the Reward Main Shoot’s extension at
depth, with holes KJD640, KJD640D1 and KJD640D2 intersecting a broad zone of copper mineralisation:
•
KJD640: 1.76 m @ 1.53% Cu, 7.02 g/t Ag, 0.12 g/t Au from 454.84 m (Main Shoot) and
•
3.17 m @ 2.17% Cu, 10.43 g/t Ag, 0.23 g/t Au from 477.00 m
•
KJD640D1: 6.33 m @ 0.89% Cu, 6.15 g/t Ag, 0.14 g/t Au from 362.70 m (Main Shoot)
•
KJD640D2: 8.21 m @ 1.68% Cu, 7.47 g/t Ag, 0.18 g/t Au from 443.00 m (Main Shoot)
3
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
Figure 2. Long projection of Reward deposit showing locations of reported drill hole intersections. 2024 resource block model blocks shown coloured
by copper grade. Proposed reward open pit outline 2024. The DHEM conductor plates modelled at Marshall Deeps. Reward East Lodes have been
filtered out, which are parallel to Deeps upper part.
ROCKFACE
During the first half, KGL announced strong high-grade copper and gold intersections at Rockface Deeps
(North Lode) below the 2022 resource model including some of the highest polymetallic grades achieved
at Jervois with a DHEM conductor modelled from the deepest hole at Rockface (KJCD575W1) confirming
the deposit is open at depth (ASX Announcements dated 5 July 2024, 29 July 2024 and 4 November 2024).
Holes KJD626 and KJD627 were targeted primarily at gaps in Rockface North Lode to increase geological
confidence and fill the gaps in the mineral resource model.
Hole KJD626 was targeted at the centre of North Lode and extended further through to Main Lode. A thick
zone of high-grade copper mineralisation was intersected at the North Lode position and three thin zones
of mineralisation corresponded to the Main Lode, separated by low grade (<1% Cu). Best results from the
hole were:
•
5.42 m @ 1.89% Cu, 17.27 g/t Ag, 0.27 g/t Au from 797.57 m (RF North) Including
0.72 m @ 3.72% Cu, 33.40 g/t Ag, 0.29 g/t Au
•
0.75 m @ 1.11% Cu, 8.90 g/t Ag, 0.14 g/t Au from 889.12 m (RF Main) and
•
0.64 m @ 3.46% Cu, 19.10 g/t Ag, 0.21 g/t Au from 891.60 m
•
0.75 m @ 1.95% Cu, 10.20 g/t Ag, 0.05 g/t Au from 894.00 m
Hole KJD627 was targeted at a gap in the western margin of North Lode, 64 m below Hole KJCD481D6,
and intersected a thin faulted sulphide vein, containing the copper mineral bornite (Cu5FeS4). Another
thin sulphide vein intersected in the footwall, containing copper mineral chalcopyrite (CuFeS2). The assay
results from the two intersections were:
•
1.42 m @ 19.87% Cu, 286.00 g/t Ag, 1.07 g/t Au from 919.27 m
•
0.99 m @ 1.39% Cu, 23.80 g/t Ag, 0.07 g/t Au from 927.5 m
4
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
Drill hole KJD627D1 was targeted at the midpoint between previous intersections (KJCD556 &
KJCD556D4) to confirm the lateral continuity of high-grade copper mineralisation below the bottom margin
of the Rockface north resource model. It intersected a massive sulphide-magnetite brecciated vein,
containing significant chalcopyrite, sphalerite and galena. The intersection is located to the north of the
current resource model.
The best assay results were:
•
5.08 m @ 6.74% Cu, 330.63 g/t Ag, 5.36 g/t Au, 18.41% Zn, 8.42% Pb From 1013.05 m (HW)
including 3.66m @ 8.72% Cu, 454.72 g/t Ag, 0.83 g/t Au, 25.06% Zn, 11.60% Pb
•
0.66 m @1.59% Cu, 11.90 g/t Ag, 0.09 g/t Au From 1020.37m (HW)
•
0.80 m @ 1.21% Cu, 6.50 g/t Ag, 0.08 g/t Au From1028.00 m (FW) and
•
0.80 m @ 1.02% Cu, 5.30 g/t Ag, 0.16 g/t Au From 1033.00 m
•
1.28 m @ 2.67% Cu, 13.04 g/t Ag, 0.40 g/t Au From 1043.53 m (Rockface Main Lode strike).
