Investor Presentation
Released
Released
Announcement PDF
ASX:KGL
Investor Presentation
Equity Raising
Approved by KGL Resources Board
March 2025
Important Notices and Disclaimer
No reliance: To the maximum extent permitted by law, the information in this presentation is given without any liability whatsoever being accepted by KGL or any of its related bodies corporate or their
respective directors, officers, employees, advisors and agents (together, the Relevant Parties). The information contained in this presentation is not intended to constitute legal, tax or accounting advice
or opinion. No representation or warranty, expressed or implied, is made as to the accuracy, completeness or thoroughness of the information, whether as to the past or future. Recipients of this
presentation must make their own independent investigations, consideration and evaluation. To the maximum extent permitted by law, each Relevant Party disclaims all liability and responsibility for any
direct or indirect loss or damage which may be suffered by any recipient through the use of or reliance on anything contained in or omitted from this presentation or its contents or otherwise arising in
connection with it.
Limited disclosure: This presentation contains summary information about KGL and its activities which is current at the date of this presentation (unless otherwise noted). The information in this
presentation is of a general nature. This presentation does not purport to contain all the information that a prospective investor may require in evaluating a possible investment in KGL. It should be read
in conjunction with KGL’s other periodic and continuous disclosure announcements lodged with ASX, which are available at www.asx.com.au.
Seek your own advice: In providing this presentation, KGL has not considered the objectives, financial position or needs of the recipient. The recipient should consult with its own legal, tax or
accounting advisers as to the accuracy and application of the information contained herein, and conduct its own due diligence and other enquiries in relation to such information and any investment in
KGL and the recipient’s objectives, financial position or needs.
Financial information: All references to ‘$’, ‘A$’ or ‘AUD’ in this presentation are to Australian dollars unless otherwise noted.
Certain financial data included in this presentation is ‘non-IFRS financial information’ under ASIC Regulatory Guide 230 ‘Disclosing non-IFRS financial information’ published by ASIC and is also
considered ‘non-GAAP financial measures’ under Regulation G of the US Securities Exchange Act of 1934, as amended. Such measures are not recognised under Australian Accounting Standards or
the International Financial Reporting Standards (IFRS). The disclosure of such non-GAAP financial measures in the manner included in this presentation may not be permissible in a registration
statement under the US Securities Act.
KGL believes the non-IFRS financial information / non-GAAP financial measures provide useful information to users in measuring the financial performance and condition of KGL. However, investors
should note that the non-IFRS financial information / non-GAAP financial measures do not have a standardised meaning prescribed by the Australian Accounting Standards or IFRS.
Therefore, the non-IFRS financial information / non-GAAP financial measures are not a measure of financial performance, liquidity or value under the Australian Accounting Standards or IFRS and may
not be comparable to similarly titled measures presented by other entities, nor should the information be construed as an alternative to other financial measures determined in accordance with Australian
Accounting Standards or IFRS. Investors are therefore cautioned not to place undue reliance on any non-IFRS financial information / non-GAAP financial measures included in this presentation
Cautionary note regarding reserves and resources: As an Australian company with securities listed on ASX, KGL is required to report ore reserves and mineral resources in accordance with the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mining companies in other countries may be required to report their mineral
reserves and / or resources in accordance with other guidelines (for example, Subpart 1300 of Regulation S-K in the United States).
This announcement contains certain ‘forward-looking statements’ within the meaning of the securities laws of applicable jurisdictions. Forward-looking statements can generally be identified by the use
of forward-looking words such as ‘may,’ ‘should,’ ‘expect,’ ‘anticipate,’ ‘estimate,’ ‘scheduled’ or ‘continue’ or the negative version of them or comparable terminology. Any forecasts or other forward
looking statements contained in this announcement are subject to known and unknown risks and uncertainties and may involve significant elements of subjective judgment and assumptions as to future
events which may or may not be correct. There are usually differences between forecast and actual results because events and actual circumstances frequently do not occur as forecast and these
differences may be material. KGL does not give any representation, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in this
announcement will actually occur and you are cautioned not to place undue reliance on forward-looking statements.
Jervois Copper Project Update | March 2025 | ASX:KGL
2
Highlights
Feasibility Study Update released
with robust economics, attractive
capital efficiency and strong margins
All necessary approvals
to commence construction in
Tier One mining jurisdiction
High Grade Cu Project
29Mt @ 1.8% Cu with Au & Ag credits
significant growth potential through
ongoing targeted exploration
10 Year Mine Life
straightforward processing,
~1Mt Cu concentrate LOM
(30k tpa Cu contained
steady state)
Jervois Copper Project Update | March 2025 | ASX:KGL
Experienced Board and
management
Track record in projects
Building the delivery team
Robust copper market
fundamentals
Jervois expected to produce into
growing supply deficits
3
Jervois Project, NT
▪ KGL’s Jervois Project is a high-grade polymetallic project mid way between
Alice Springs, Northern Territory and Mt Isa, Queensland.
