Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
Quarterly Activities Report
Period Ended 30 June 2024
c
31 July 2024
Updated Mineral Resource Estimate (MRE)
•
An update of the MRE at Reward open cut and underground resources has improved confidence in the
Resource which now includes a contained copper resource in the measured category.
•
The updated Reward resource, combined with the Bellbird resource, gives JORC Measured Resource
within two planned open pits at Jervois Project: 67% Measured; 32% Indicated; 1% Inferred.
Exploration Program and Drilling Results
•
The 2024 drilling program is focused on increasing confidence in the resource, resource extensions
and an increase in mine life which can add materially to the value of the Project.
•
At Rockface Deeps, high-grade copper intersections increased confidence in the mineral resource
model. Rockface has not been closed off at depth by drilling and DHEM geophysics carried out on the
deep holes indicates that conductive mineralisation continues substantially below the level of current
drilling.
•
At Reward, significant intersections of high-grade copper were confirmed in the upper Marshall and
Reward Main lodes within the planned open pit.
•
Exploration at Depth: Re-modelling of gravity and magnetic data is currently underway to further define
large anomalies beneath known mineralisation. A drill program will be designed to test the large
geophysical anomaly at the southern end of the Jervois mineralised field with the goal of improving
understanding of the source of the high-grade mineralising fluids at Rockface.
Feasibility Study Update
•
An update of the Feasibility Study, issued in November 2022, is expected to be released end Q3,
beginning Q4 2024.
•
Technology selection and design of the Processing Plant is complete resulting in a nominal capacity of
2Mtpa, a 25% increase from the previous feasibility.
•
Open Cut and Underground mine pit and stope design is finalised. Scheduling and Reserve update
underway.
•
Civil works and Tailings Storage Facility redesign and costing is progressing. An update to the ancillary
infrastructure, including power supply, camp and airstrip, also underway.
Corporate
•
Appointment of experienced mining executive Philip Condon as CEO, effective 29/7/24, after serving as
GM Projects with responsibility for completing the Feasibility Study for an interim period.
•
Current cash & cash equivalent as at 30 June 2024 was $6.48 million.
•
A non-renounceable pro-rata Entitlement Offer to raise approximately up to $15.1 million was announced
on 8 July 2024. The Offer will close on 31 July 2024.
KGL Resources Limited | Quarterly Activities Report
Page 1 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
Updated Reward MRE / Increase in JORC Measured Resource
During the quarter, KGL announced an update to the Reward Mineral Resource Estimate (MRE):
•
13.16 Mt at 1.79% Cu, 34 g/t Ag and 0.33 g/t Au for 234.9 Kt of copper metal and 14.5 Moz of silver and
139.9 Koz of gold.
•
Includes maiden measured resource of 2.63Mt at 1.91% Cu, 46.2g/t Ag and 0.43g/t Au for 50.3kt of Cu
metal, 3.91Moz Ag and 36koz Au
While the total MRE at Reward remains about the same as the 2022 MRE, the focus of the drilling program in
2023 was primarily to increase confidence in the resource within the proposed open pit design to support the
increase in design processing nominal capacity to 2 Mtpa. The Measured Resource at Reward and Bellbird now
represents approximately 67% of the total MRE within the proposed open pit designs.
Recent infill drilling within the planned Reward open pit design also confirmed shallow intersections of high-grade
copper and silver as well as deeper intersections with thick zones of strong copper with higher grade cores
supporting a positive impact on the Project’s economics.
Exploration Program and Drilling Results
Growing the high-grade copper resource and mine life at Jervois continues to be a key value driver for KGL.
Rockface
Rockface remains open for further drilling at depth, with the deepest hole at Rockface intercepting strong copper
and gold grades.
The results of KGL’s drilling program at Rockface during the quarter (ASX Announcements dated 6/6/24 and
5/07/24) included strong high grade copper intersections at Rockface Deeps (North Lode).
Hole KJCD208D1 targeted a gap in the center of the Rockface North Lode to increase confidence in the mineral
resource model (Figure 1). A zone of strong mineralisation was intersected at the Rockface North Lode and
extension to the Rockface Main Lode.