Infill drilling holes KJD227D1 & KJD227D2 intersected high-grade mineralisation at the center of Rockface
North Lodes:
•
KJD227D13:
4.16 m @ 2.17% Cu, 23.08 g/t Ag, 0.19 g/t Au from 711.82 m
•
KJD227D2:
4.14 m @ 6.14 % Cu, 48.26 g/t Ag, 0.48 g/t Au from 737.30 m
Drill hole KJD627D2, the final hole in the Rockface drilling program, intersected the Rockface North lodes
70 meters below the current resource model, encountering narrow zones of mineralisation. Although the
intersection was not substantial, it aligns with the orebody’s pinch-and-swell structure, and sulphide hosted
in brecciated magnetite and quartz veins, confirming the extension at greater depth. The intersection
confirmed the DHEM conductor indicating that the Rockface North Lodes remain open at depth.
•
KJD627D2:
0.75 m @ 1.17% Cu, 10.80 g/t Ag, 0.26g/t Au from 1086.02m and
1.36 m @ 1.86 % Cu, 7.12 g/t Ag, 0.29 g/t Au from 1096.29m.
3
All intervals in this report are estimated true thicknesses unless otherwise specified.
5
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
Figure 3. Long section through Rockface North Lodes (7490527.00 mN), copper grade >0.8%. 2024 resource block model blocks shown coloured by
copper grade. older drill hole traces shown in grey. Previously reported intersection shown in teal colour.
The successful drilling program at Rockface during 2024 resulted in a significant upgrade in the Rockface
resource model which was announced on 25 November 2024.
The completed 2024 drilling program comprised 75 holes for 23,037 meters across the Jervois Project. As
at the half year ended 31 December 2024, there were 35 holes which have been drilled but not announced.
MINERAL RESOURCE ESTIMATE INCREASE
On 25th November 2024, the Company updated the previous Mineral Resource Estimate (ASX Release
‘Increase in JORC Measured Resource for Jervois Update’, 23 May 2024) for the Reward, Bellbird and
Rockface open cut and underground resources, following the completion of the 2024 drilling program
(totalling 75 holes for 23,037 meters).
This MRE update resulted in an increase in the resource of 17.4%, from 23.37Mt to 27.45Mt, particularly
through an increase in underground tonnes, chiefly at Reward and Rockface. Indicated and Inferred
Resources increased by 2.18Mt and 1.89Mt respectively for the combined Rockface and Reward areas.
This was achieved via a combination of upgrading existing inferred resources to indicated resources,
additional inferred resources, and a change to the copper cutoff from 1.0% grade to 0.8% grade for the
potential underground areas. The cutoff grade was reviewed for these areas following a reassessment of
the financial inputs.
The contained copper has increased across the project by 8.7% from 472Kt to 513Kt. Silver and gold
contained metal has also increased to 22.4Moz (+14.7%) and 215Koz (+11.3%) respectively.
6
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
Jervois Mineral Resource - November 2024
Resource 12/11/2024
Material
Area
Reward
Open Cut
Potential > 0.5 % Cu
Bellbird
Underground
Potential > 0.8 % Cu
Bellbird
Rockface
Sub Total
Total
•
•
•
•
Metal
Copper
(%)
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Silver
(Moz)
2.57
1.95
48.2
0.43
50.0
4.0
35.4
1.02
1.39
37.4
0.23
14.3
1.2
7.6
0.61
0.95
10.7
0.08
5.8
0.2
1.5
1.23
2.53
15.1
0.14
31.2
0.6
5.6
Indicated
1.26
1.45
9.1
0.17
18.2
0.4
6.8
Inferred
Indicated
Inferred
1.02
7.72
6.22
4.71
1.24
1.71
1.87
1.35
10.6
27.2
38.4
18.6
0.12
0.25
0.38
0.17
12.7
132.1
116.0
63.6
0.3
6.7
7.67
2.82
4.0
60.9
75.5
25.5
Indicated
0.35
2.26
19.0
0.14
8.0
0.22
1.6
Inferred
3.20
1.95
12.1
0.10
62.4
1.24
10.4
Indicated
3.94
2.81
24.5
0.26
110.90
3.10
32.71
1.32
1.55
13.7
0.19
20.42
0.58
8.02
19.74
27.45
1.93
1.87
24.6
25.3
0.24
0.24
381.3
513.4
15.63
22.37
153.7
214.5
Category
Mt
Measured
Indicated
Inferred
Measured
Sub Total
Reward
Grade
Inferred
Gold
(koz)
Cut-off grades: 0.5% Cu grade above 200 mRL (approximately 150 m below the surface), and 0.80% Cu below 200 mRL.
Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
Inferred Resources have less geological confidence than Measured or Indicated Resources and should not have modifying factors applied
to them. It is reasonable to expect that with further exploration most of the Inferred Resources could be upgraded to Indicated Resources.
Mineral Resources are not Ore Reserves and do not have demonstrated economic viability.
Growth in scale and confidence level of Jervois Copper resource over time.
7
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
EXPLORATION PROGRAM
The results of the drilling program in 2024 were pleasing, confirming extensions to mineralisation at
Rockface and Reward and providing data to improve confidence in the open pit resource at Reward.
The 2024 exploration program activity targeted exploration in and around the Resource Model to extend
the project life at Rockface, Reward Deeps and Marshall and delivered a significant increase in tonnages
at depth and some of the highest polymetallic grades achieved at Jervois, which continues to support the
growth potential within the Jervois project area. A secondary and important goal was to increase the
knowledge and understanding of our geological model at depth, furthering the understanding of the Jervois
Project geology and mineralising systems.
The KGL exploration team have completed that 2024 exploration program ahead of schedule. Having
achieved its exploration objectives, KGL took the opportunity through to December to delineate additional,
near-surface resources that might be recoverable by open cut methods, targeting expansion of the planned
boxcut at Reward East and an area identified as Bellbird North (See Figure 4). The results of this additional
drilling will be available during early 2025.
Figure 4. Jervois Project Drilling Locations in 2024
8
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
The Jervois project is positioned along the crustal-scale Jervois Fault with a unique mineralisation style
blending SEDEX and IOCG characteristics. Exploration results to date demonstrate the rationale for
pursuing a systematic approach to unlocking this project's immense value. In this regard, Dr. Warwick
Crowe, a globally regarded structural geologist, was commissioned to provide a report on the exploration
potential at Jervois and to provide directions for future work as part of the exploration planning process. Dr
Crowe completed a site visit and field report, and on the basis of this report, a final exploration hole for 2024
was drilled at Crowes Nest.
An ongoing work program involving geophysics and gravity and magnetic inversion analysis will be
progressed in 2025 to confirm additional high potential near mine, brownfield and greenfield exploration
targets for future exploration, subject to meeting Project development priorities and the availability of
finance.
PROGRESSING PROJECT DEVELOPMENT ACTIVITIES
During the half-year, the Group continued to progress optimisation studies to improve key project value
drivers including productivity improvements that will support Project financing.
This ongoing process is geared towards refining the economic, technical, and environmental aspects of the
Project. The optimisation efforts are expected to yield an optimised Feasibility Study, providing a detailed,
comprehensive, refined and definitive assessment of the Project's viability and potential for long-term
success.
A key focus of improvements to the FS2022 included:
▪
Quantifying the impact of potentially expanding the open pit mine plan and increasing the size of
the mining equipment that results in higher and more efficient open pit mining rates. This will
effectively delay the capital development of the underground mines whilst, smoothing capital
expenditure and peak labour and accommodation requirements.
▪
Proposed process plant configuration enhancements which will also reduce the amount of labour
required on-site for construction and increases the annual processing rate.
▪
Improving confidence and categorisation of the reserves and growing the resource tonnages
available for open pit mining in the first 3-4 years and at depth.
At the end of the half year, the Feasibility Study Update has progressed with a number of study areas
including mine design (Open cut and Underground), scheduling and civil works reviewed and updated by
separate Tier 1 contractors whilst ongoing operating cost reviews are continuing.
