Annual Report to shareholders
Released
Released
Announcement PDF
30 June 2024 \ ANNUAL REPORT
Contents
1
Corporate Directory
2
Message from the Chairman
4
Operations Review
6
Reserves and Resources Table
7
Tenement Map and Holdings
9
Sustainability
10
Corporate Governance Statement
19
Financial Report
90
Additional Information
Corporate Directory
Name of Company Secretary
Kylie Anderson
Address of Registered Office
KGL Resources Limited
Level 5, 167 Eagle Street
Brisbane QLD 4000
07 3071 9003
Name and Address of Share Registry
Link Market Services Limited
Tower 4, 727 Collins Street
Melbourne VIC 3008
Securities Exchange Listing
Quotation has been granted for the unrestricted ordinary
shares of the Company on all Member Exchanges of the
Australian Securities Exchange
Page 1
| KGL Resources Annual Report 2024
Message from the Chairman
Dear Shareholders
During the financial year ended 30 June 2024, KGL Resources Limited (KGL) continued to advance the
high-grade Jervois Project in the midst of market expectations for stronger copper demand growth with the
market price reaching its highest recorded price of US$5.20 per pound this year. The Jervois Project is a
high-grade polymetallic project in Australia with substantial silver and gold by-products adding to its financial
attractiveness. It is an important strategic mineral project in the Northern Territory that will create a regional
mineral processing hub in the eastern Arunta region and once developed, will be a catalyst for economic
development and job creation in the region.
Drilling over the past 12 months has successfully increased confidence in the Jervois Project’s copper
resource within the planned open cut mining areas now predominantly within the Mineral Resource Measured
status. The Project total resource stands at 23.37 million tonnes at 2.02% copper containing 26.0 g/t silver and
0.2g/t gold.
KGL continues to explore and target near-mine extensions along strike and at depth for Reward and Rockface
in addition to near surface targets, that hold the potential to add substantial value for shareholders. The
Jervois and Unca Creek deposits remain under-explored and possess significant potential for more highgrade copper, gold, and silver, as evidenced by recent successful drilling at Rockface Deeps, which yielded
some of the highest grades of polymetallic mineralisation ever encountered at Jervois.
Since the completion of the feasibility study in November 2022, which affirmed the technical soundness and
financial viability of the Project, KGL has been actively enhancing the key project value drivers, including
productivity improvements to offset recent hyperinflation and reducing construction and operating risks. The
initiatives have included increasing the proportion of open-cut mined ore, revising underground mine designs
for cost efficiency, and increasing the processing capacity by 25% to enable higher production rate/cashflow
in the earlier years. These activities, together with the improvement in the resource definition and confidence,
are aimed at delivering a project with lower operational and financial risk.
Independent analysts continue to forecast growing copper supply deficits that are predicted to widen over
the next decade due to the lack of new discoveries, falling grades at existing mines and new mine approvals
continuing to be challenging and slow. These deficits are forecast as a result of a structural increase in
demand driven by the Government sanctioned clean energy transition globally, electric vehicle production,
electrification, and AI / data centres, in addition to strong traditional demand growth from rapid urbanisation
in developing economies, particularly India and South East Asia. We have already seen an increase in copper,
silver, and gold commodity prices since November 2022.
KGL is well-positioned, with all necessary approvals, to deliver its high-grade Jervois Project into a copper
market at a time of a projected chronic supply shortfall bringing opportunities for jobs and economic
development to the Northern Territory.
The primary focus of the KGL team will be moving the project forward into development through finalisation
of mining, plant and infrastructure contracts, and an off-take agreement to manage delivery and operational
risks, as well as developing funding and other requirements to allow a final investment decision (FID). FID
within the second half of 2025 will be critical to achieving first concentrate production in 2027.
Page 2
| KGL Resources Annual Report 2024
We have been collaborating with key contractors, government authorities at all levels, and the local community
to maintain the critical support necessary to deliver a major infrastructure initiative. Aligning with Tier-1 service
providers for the mining and plant processing will deliver confidence in the planning and execution of the
project, as does having a major resource player involved for the smooth offtake of concentrate to manage
inventory and working capital.
During the 2024 year we have seen key appointments and promotions to strengthen and balance the
management team including the Chief Financial Officer and Exploration Manager. New additions to the team
included the Site Manager role to focus on site personnel management, safety, environmental controls, and
local stakeholder interactions.