•
2 m @ 7.37% Cu, 41.12 g/t Ag, 0.38 g/t Au from 617.16 m (RF North) and
•
7.44 m @ 7.49% Cu, 36.19 g/t Ag, 0.89 g/t Au from 708.75m (RF Main) including
0.73 m @ 10.83% Cu, 33.80 g/t Ag, 0.43 g/t Au from 709.77 m, and including
0.86 m @ 10.94% Cu, 51.00 g/t Ag, 0.64 g/t Au from 713.30 m and including
0.47 m @ 18.91% Cu, 56.60 g/t Ag, 0.20 g/t Au from 716.50 m
Hole KJD626 was targeted at the centre of North Lode and extended further through to Main Lode. A thick zone
of high-grade copper mineralisation was intersected at the North Lode position and three thin zones of
mineralisation corresponded to the Main Lode, separated by low grade (<1% Cu). (Figure 2). Best result from
the hole were:
•
5.42 m @ 1.89% Cu, 17.27 g/t Ag, 0.27 g/t Au from 797.57 m (RF North) Including
0.72 m @ 3.72% Cu, 33.40 g/t Ag, 0.29 g/t Au
•
0.75 m @ 1.11% Cu, 8.90 g/t Ag, 0.14 g/t Au from 889.12 m (RF Main) and
•
0.64 m @ 3.46% Cu, 19.10 g/t Ag, 0.21 g/t Au from 891.60 m
•
0.75 m @ 1.95% Cu, 10.20 g/t Ag, 0.05 g/t Au from 894.00 m
KGL Resources Limited | Quarterly Activities Report
Page 2 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
Figure 1. Rockface north-south cross section looking west through KJDCD208D1 and KJDCD208D2 hole trace. 2022
resource block model blocks >1% Cu coloured by copper grade; older drill hole traces shown in grey
KGL Resources Limited | Quarterly Activities Report
Page 3 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
Figure 2. Rockface cross section through 628340 mE looking west with reported hole KJD626 trace. 2022 resource model
coper grade (>1% Cu). Previous drill hole traces grey with colours showing assays >1% Cu. DHEM modelled from hole
KJCD575W1.
KGL Resources Limited | Quarterly Activities Report
Page 4 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
KGL previously announced the Project’s highest-grade intersection of copper in the Western margin of the Rockface
north Lode in drillhole KJCD481D6 (14/02/2022), which intersected a zone of high-grade copper mineralisation
including a hanging wall bornite-rich massive sulphide zone (0.84m) and a footwall chalcopyrite-rich massive
sulphide zone (1.90m). (Figure 3):
•
KJCD481D3 (14/02/2022): 4.45m @ 18.88% Cu, 396.8 g/t Ag, 0.42 g/t Au from 725.35m
Including: 1.51m @ 37.41% Cu, 1,105.5 g/t Ag, 0.59 g/t Au from 725.35m
And incl.: 1.16m @ 21.98% Cu, 73.1 g/t Ag, 0.41 g/t Au from 728.06m
•
KJCD481D6 (14/02/2022): 4.00m @ 19.80% Cu, 298.6 g/t Ag, 1.10 g/t Au from 698.88m
Including: 0.74m @ 61.4% Cu, 521.0 g/t Ag, 0.11 g/t Au from 698.88m
•
KJCD481D7 (14/02/2022): 2.17m @ 12.81% Cu, 218.4 g/t Ag, 0.71 g/t Au from 692.00m
Including: 1.24m @ 21.49% Cu, 374.1 g/t Ag, 1.20 g/t Au from 692.97m
Hole KJD627 was targeted at a gap in the western margin of Rockface North Lode (Figure 3), 64 m below Hole
KJCD481D6, and intersected a thin faulted sulphide vein, containing the copper mineral bornite (Cu5FeS4).