Those areas included Open Cut mining plan, Tailings Storage Facility, airstrip, mine camp, power
generation and reticulation, water supply and reticulation, surface civil works, concentrator and
associated ancillary plant, equipment and buildings. However, given the positive results of the 2024 drilling
campaign and associated uplift to the resource estimate, which includes an additional 4.1Mt of underground
resource, an updated underground mining plan was now required. The scale of the additional underground
resource tonnes and its potential to have a significant impact on Project economic performance
necessitated such a rework.
RPM Advisory Services Pty Ltd was appointed to complete the Independent Technical Engineers (ITE)
Report that will support Project financing and have commenced the review.
The Company has also appointed Axiom Project Services to provide KGL with highly experienced project
delivery personnel to augment the existing Jervois Project team. Additional resourcing is being targeted
as project milestones are achieved.
KGL will continue to work with key contractors and each level of government and the local community to
ensure we can deliver a sustainable, cost competitive project, on time.
Once the Feasibility Study Update4 is completed, KGL will begin discussions with potential equity and debt
investors in relation to securing funding for the Project.
4
See Subsequent Events.
9
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
COPPER MARKET COMMENTARY
The medium to long term outlook for the Copper Market remains strong with industry analysts forecasting
growing supply deficits which are predicted to widen over the next decade as a result of expectations for
an acceleration of demand from the clean energy transition and electrification of the global economy
combined with supply challenges due to a lack of new discoveries, falling grades at existing mines 6 and
new mine approvals continuing to be challenging and slow hampering any meaningful supply response.
BHP expects the world to consume an extra 1 million metric tons of copper per year on average until 2035
due to the adoption of copper-intensive technologies, double the annual volume growth in the past 15 years.
To meet this rising demand, BHP estimates that approximately 10 million metric tons of new mined copper
supply will be required over the next decade.7
Copper remains critical to fields ranging from construction to electronics, and demand is growing as
increasing demand for electricity, the upgrading and expansion of power grids, and technological
advancements such as artificial intelligence (AI) are underway. The transition to clean, low-carbon energy
accounts for 26% of copper demand, a figure projected to soar to 57% by 2040.
Source: Bloomberg NEF Transition Metals Outlook 2023
The copper market is forecast to move into a growing deficit through this decade, and to grow quickly to
expand to a large deficit of 21 million tonnes per year by 2050. Illustrating this, the orange line in the chart
above represents supply, and the shaded area represents demand (and its constituents by use type).
The Company is well-positioned to deliver its high-grade Jervois Project into a copper market at a time of
projected chronic supply shortfall and into a market requiring a higher incentive price to incentivise new
production. Commentary from industry participants has called for US$6-$8/lb copper as the minimum
price range to incentive material investment into new copper projects.5
Elevated copper M&A activity continued through to year end with Sumitomo Metal Mining acquiring a
30% stake in Rio Tinto’s Winu copper project. Appian Capital advisory also made an unsuccessful bid for
Cyprium Metals, owner of the Nifty copper project. Press has emerged regarding Rio Tinto being in early
discussions to acquire Glencore, partly motivated by increasing its exposure to copper through its stake in
the Collahuasi mine in Chile.
5
Nicole Adshead-Bell, Chair, Director Cupel Advisory Corp.
BHP reports that the average grade of copper mines has decreased by approximately 40% since 1991.
7
BHP Insights: how copper will shape our future, 30 September 2024
6
10
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
CHANGES TO THE SENIOR MANAGEMENT TEAM
Subsequent to the end of the year, Mr Philip Condon tendered his resignation as Chief Executive Offer to
pursue other opportunities and KGL and Mr Condon agreed that Mr Condon’s employment would end on
21 January 2025.
As an interim measure, the Chairman, Mr Jeff Gerard, will assume the executive functions, becoming
Executive Chairman, whilst a search for a dedicated CEO is underway.
The Board has resumed its executive search for a CEO.
FEDERAL GOVERNMENT: COPPER IS A STRATEGIC MINERAL
Copper is currently facing additional challenges due to the threat of tariffs and ongoing global trade
tensions, which are contributing to supply chain disruptions and increased market volatility. 8
Governments are increasingly recognising that dependence on foreign sources of critical materials creates
a strategic vulnerability for their economy and military in the face of adverse foreign government actions,
natural disasters, and other events that could disrupt supplies.