Denis Wood, who has been a key driver at KGL in terms of the exploration strategy and operations of the
company, retired as Executive Director and Chairperson early in 2024. During the interim period whilst filling
the Chief Executive Officer role, the company was fortunate to have Kylie Anderson step into the role to
maintain the company momentum.
KGL recognises that developing projects in this challenging environment requires a sound people strategy,
in particular, an experienced team of professionals with a proven track record in mine development. In this
regard, KGL was pleased to announce the appointment of Mr. Philip Condon as Chief Executive Officer in
July 2024. Philip brings over 35 years of extensive industry experience across a wide range of commodities
and countries, with a particularly deep knowledge of the copper industry. His expertise, gained from working
at CSA underground copper mine at Cobar, Freeport’s Grasberg underground copper mine in West Papua,
and Mawarid Mining Company’s copper project in Oman, will be invaluable as KGL builds a skilled team to
advance the project with a feasibility study update in the final quarter of this year.
I take this opportunity to extend my gratitude to all Jervois stakeholders, particularly the Central Lands Council,
the Bonya community, Lucy Creek, and Jervois Station pastoralists, as well as the Northern Territory government,
for their ongoing support. I would also like to thank our employees for their contributions over the past year and
look forward to making considerable progress in advancing the Jervois Project towards production.
Finally, to our valued shareholders, I extend my heartfelt thanks for your unwavering patience, confidence,
and steadfast support of the company. Your trust in our vision and commitment to our shared goals have
been instrumental in our journey. We appreciate your continued belief in the Jervois Project’s potential as we
navigate the challenges and opportunities ahead.
Jeff Gerard
Chairman
Brisbane
24 September 2024
Page 3
| KGL Resources Annual Report 2024
Operations Review
KGL Resources Limited (KGL, the Company) has continued to progress development of its high-grade Jervois
Project (Jervois, the Project) through the year ended 30 June 2024 with the goal of delivering the Project into a
copper market at a time of chronic supply shortfall.
The Company has been actively exploring ways to enhance key Project value drivers while also identifying
opportunities to improve productivity. This focus is particularly important given the challenges posed by global
and domestic inflation, disruptions to global supply chains, and geopolitical tensions. These factors have
significantly influenced the pricing and availability of skilled labour, energy, materials, equipment, and contractors.
The Company’s goal is to ensure it can deliver a cost competitive project, on time and on budget, and progress
to a final investment decision (FID) and first production in 2027 while, at the same time, increasing confidence in
the resource, and growing the mine life and value of the underlying resource.
The key milestones achieved during the year were:
Maiden JORC Measured Resource reported for Reward.
The updated Reward resource, combined with the
Bellbird resource, gives JORC Measured Resource
within two planned open pits at the Project: 67%
Measured; 32% Indicated; 1% Inferred.
Progress has been made on an update of the open
cut and underground mine design on the back of
an updated mineral resource estimate. A feasibility
study update, together with updated reserve, is
underway.
rilling during the past 12 months has increased
D
confidence in the Jervois mineral resource to
23.37 million tonnes at 2.02% copper, 26.0 g/t silver
and 0.26 g/t gold for 472.2 kt of copper, 19.5 Moz
of silver and 192.8 koz of gold.
echnology selection and design of the
T
processing plant (sulphide and oxide) is
complete with an increase in the nominal annual
processing capacity from 1.6 million tonnes per
annum to 2.0 million tonnes per annum.
GL continues to target near mine extensions in
K
proximity to the existing deposits of Reward and
Rockface which have the potential to add
considerable value for shareholders.
GL was pleased to announce the appointment
K
of Mr. Philip Condon to the position of Chief
Executive Officer, effective 29 July 2024.
Philip has extensive experience in the industry
spanning more than 35 years across a wide
range of commodities and countries with a
particularly deep knowledge of the copper
industry and all aspects of project development.
he Company’s understanding of the geological
T
structures and potential prospectivity at Jervois
continues to improve with some of the highest grades
of polymetallic mineralisation ever encountered at
Jervois confirmed from recent drilling at Rockface Deeps.
FEASIBILITY STUDY AND UPDATE
In November 2022, the Company completed its feasibility study on the Jervois Project. The study revealed an
increase in the mine life from 7.5 years to 11.75 years, a 25% increase in copper metal produced, compared to the
December 2020 prefeasibility study, and a 25% increase in ore reserves.