Another thin sulphide vein intersected in the footwall, contained copper mineral chalcopyrite (CuFeS2). The assay
results from the two intersections were:
• 1.42 m @ 19.87% Cu, 286.00 g/t Ag, 1.07 g/t Au from 919.27 m
•
0.99 m @ 1.39% Cu, 23.80 g/t Ag, 0.07 g/t Au from 927.5 m
Figure 3. Rockface cross section through 628246 mE looking west with reported hole KJD627 trace. 2022 resource model
coper grade (>1% Cu). Previous drill hole traces grey with colours showing assays >1% Cu. DHEM modelled from hole
KJCD575W1.
KGL Resources Limited | Quarterly Activities Report
Page 5 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
The DHEM conductor modelled from the previously deepest hole at Rockface (KJCD575W1) exhibits continuity of
mineralisation below the current resource model (Figure 4). KJCD575W1 intersected strong copper with gold credits
in:
• 5.0m @ 2.43% Cu, 18.1 g/t Ag, 0.55 g/t Au from 1,132.5m including
•
2.1m
@ 3.53% Cu, 21.5 g/t Ag, 1.01 g/t Au from 1,134.54m
Additionally, a couple of deep holes intersected mineralisation of economic significance below the current resource
model in 2023 (KJCD556 & 556D4).
Robust copper results were previously reported in Rockface drillhole KJCD556:
•
12.38m @ 2.60% Cu, 23.8 g/t Ag, 0.34 g/t Au from 978.26m
•
8.74m @ 3.20% Cu, 29.7 g/t Ag, 0.42 g/t Au from 978.26m including
•
5.75m @ 3.86% Cu, 34.4 g/t Ag, 0.51 g/t Au from 978.26m including
•
`4.70m @ 4.26% Cu, 35.3 g/t Ag, 0.59 g/t Au from 979.41m
High-grade copper-zinc-lead-silver massive sulphides was also previously announced in deep Rockface drillhole
KJCD556D4:
•
4.1 m @ 3.59% Cu, 20.49% Zn, 4.32% Pb, 199.9 g/t Ag, 0.65 g/t Au from 990.0 m
Drill hole KJD627D1 was targeted at the midpoint between previous intersections (KJCD556 & KJCD556D4) to
confirm the lateral continuity of high-grade copper mineralisation below the bottom margin of Rockface north
resource model. It intersected a massive sulphide-magnetite brecciated vein, containing significant chalcopyrite,
sphalerite and galena (Figure 4). The intersection is located to the north of the current resource model.
The best assay results were:
•
5.08 m @ 6.74% Cu, 330.63 g/t Ag, 5.36 g/t Au, 18.41% Zn, 8.42% Pb From 1013.05 m (HW)
including
3.66m @ 8.72% Cu, 454.72 g/t Ag, 0.83 g/t Au, 25.06% Zn, 11.60% Pb
•
0.66 m @1.59% Cu, 11.90 g/t Ag, 0.09 g/t Au From 1020.37m (HW)
•
0.80 m @ 1.21% Cu, 6.50 g/t Ag, 0.08 g/t Au From1028.00 m (FW) and
•
0.80 m @ 1.02% Cu, 5.30 g/t Ag, 0.16 g/t Au From 1033.00 m
•
1.28 m @ 2.67% Cu, 13.04 g/t Ag, 0.40 g/t Au From 1043.53 m (Rockface Main Lode strike).
Massive sulphide zones have previously been identified at Jervois as higher-grade domains in which the primary
copper mineralisation has been remobilised by later structural reworking. The new intersection (KJD627D1),
together with KJCD556D4, opens the potential for a new high-grade domain at the bottom of current resource,
subject to further infill drilling, with the possibility of increasing tonnages and mine life.
The newly drilled deepest hole (KJD627D2) was completed 40 metres below KJCD575W1 to validate the DHEM
conductor model and extend the resource further down-dip. Assay results for hole KJD627D2 are pending and will
be reported when received.
KGL Resources Limited | Quarterly Activities Report
Page 6 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
Figure 4. Long projection of Rockface north lodes showing locations of reported drill hole intersections. 2022 resource block
model blocks >1% Cu shown coloured by copper grade, older drilling lode intersections shown by copper grade >1%. locations
of holes drilled waiting on assay results. Location of previously announced holes. All intersections quoted are estimated true
thickness (ETT). The DHEM conductor plates modelled from deepest hole (KJCD575W1) at Rockface.