•
•
•
•
Fully Permitted
➢
Initial 10 year mine.
➢
2-year delivery timetable coincides with projected Cu supply gap.
High Grade Resource
➢
29mt @ 1.8% Cu.
(including Rockface indicated resource of over 3% Cu).
➢
Resources contain > 500kt of Cu, 23 Moz of silver and 210koz of gold.
Attractive Economics - Leveraged to rising copper price
➢
Average 30kt per annum copper contained (steady state).
➢
NPV (8%) after-tax $405 M @ US$4.58/lb (@ AU$0.64).
Extensive Exploration Potential
➢
Adjacent to a crustal scale fault, large high-grade under-explored
mineralising system with significant upside potential, open both
laterally and at depth.
➢
Exploration targets
➢
Building on high grade at Rockface and southern domain lateral
extension.
➢
Scarpe trend - similar mineralisation to Reward (brecciated IOCG).
➢
Lead / Zinc mineralisation addition.
Jervois Copper Project Update | March 2025 | ASX:KGL
4
Jervois Project: Overview
▪ Two open pit mines (Reward and Bellbird) and four underground mining
areas (Rockface, Reward, Marshall, Bellbird).
➢ Open cut operations - primary ore feed for first four years using
conventional earthmoving equipment.
➢ Transition to Underground – initial development and stooping.
▪ Straightforward Metallurgy
➢ 95% sulphides at 92% Cu recovery.
➢ Simple process plant design with nameplate capacity 2 Mtpa ore,
(a 25% increase from FS22.)
➢ Ore milling and regrind, using Jameson cells for rougher and cleaner
flotation and filters.
➢ Approx. 1 Mt of 27% Cu concentrate with Au & Ag credits over a 10
year mine life.
➢ Average production rate of 30kt per annum copper contained steady
state following plant ramp up.
▪ Concentrate to be sold under a Free on Transport (FOT) / ex-site,
commercial offtake contract being finalised.
Jervois Copper Project Update | March 2025 | ASX:KGL
5
Equity Raising
Jervois Copper Project Update | March 2025 | ASX:KGL
6
Equity Raising Overview
◼
Equity raising to raise up to A$7.7 million, comprising:
a 1 for 8 pro-rata traditional non-renounceable entitlement offer (Offer)
Offer Structure &
Size
Top-up Facility
Commitments for A$2.7 million 1
◼
Minimum raising of A$3 million (before costs) under the Offer
◼
Up to approximately 81 million new KGL shares (New Shares) will be issued
◼
Top-up facility for shareholders
Unlimited Top-up facility available to participating shareholders:
◼
Offer price of A$0.095 per New Share, which as of close of trading on 4 March 2025 represents:
a 3% discount to the 17-day VWAP of KGL shares on ASX of A$0.098 2
Offer Price
a 5% discount to the last closing price of KGL shares on 4 March 2025 of A$0.10
a 3% discount to TERP of A$0.099 (assuming a full take up of Offer) 3
◼
Use of Proceeds
Shareholder
Support
◼
Minimum raise of A$3 million 4 allow the Company to make commitments to progress the following:
◼
Corporate Financial Advisor(s) to deliver Project Funding options required for construction
◼
Corporate and Site overheads
KGL’s largest shareholder, KMP Investments (35.14%) is supportive and have committed to take up their entitlements under
the Offer in full. 1
Note 1: KGL’s largest shareholder, KMP Investments (35.14%) is supportive and has committed to take up their entitlements under the Offer in full.
Note 2: The average of the volume-weighted average prices (VWAP) of the ordinary shares in KGL on ASX for the last 17 trading days ending on 4 March 2025 (rounded).
Note 3: The theoretical ex-rights price (TERP) including shares issued under the Offer (on the assumption that it is fully subscribed).
Note 4: The ‘minimum raise condition’ is satisfied if the Company receives commitments under the Offer for no less than A$3 million (before costs).
Jervois Copper Project Update | March 2025 | ASX:KGL
7
Equity Raising Overview
Sources of Funds
$ (Min)
$(Max)
Existing Cash Position 1,2
A$5.4m
A$5.4m
Entitlement Offer 3
A$3.0m
A$7.7m
Total
A$8.4m
A$13.1m
Use of Funds (includes
January and February 2025
expenditure)
$ (Min)
A$5.0m
A$5.0m
Corporate and Site Overheads
A$2.9m
A$3.4m
Initial Siteworks enabling critical
path activities
Total
A$0.5m
-
A$1.7m
A$3.0m
Share Price 1
A$0.10
A$0.099 A$0.099
Ordinary Shares On Issue
648.1m
679.7m
Market Capitalisation
A$64.8m A$67.8m A$72.5m
Cash 2
A$5.4m
A$8.4m A$13.1m
Debt 3
A$0m
A$0m
729.1m
A$0m
A$59.4m A$59.4m A$59.4m
A$13.1m
Note 1: Cash position as at 31 December 2024 based on KGL’s December 2024 Appendix 5B.