The study was based on expected production of 24.7 kt of copper metal in concentrate with gold and silver payable
credits annually, with a pre-production capital cost of A$298 million. The study assumed a long-term copper price
of US$4.23/lb and, assuming this price, the Project was expected to have a net present value (8% real, after-tax) of
A$241 million, an internal rate of return of 20.7%, and a simple payback of 4.2 years. The Project was also shown
to be well-positioned to benefit from an expected long-term copper shortage, a consequence of meeting global
decarbonisation goals.
KGL has taken the opportunity to progress optimisation studies to improve key Project value drivers and identify
opportunities for productivity improvements since the release of the feasibility study in November 2022, which
coincided with the peak rate of inflation on a quarterly basis in Australia. These improved value drivers are aimed to
support the goal to commence operations in 2027, a time of a forecast long-term chronic copper shortfall.
A feasibility study update is scheduled for release in the final quarter of 2024. This will include an updated open
cut and underground mine design, and schedules and costing reflecting the increase in mineral resource estimate.
Process plant, civil works and ancillary infrastructure costings will be updated where applicable. Once an updated
feasibility study is completed, KGL intends to complete an independent technical review with the aim to reach FID,
progress financing for the Project, to commence operations in 2027.
Page 4
| KGL Resources Annual Report 2024
OPERATIONS REVIEW (CONTINUED)
COPPER MARKET
Whilst a softer short-term demand view for the copper market is expected to result in a marginal surplus for
the remainder of 2024 and in 2025, the medium to long-term outlook for copper remains strong with forecast
supply deficits likely to grow.
In addition to traditional demand growth from developing economies, accelerating demand from the clean
energy transition is likely to support the long-term outlook for copper demand. Most nations have committed
to net-zero emissions targets. Carbon dioxide emissions need to fall by about 45% from 2010 levels by 2030
to reach net zero by 2050, requiring significant investment in renewables, grid upgrades and electric vehicles
(EVs). With EVs at least three times as copper intensive as internal combustion engine vehicles, analysts expect
the transport sector to make up over 20% of globalDemand
copper demand
by 2040,
compared
only 11% Supply
today.
for Copper
Is Likely
to to
Outstrip
New technologies will also drive
demand. Major technology companies
are expected to invest $1 trillion in
data centres over the next five years.
Artificial intelligence data centre racks
could require seven times more power
than traditional data centre racks.
Demand growth in this sector, currently
about 1% of global copper demand,
could grow six-fold by 2050.1
Demand for Copper is Likely to Outstrip Supply
The expected accelerating copper
demand is forecast to lead to copper
shortages later in the decade at a time
when new mines are becoming ever
harder to build.
1 https://sprottetfs.com/media/6112/setm-investorpresentation.pdf
Source: BloombergNEF Transition Metals Outlook 2023. The black line represents supply and the shaded areas represent demand.
Demand is based on a net-zero scenario, i.e., global net-zero emissions by 2050 to meet the goals of the Paris Agreement.
Source: BloombergNEF Transition Metals Outlook 2023. The black line represents supply and the shaded areas
represent
demand.
Demand
based on
a net-zero
scenario,
i.e., global net-zero
by2024)
2050 to meet
Figure
1 Sprott:
Copper
– A iscentral
role
in electricity
transmission
and EVs.emissions
(31 March
the goals of the Paris Agreement.
While recycled scrap will be an important source of supply to meet growing demand, primary mine
supply is struggling to keep up and continues to face large-scale challenges. Industry analysts estimate
that the world will require about 10 Mtpa of copper supply over the next 10 years, including mine life
extensions and replacement for depletions. This translates to around a quarter of a trillion dollars
investment in the sector for the same period.
Lower grades and increased depth
and complexity of deposits present
significant below-ground challenges
for primary supply while growing
regulatory, environmental and
sustainability commitments add to
the cost of developing a mine, and
this inflationary trend may prove
stubbornly persistent.
Major copper discoveries, 1990–2023
S&P Global has noted the
disconnect between major copper
discoveries and exploration budgets
per the adjacent chart.
As at 11 June 2024.
MMt - million metric tons; $/t=dollars per metric ton. Source: S&P Global Market Intelligence. ©2024 S7P Global.