KGL Resources Limited | Quarterly Activities Report
Page 7 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
Reward
The results of KGL’s drilling program at Reward during the quarter (ASX Announcement 3/07/24) included
significant intersections of high-grade copper within the upper Marshall and Reward Main Lodes.
•
KJD628:
Including
4.15 m @ 5.04% Cu, 129.06 g/t Ag, 0.41 g/t Au from 15.38 m
1.82 m @ 8.16% Cu, 251.14 g/t Ag, 0.56 g/t Au
•
KJD625:
Including
4.41 m @ 6.40% Cu, 74.79 g/t Ag, 0.33 g/t Au from 15.00 m
1.32 m @ 11.06% Cu, 153.37 g/t Ag, 0.52 g/t Au
•
KJD629:
And
Including
1.39 m @ 4.29% Cu, 19.05 g/t Ag, 2.93 g/t Au from 10.20 m
5.33 m @ 2.44% Cu, 17.10 g/t Ag, 0.71 g/t Au from 17.00 m
1.79 m @ 5.05% Cu, 18.09 g/t Ag, 1.26 g/t Au
•
KJD631:
including
And
Including
3.55 m @ 3.55% Cu, 36.79 g/t Ag, 0.49 g/t Au from 82.00 m
0.75 m @ 7.30% Cu, 55.20 g/t Ag, 0.31 g/t Au
3.17 m @ 2.11% Cu, 21.77 g/t Ag, 0.61 g/t Au from 87.63 m
0.76 m @ 5.79% Cu, 43.70 g/t Ag, 1.04 g/t Au
The five holes reported from Reward were targeted at the gaps in drilling where the 2024 mineral resource
estimate classified blocks as Indicated category at the edges of the Measured category zone in the proposed
open pit.
Figure 5. Long projection looking west of Reward deposit with reported drill hole intersections and 2024 resource model blocks
coloured by confidence category (red= measured, yellow = indicated, blue = inferred). Previous drill hole traces in grey colour.
KGL Resources Limited | Quarterly Activities Report
Page 8 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
2024 Drilling program
The priorities for the remainder of the exploration program include:
•
Infill drilling at Reward underground area to upgrade the Resource from inferred to indicated status
•
Targeted Resource Extensions:
o Rockface shallow to intermediate depths
o Rockface Deeps extension
o Reward Deeps extension
Rockface remains open for further drilling at depth, with the deepest holes at Rockface intercepting strong copper
and gold grades. The results of drill holes KJD627D1 and KJCD556D4 highlight a potential new high-grade
domain at Rockface Deeps, subject to infill drilling. Near term targets, including shallow to intermediate depths
and Rockface depth extensions, continue to be worked up based on drilling results and geophysics with a focus
on expanding the resource and extending the mine life of this high-grade deposit.
The Reward deposit also remains open at depth. Near term targets include infill drilling within the Reward
underground area and Reward Deeps extensions.
The distinctive J-shape of the outcropping mineralised system has a strike length of some 12 km.
The Jervois and Unca Creek deposits remain under-explored and highly prospective for high grade copper, gold
and silver.
Exploration at Depth
Three coincident magnetic and gravity anomalies have been detected at depth: two at Reward and a large anomaly
under the southern end of the J structure near Rockface which shows clear similarities with the Rockface deposit
both in geophysical signature, structural similarities and surface geology/mineralisation occurrence.
The objective is to explore for a large mineralised system beneath the copper-silver-gold system at the southern
end of the Jervois mineralised field, that could be a potential feeder for the Rockface deposit. One deep hole drilled
in 2023/24 provided geological and petrophysical data to 2kms.
In the second half of 2024, an inversion analysis will be completed using detailed gravity and magnetic surveys
combined with current drillhole data to develop targets to test this large geophysical anomaly with the goal of
improving our understanding of the source of the high-grade mineralising fluids at Rockface. A drill program to test
the targets is subject to the development of the targets and funding.