Use of Funds includes expenditure from 31 December 2024.
Note 2: Cash position as at 28 February 2025 was c.A$3.1m.
Note 3: Assuming A$3.0 million minimum raise; funds raised in excess of the A$3.0 million minimum raising (up to an additional A$4.7 million in
the event that the Offer is fully subscribed) will be used to continue initial siteworks and geophysical investigations. The Board reserves
the right to change the allocation of funds where there are changes in market conditions, exploration priorities or strategic objectives.
Jervois Copper Project Update | March 2025 | ASX:KGL
Post Equity
Raising
Min
Max
Raise
Raise
(A$3m) (A$7.7m)
Enterprise Value
A$8.4m
Current
$(Max)
Project Funding for Construction
Project Execution, planning and
finalise ITR
Key Information
Note 1: Post equity raising price is TERP calculated based on $A3.0 million and A$7.7 million Equity Raising.
TERP is a theoretical calculation only; the actual price at which KGL shares trade immediately after the
ex-date may differ.
Note 2: Current Cash is at 31 December 2024 based on KGL’s December 2024 Appendix 5B. Post equity raising
position reflects proceeds before costs.
Note 3: Excludes lease liabilities & December 2024 creditors.
8
Funding for Project Construction
▪ Company can now actively engage with equity and debt investors as part of the capital raising process for project development.
▪ The Project is expected to be funded via a combination of equity, term and working capital debt.
▪ KGL is appointing a financial advisor(s) to assist in structuring and funding process for the Jervois Project.
•
Equity discussions include institutional investors, strategic partnering and other investors.
•
This process will run in parallel with the senior debt and working capital process and will support an optimised funding package
for construction through to steady state concentrate production and sales.
▪ The Project’s total funding requirement amounts to $498m peaking during Q1 2027 (pre-financing costs) comprised of:
•
Pre-production capital costs of A$362 million.
•
Working capital A$136 million – primarily open pit ramp up prior to plant commissioning.
•
Additional support from Federal Government funding initiatives will be targeted.
•
Project Construction is expected to commence in 2nd half calendar 2025 1.
•
The Project is expected to bring significant employment and economic benefits to the Northern Territory including economic
development, regional infrastructure, opportunities for Indigenous engagement, employment and royalties.
Note 1: Timeframes to construction and mining referred to in this presentation assume that the necessary project funding (debt and equity/partnership) package for construction can be procured in the coming months without any substantive
delay. Successful project financing for the Jervois Project will depend on a range of factors, many of which are outside of KGL’s control. For more information refer to the risk: "FID delay risk" on slide 27 for more information.
Jervois Copper Project Update | March 2025 | ASX:KGL
9
Feasibility Study Overview
Jervois Copper Project Update | March 2025 | ASX:KGL
10
Feasibility Study Update – Headline numbers
$405 M
c.$229 M
$112 M
10 Year
Post Tax NPV (8%) @ US$4.58/lb
Average EBITDA (Steady State)
Avg. After-tax Free Cash Flow 1
Mine Life
Post Tax NPV (8%) A$682 M @ US$5.90/lb
29
Cu
Copper
$362 M
30 kt pa
$1.95/lb
24% / 3.4 Yrs
Pre-production Capital Cost 2
Avg. Annual Cu Production
C1 Cash Costs (steady state)
IRR (post tax) / Payback Period
Capital Efficiency A$12,000/t
With gold & silver credits
Jervois starts production
Note 1. Reflects the first 10 years of production. Free cashflow is unlevered.
Note 2. Funding requirement excludes working capital (open pit opex and contingency of $136m).
Jervois Copper Project Update | March 2025 | ASX:KGL
11
Robust 10 year mine life
with upside potential
Ore Tonnage Mined by Source - Financial Year
2.5
✓ Additional adjacent open pit areas are being
considered.
CuEq Grade (%)
✓ Proportion of lower cost open cut ore (now primarily all
Proven reserves) has increased from 25% to 41% of total
ore mined. (FSU25 vs FS22).
Ore Mined (Mt/year)
2.0
1.5
1.0
0.5
-
✓ Installed processing plant capacity enables incremental
concentrate output above current plan.
Bellbird OP
Reward OP
Bellbird UG
Reward UG
✓ Simple payback is achieved during the period of open pit
ore feed to mill (incl. underground pre-production costs).