Page 5
| KGL Resources Annual Report 2024
Reserves and Resources Table
RESOURCE
MINERALISED MASS
Area
Reward
Open Cut Potential
> 0.5 % Cu*
Bellbird
Underground
Potential
> 1 % Cu*
Bellbird
Rockface
METAL
Category
(Mt)
Copper
(%)
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Silver
(Moz)
Gold
(koz)
Measured
2.63
1.91
46.20
0.43
50.30
3.91
36.0
Indicated
0.92
1.61
43.20
0.26
14.81
1.28
7.7
Inferred
0.68
0.94
10.70
0.07
6.41
0.23
1.4
Measured
1.23
2.53
15.1
0.14
31.18
0.6
5.6
Indicated
1.26
1.45
9.1
0.17
18.23
0.37
6.8
Inferred
1.02
1.24
10.6
0.12
12.67
0.35
4.0
7.74
1.72
27.1
0.25
133.6
6.7
61.5
Indicated
5.3
2.0
40.8
0.4
107.3
6.9
70.8
Inferred
3.7
1.5
18.6
0.2
56.1
2.2
23.9
Sub Total
Reward
GRADE
Indicated
0.33
2.33
19.8
0.14
7.78
0.21
1.5
Inferred
2.84
2.09
12.3
0.11
59.15
1.12
9.7
Indicated
2.80
3.37
21.4
0.23
94.31
1.93
21.1
Inferred
Sub Total
TOTAL
0.73
1.92
19
0.18
13.97
0.45
4.2
15.62
2.17
25.5
0.26
338.6
12.8
131.3
23.37
2.02
26.0
0.26
472.2
19.5
192.8
Refer to ASX release for resource update on 23 May 2024.
* Cut-off grades: 0.5% Cu within approximately 150m of the surface; above 1% CU below 150m.
Ore
(Mt)
RESERVES
Cu grade
(%)
Cu
(kt)
Au
(g/t)
Au
(koz)
Ag
(g/t)
Ag
(Moz)
Reward Open-Cut
Probable Reserve
2.34
1.73
40.6
0.3
25.7
38.5
2.9
Bellbird Open-Cut
Proven Reserve
1.40
2.07
29.1
0.1
5.2
12.3
0.6
Probable Reserve
0.44
1.12
5.0
0.1
0.9
5.9
0.1
Rockface Underground
Probable Reserve
2.32
3.26
75.3
0.2
17.0
21.3
1.6
Reward Underground
Probable Reserve
1.82
2.30
41.9
0.6
37.6
30.2
1.8
Marshall Underground
Probable Reserve
2.98
1.57
46.7
0.2
21.6
43.2
4.0
Bellbird Underground
Probable Reserve
0.43
1.77
7.7
0.1
1.2
14.2
0.2
Proven Reserve
1.40
2.07
29.10
0.12
5.20
12.30
0.60
Probable Reserve
10.33
2.10
217.20
0.31
104.00
32.10
10.60
RESERVES TOTAL
11.73
2.10
246.30
0.29
109.20
29.8
11.20
Quantities and grades in the above table may not add exactly due to rounding or weighting. The ore reserves reported are contained within the mineral resources.
COMPETENT PERSON’S STATEMENT
The Jervois resources information was first released to the market on 23 May 2024 and complies with JORC
2012. The company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement, and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The company confirms that the form and context in which the competent person’s findings
are presented have not been materially modified from the original market announcement.
The Jervois reserves information was first released to the market on 10 November 2022 and complies with
JORC 2012. The company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcement, and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The company confirms that the form and context in which the competent person’s findings
are presented have not been materially modified from the original market announcement.
Page 6
| KGL Resources Annual Report 2024
Tenement Map and Holdings
The Company’s current tenement holdings cover over 600km2 of Jervois Mining Leases, 37.9km2 of Jervois
Exploration Licences and 72.7km2 of Unca Creek Exploration Licences.
1
TENEMENT
NUMBER
PROJECTS
BENEFICIAL HOLDING
EXPIRY
ML 30180
Jervois Project, Northern Territory
100%
27/01/2034
ML 30182
Jervois Project, Northern Territory
100%
25/03/2034
ML 30829
Jervois Project, Northern Territory
100%
17/08/2032
ML 32277
Jervois Project, Northern Territory
100%
17/08/2032
EL 25429
Jervois Project, Northern Territory
100%
01/02/2025
EL 30242
Jervois, Northern Territory
100%
25/11/2024
EL 28340 1
Yambah, Northern Territory
100%
03/07/2024
EL 28271
Yambah, Northern Territory
100%
05/04/2025
EL 28082
Unca Creek, Northern Territory
100%
29/12/2025
Exploration licence renewal has been lodged.