Feasibility Study Update
The Feasibility Study update is scheduled for release at the end of Q3/ beginning of Q4 2024. The Update has
been focused on 4 main areas
•
Open Cut and Underground mine design and schedules
•
Process Plant technology and capacity
•
Civil works including tailings storage
•
Ancillary Infrastructure.
The updated Reward Resource has now been incorporated in to the mine plan and optimisations of the open cut
and underground designs are being completed. Scheduling of the open cut and underground is underway and the
mining cost estimate is being recast with updated macro-economic and commercial inputs. Ventilation and water
management infrastructure will be completed ahead o fa revised Reserve estimate.
The process plant configuration enhancements have increased the annual processing rate nominally from 1.6
Mtpa to 2.0 Mtpa and the majority of the Front-End Engineering Design (FEED) work associated with this is now
KGL Resources Limited | Quarterly Activities Report
Page 9 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
complete. The plant will utilise a conventional crushing, SAG and ball mill comminution circuit and energy efficient
Jameson Cell technology in the flotation circuit.
Selected civil works are being re-tendered on the basis of the use of larger, mine scale equipment, taking
advantage of mining equipment on site at the time with the aim of reducing construction time and costs.
Designs for ancillary infrastructure, including the power station, air strip and camp are being updated and retendered to incorporate changes in demand from processing and mining modifications.
Once an updated Feasibility Study is completed, KGL intends to complete an Independent Technical Review (ITR)
to be in a position to reach final investment decision and progress financing for the project, to commence
operations in 2027, at a time of long-term chronic copper shortfall.
Corporate
Current cash & cash equivalent as at 30 June 2024 was $6.48 million.
During the quarter, KGL announced the appointment of senior mining executive, Mr. Philip Condon, as Chief
Executive Officer. Mr Condon has extensive experience in the industry spanning more than 35 years across a
wide range of commodities and countries. Specifically, Phil has a deep knowledge of the copper industry having
worked at the CSA Cobar mine, Freeport’s Grasberg copper mine in West Papua and Mawarid Mining company’s
copper project in Oman where he led completion of construction, commissioning of concentrator, production ramp
up, consolidation of overall operations, the exploration program and the 50% mill capacity upgrade project.
Additionally, the Board is seeking another non-executive director, which, along with Phil’s appointment, will
underpin and strengthen delivery of the Company’s future plans.
Copper Market Commentary
Despite recent weakness in the copper market, the long-term outlook for copper remains strong with forecast
supply deficits likely to grow.
As the clean energy transition accelerates, copper will continue to be in strong demand. Most nations have
committed to Net-Zero Emissions targets. CO2 emissions need to fall by about 45% from 2010 levels by 2030 to
reach net zero by 2050 requiring significant investments in renewables, grid upgrades and electric vehicles.
New technologies will also drive demand. Major Tech Companies are expected to invest $1 trillion in data centres
over the next 5 years. AI data centre racks could require 7x more power than traditional data centre racks.
Cumulative new copper demand is forecasted at 5 MT from data centres, equivalent to 3% of 2030 forecasted
global demand. 1
BHP’s recent foiled A$75 billion plan to take over mining rival Anglo American, as well as copper spiking to an alltime high above $11,000 per tonne earlier this year, has shone a spotlight on the predicted shortages of copper
later this decade.
Although demand for renewables, grid upgrades and electric cars continue to rise, new mines are becoming ever
harder to build.
1 https://sprottetfs.com/media/6112/setm-investor-presentation.pdf
KGL Resources Limited | Quarterly Activities Report
Page 10 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
Figure 6 Sprott: Copper – A central role in electricity transmission and EV’s. (31 March 2024)
Executives point to a cocktail of factors blocking construction of large projects, including deteriorating geology,
lengthening permitting times, and surging costs as a result of inflation and sustainability considerations.
This is resulting in an increase in the capital intensity of development projects - It is becoming increasingly
expensive to build new copper mines.
“It’s just getting harder and harder,” said Tristan Pascall, chief executive of First Quantum, which had its vast mine
in Panama shut down by the government after protests. “There’s no easy jurisdiction now. 2
KGL:’s strategy is to deliver its high-grade Copper-Silver-Gold Jervois project into a copper market at a time of
chronic supply shortfall. The project has all major approvals in place and, following completion of the Feasibility
Study Update and independent technical review, has the goal of first production in 2027.