With chronic shortfalls in copper forecast over the next decade and challenges in SUPPLY from the traditional
low-cost markets of Chile and Peru, Australia has the opportunity to grow its critical minerals wealth and
become an important player in developing secure, reliable and sustainable global supply chains for copper
that are internationally competitive.
Many states in Australia, including the Northern Territory, have recognised copper as a critical mineral. In
December 2023, the Australian federal government announced that copper is to be included on the newly
created Strategic Materials List.
FINANCIAL REVIEW
For the six-month period ended 31 December 2024:
▪ The Group recorded a loss after taxation of $1,343,565 (31 December 2023: loss of $1,097,841),
▪ $7,483,076 (31 December 2023: $7,572,292) was capitalised to exploration and evaluation assets; and
The Group cash reserve as at 31 December 2024 was $5,212,176.
MATERIAL BUSINESS RISKS
The Group’s exploration and mining operations will be subject to the normal risks of mining and any
revenues will be subject to numerous factors beyond the Group’s control. The material business risks that
may affect the Group are summarised below.
FUTURE CAPITAL RAISINGS
The Group’s ongoing activities are expected to require substantial further financing, in addition to amounts
raised pursuant to the entitlement offer completed in August 2024. The Group will require additional funding
to bring the Jervois Project into commercial production. Any additional equity financing may be dilutive to
shareholders and may be undertaken at lower prices than the current market price, and debt financing, if
available, may involve restrictive covenants which limit the Group’s operations and business strategy.
Although the directors believe that additional capital can be obtained, no assurances can be made that
appropriate capital or funding will, if and when needed, be available on terms favourable to the Company
or at all. If the Company is unable to obtain additional financing as needed, it may be required to reduce,
delay or suspend its operations and this could have a material adverse effect on the Group’s activities and
could affect the Group’s ability to continue as a going concern.
“The price of copper in the United States rocketed on Monday after U.S. President Donald Trump pushed forward his plans to slap
tariffs on industrial metals. Last week Trump said he also planned to impose tariffs on copper, without giving details.” (Reuters: US
copper price premium soars to record after Trump tariff moves, 11 February 2025)
8
11
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
MATERIAL BUSINESS RISKS (CONTINUED)
EXPLORATION RISK
The success of the Group depends on the delineation of economically mineable reserves and resources,
access to required development capital, movement in the price of commodities, securing and maintaining
title to the Group’s exploration and mining tenements and obtaining all consents and approvals necessary
for the conduct of its exploration activities. Exploration on the Group’s existing tenements may be
unsuccessful, resulting in a reduction in the value of those tenements, diminution in the cash reserves of
the Group and possible relinquishment of the tenements. The exploration costs of the Group are based on
certain assumptions with respect to the method and timing of exploration. By their nature, these estimates
and assumptions are subject to significant uncertainties and, accordingly, the actual costs may materially
differ from these estimates and assumptions.
Accordingly, no assurance can be given that the cost estimates and the underlying assumptions will be
realised in practice, which may materially and adversely affect the Group’s viability. If the level of operating
expenditure required is higher than expected, the financial position of the Group may be adversely affected.
The Group may also experience unexpected shortages or increases in the costs of consumables, spare
parts, plant and equipment.
FEASIBILITY AND DEVELOPMENT RISKS
It may not always be possible for the Group to exploit successful discoveries which may be made in areas
in which the Group has an interest. Such exploitation would involve obtaining the necessary licences or
clearances from relevant authorities that may require conditions to be satisfied and/or the exercise of
discretions by such authorities. It may or may not be possible for such conditions to be satisfied. The Group
continues to assess the economic viability of a potential mine through completion of final investment
decision (FID) works, including contract negotiations being undertaken aimed at reducing development risks
for the Jervois Project. There is a risk, even if satisfactory contractual arrangements are put in place, the
Jervois Project may not be successfully developed for commercial and/or financial reasons.
REGULATORY RISK
The Group’s operations are subject to various Commonwealth, State and local laws and plans, including
those relating to mining, prospecting, development permit and licence requirements, industrial relations,
environment, land use, royalties, water, native title and cultural he
Share your feedback