Page 7
| KGL Resources Annual Report 2024
JERVOIS PROJECT TENEMENTS
Page 8
| KGL Resources Annual Report 2024
Sustainability
Environment, social and governance reporting and
indigenous relations remain top priorities for KGL.
KGL emphasises health and safety by vigilant
monitoring, continuous updates, and effective controls
over its operations. The welfare of the Company’s
workforce remains paramount.
Ongoing interactions continue with key local
stakeholders, and site visits are made to ascertain
pivotal sustainability aspects relevant to both the local
community and the business. This includes refining
the set of overarching sustainability goals, targets, and
performance metrics.
The Company is also dedicated to employing local
personnel and engaging local businesses.
Page 9
The Company’s methodology for active management
of environmental responsibilities and compliance
with reporting mandates is outlined in the approved
Mining Management Plan. An environmental risk
assessment has been completed. No environmental,
social, economic or human health and safety risks
with extreme initial or residual risk rating were
identified.
The Company continues to refine its hybrid power
generation design (solar/battery/generators) targets
furthering its commitment to reduce the Jervois
Project’s carbon footprint. Water intensity and re-use
are also being optimised.
| KGL Resources Annual Report 2024
Corporate Governance Statement
as at 30 June 2024
Approved by the Board of KGL Resources Limited
PRINCIPLE 1
LAYING SOLID FOUNDATIONS FOR MANAGEMENT AND OVERSIGHT
THE BOARD CHARTER
The overriding responsibility of the Board, as set out in the Board Charter, is to act honestly, fairly, diligently and in
accordance with the law in serving the interests of the Company’s shareholders, as well as its employees and its
customers. The Board should work to promote and maintain an environment within the Company that establishes
these principles as basic guidelines for all of its employees and representatives at all times.
More specifically, the role of the Board is to provide strategic guidance for the Company and to effectively
oversee management of the Company. The Board’s and Chairman’s responsibilities are set out below.
AREA
BOARD RESPONSIBILITY
CEO and Senior Executives
Appointing and removing senior executives and monitoring their performance.
Authorities
Determining and approving the levels of authority to be given to senior executives in
relation to operational expenditures, capital expenditures, contracts and authorising
any further delegations of those authorities by senior executives to the other
employees of the Company.
Corporate Strategy
Approval of corporate strategy, financial plans and performance objectives.
Risk Management
Reviewing, ratifying and monitoring risk management and internal control systems,
codes of conduct and legal compliance.
Health Safety and Environment
Monitoring occupational health, safety and environmental performance. Compliance
and commitment of appropriate resources.
Capital expenditure and Management
Evaluating, approving and monitoring major capital expenditure, capital management
and all major corporate transactions including the issue of securities.
Reporting
Approving all financial report, material reporting and external communications.
Company Secretary
Appointment of Company Secretary.
AREA
CHAIRMAN RESPONSIBILITY
Leadership
Leadership of the Board, facilitating effective contribution and promoting constructive
and respectful relations between Directors and the Board and Management.
Meeting Conduct
The Chairman is also responsible for setting the agenda for Board meetings and
ensuring the efficient organisation and conduct of the Board’s function, the briefing
of all Directors in relation to issues arising at Board meetings and overseeing
communications to shareholders and arranging Board performance evaluation.
Page 10
| KGL Resources Annual Report 2024
To effectively carry out its responsibilities, the Board
delegates all other functions to the Chief Executive
Officer (CEO). Management, led by the CEO, is
responsible for running the affairs of the Company
under delegated authority from the Board and
implementing the policies and strategies set by
the Board.
With the knowledge of the Chairman, Directors may
seek independent professional advice at the expense
of the Company on any matter connected with the
discharge of their responsibilities. The Chairman may
determine whether any such advice received by a
director will be circulated to the Board.
A copy of the Board Charter can be found on the
Company’s website www.kglresources.com.au.
The Board Charter is reviewed every two years.
NOMINATION AND
APPOINTMENT OF DIRECTORS
Before a director is appointed, the Board undertakes
appropriate evaluations including in-depth interviews
and reference checks. All members of the Board
are given the opportunity to interview the potential
appointee.