This announcement has been approved by the board of KGL Resources Limited.
2
The Financial Times (21/07/24). Copper miners predict industry overhaul as end users rush to secure supply, by Harry Dempsey and Rachel
Millard.
KGL Resources Limited | Quarterly Activities Report
Page 11 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
c
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
Jervois Project, Northern Territory
100%
ML 30182
Jervois Project, Northern Territory
100%
ML 30829
Jervois Project, Northern Territory
100%
EL 25429
Jervois Project, Northern Territory
100%
EL 30242
Mt Cornish, Northern Territory
100%
EL 28340
Yambah, Northern Territory
100%
EL 28271
Yambah, Northern Territory
100%
EL 28082
Unca Creek, Northern Territory
100%
ML 32277
Lucy Creek Borefield, Northern Territory
100%
Mining Tenements Acquired/Granted and
Disposed during the quarter*
Location
Beneficial Holding
Location
Beneficial Holding
Location
Beneficial Holding
Nil
Tenements subject to farm-in or farm-out
agreements
Nil
Tenements subject to farm-in or farm-out
agreements acquired or disposed of during the
quarter
Nil
Related Party Payments
As reported in the quarterly cash flow report part 6.1, amounts paid to related parties of $39k
consist of directors’ fees and expenses for the quarter.
KGL Resources Limited | Quarterly Activities Report
Page 12 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
c
Forward Looking statements
•
•
This presentation includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”, “project”,
“opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward looking statements. All
statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast cash
flows and potential mineralisation, resources and reserves, exploration results and future expansion plans and development
objectives of KGL are forward-looking statements that involve various risks and uncertainties. Although every effort has been made
to verify such forward-looking statements, there can be no assurance that such statements will prove to be accurate and actual
results and future events could differ materially from those anticipated in such statements. You should therefore not place undue
reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements. Statements
in relation to future matters can only be made where the Company has a reasonable basis for making those statements.
Competent Person Statement
The Reward Resource information was first released to the market on 23/05/2024 and complies with JORC 2012.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
The following drill holes were originally reported under the JORC code 2012 on the date indicated in the table. The
Company confirms it is not aware of any new information or data that materially affects the information included in
the original market announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed.
Hole
Date originally Reported
KJCD208D1
KJCD575W1
KJCD556
KJCD556D4
06/06/2024
08/11/2023
27/09/2022
08/11/2023
11/10/2021
14/02/2021
10/11/2021
14/02/2021
08/12/2021
14/02/2022
5 July 2024
29/07/2024
03/07/2024
03/07/2024
03/07/2024
03/07/2024
03/07/2024
KJCD481D3
KJCD481D6
KJCD481D7
KJD627
KJD627D1
KJD628
KJD625
KJD629
KJD630
KJD631
KGL Resources Limited | Quarterly Activities Report
JORC Reported
Under
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
Page 13 of 14
ASX Announcement
Quarterly Activities Report
Period Ended 30 June 2024
c
KGL Resources Limited | Quarterly Activities Report
Page 14 of 14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
KGL Resources Limited
ABN
Quarter ended (“current quarter”)
52 082 658 080
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers – GST receipts
1.2
Payments for
Year to date
(12 months)
$A’000
366
1,329
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(340)
(1,418)
(e) administration and corporate costs
(457)
(2,737)
-
-
102
638
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Other
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(329)
(2,188)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(97)
(250)
(4,076)
(13,499)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – payment of security deposits
-
-
2.6
Net cash from / (used in) investing
activities
(4,173)
(13,749)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(58)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings – lease
payments
(45)
(175)
3.7
Transaction costs related to loans and
borrowings – lease interest
(2)
(14)
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(47)
(247)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
11,028
22,663
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(329)
(2,188)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(4,173)
(13,749)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(47)
(247)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
6,479
6,479
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,329
4,878
5.2
Call deposits
4,150
6,150
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6,479
11,028
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
39
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
0
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facili
Share your feedback