Where a director is standing for election or reelection, the Notice of Meeting, including the
Explanatory Memorandum, will set out information on
the director including qualifications and experience,
independence status and the recommendation of the
rest of the Board on the resolution. A statement as to
whether the Board supports the election/re-election
of each director standing for election is provided.
Additionally, a detailed profile for each director is
included in the Company’s Annual Report.
TERMS OF APPOINTMENT FOR
DIRECTORS AND EXECUTIVES
Each director executes a Letter of Appointment with
the Company prior to appointment as a director. The
Letter of Appointment covers the following key terms:
•
•
•
•
•
•
•
•
•
•
continuing appointment contingent on
performance and shareholder elections,
performance requirements in terms of Board
meetings and matters under consideration,
key responsibilities and powers as detailed in the
Board Charter,
conditions of continuing in the role of director,
membership of committees,
remuneration,
directors’ and officers’ liability insurance,
confidentiality,
consideration of independence, and
ability to seek independent advice.
A separate Deed of Insurance and Indemnity is
executed by each director.
Upon appointment, the chief executive officer’s terms
of contract, including remuneration, is provided to the
market in an ASX announcement.
Details of each director’s and other key management
personnel’s employment terms and conditions are
also provided annually in the Remuneration Report as
part of the Directors’ Report.
Each executive is employed under an employment
agreement which sets out the employment terms,
duties and responsibilities, remuneration details and
the circumstances under which employment can
be terminated.
COMPANY SECRETARY
The company secretary reports solely to the Board
and communication between the directors and
the company secretary is open and unfettered.
The company secretary advises the Board and its
committees on governance matters, attends and
takes minutes at all Board meetings, communicates
with the ASX and ASIC on all regulatory matters,
monitors adherence to Board policies and
procedures and retains professional advisors at the
Board’s request.
Page 11
| KGL Resources Annual Report 2024
DIVERSITY POLICY
PRINCIPLE 2
The Company believes in equal opportunities for all
of its people and recognises that its business benefits
from the diversity of its people. The Company has a
Diversity and Inclusiveness Policy and is committed
to developing a diverse and inclusive workforce
and providing a respectful environment free from
discrimination.
The Company believes that recruitment and
promotion of people should be based on merit,
regardless of race, gender or gender orientation,
age, relationship or family status, disability, sexual
orientation, nationality, political or religious beliefs,
or any other factor not relevant to an employee’s
competence and performance. The Company is
focused on eliminating bias in all its forms. No form
of unlawful discrimination will be tolerated.
The Board has not set measurable objectives for
achieving gender diversity however there has been
progress made in recruiting women into what is
considered a traditionally male dominated industry.
The Group has 24 employees, 42% being female.
The Company is not a ‘relevant employer’ as defined
under the Workplace Gender Equality Act.
A copy of the Diversity and Inclusiveness
Policy can be found on the Company website
www.kglresources.com.au.
BOARD EVALUATION
The Company is currently a small single project
company. It is yet to develop a procedure for
evaluating the performance of the Board as the
outcomes related to the Project align with the
outcomes required of the Board. As the Company
advances the development of the Jervois Project,
consideration will be given to how best to structure a
Board performance review.
SENIOR EXECUTIVE EVALUATION
As the Company advances the Jervois Project,
consideration will be given to the appropriate
structure of the executive roles within the Company.
As positions are filled, the Board will consider the
processes for evaluating the performance of senior
executives.
STRUCTURING THE BOARD TO
BE EFFECTIVE AND ADD VALUE
NOMINATION COMMITTEE
At this point in time, the Board only comprises three
non-executive directors. The Board considers that
it is more efficient to deal with matters relating to
nomination at a Board level rather than delegating to
a committee.
When the Board increases the number of directors
and the Company reaches a sufficient stage in its
development, the Remuneration Committee, which
comprises the functions of a Nomination Committee
will be re-formed. The Remuneration Committee
Charter is listed on the Company’s website under the
Corporate Governance section.
BOARD SKILLS
Directors recognise the following skills as being
either essential or desirable to the effective operation
of the Board. An assessment is made as to whether
these skills are required from the members of the
Board or whether they are better sourced through a
consultant. External consultants have been used on a
limited basis.
The directors have undertaken an assessment of
their skills against the fol
Share your feedback
Discover