✓ Mill feed transitions to underground ore in year 4 with the
average Cu Eq. grade @ 2.2%, peaking in year 7 to
c.3% Cu Eq., as mining progresses deeper.
Concentrate Production based on Ore Reserve - Financial Year
140
100%
90%
120
✓ All lodes remain open, laterally and at depth.
✓ Proven and Probable Reserves: 14.4Mt at 2.1% Cu Eq.
✓ 87% of LOM ore tonnage.
Thousand Tonnes
✓ Steady state production avg. 30 ktpa Cu contained in
concentrate. (~34 ktpa Cu Eq. payable).
70%
60%
80
50%
60
40%
30%
40
Ore Reserve %
80%
100
20%
20
10%
0
0%
Concentrate Production
Jervois Copper Project Update | March 2025 | ASX:KGL
12
Project Generates Robust Economics
Short Payback / Strong Margins
✓ Technically robust:
– Inputs from Xenith, Sedgman, Tier 1 mining
contractors.
– Independent review by RPM (Critical Issues)
- “No Red Flags”.
✓ Low capital Intensity (A$12,000/t Cu).
✓ Strong cash generation:
EBITDA Profile - Financial Year
– Strong EBITDA $229m p.a. (steady state).
700
600
– Short Payback (3.4 yrs)1 / IRR (24%).
✓ NPV (8% real, after tax) $405M ($0.62/share).
✓ Significant value upside:
A$m Real
✓ Copper contributes approximately 84%, whilst gold and
silver by-products contribute circa 6% and 10%,
respectively (gross revenue basis).
500
400
300
200
100
(100)
– Resource growth / life extension and
Net Revenue
Operating Costs
Royalty
EBITDA
– Cu price, driven by forecast copper supply deficit.
Note 1: Simple payback from first concentrate.
Jervois Copper Project Update | March 2025 | ASX:KGL
13
Jervois Project FSU25: Key Metrics
Operating Metrics
Metal Price & Other Key Assumptions
Assumption
Units
Value
Assumption
Unit
L/T
Mine Life
Years
10
Copper Price
US$/lb
4.58
Life of Mine Net Revenue
A$ billion
4.4
Gold Price
US$/oz
2,668
Life of Mine EBITDA
A$ billion
1.9
Silver Price
US$/oz
32.62
Cu Concentrate (LOM)
kdmt
983
FX AU$:US$
US$
0.64
Diesel Prices
A$/L
1.30
Electricity Prices
c/kWh
29.8
Production
Copper (steady state)
kt pa
30
Silver
koz pa
1,016
Gold
koz pa
8.4
NPV (8% real, after tax) – Sensitivity to Copper Prices
1000
C1 Cost steady state
US$/lb
1.95
C1 Cost (LOM)
US$/lb
2.19
AISC steady state
US$/lb
2.86
Construction Capital
A$ million
362
Peak Funding
A$ million
498
800
A$ Mn
Operating and Capital Costs
600
400
200
0
Jervois Copper Project Update | March 2025 | ASX:KGL
Base Case
Incentive Price
Bullish Price
(US$4.58/lb)
A$0.62/share equiv.1
(US$5.90/lb)
~A$1.0/share equiv. 1
(US$6.80/lb)
~A$1.5/share equiv. 1
Note 1: Excludes Resource conversion / exploration upside.
14
The Way Forward
Jervois Copper Project Update | March 2025 | ASX:KGL
15
Pathway to production in 2027
Timetable is subject to securing adequate funding.
Jervois Copper Project Update | March 2025 | ASX:KGL
16
Project Delivery - Forward Work Plan
PROJECT EXECUTION PLAN (PEP)
Funding and FID
FID &
Funding
Prep
Operations
Site Prep
Construction
Construction Completion
6 months
12 months
6 months
Ongoing
Plant Procurement
Process Plant Site Erection
Plant: Commissioning & Ramp Up
Plant @ 2Mtpa rate
Clean up and
Drainage
Laydown prep
Reward O/C
Commissioning
OC Mining
commences at BB
Reward & BB Open Pit
Reward OC: 2 x diggers /
BB Completes
Water: Pipeline
Creek diversion
Haul Roads
TSF Construction
Rockface UG Site Prep
UG Mobilisation / Rockface
Development Commences
Construction Water
Supply Dams
Crushing Plant
Preliminary Power
Infrastructure
Site
Electrification
Fencing
Batch Plant
Fuel & Explosives
storage
Ore Feed Stockpile
Camp Infrastructure
Airstrip Bulk
Earthworks
Jervois Copper Project Update | March 2025 | ASX:KGL
Camp
Infrastructure
Airstrip
commissioning
17
Copper Market
Jervois Copper Project Update | March 2025 | ASX:KGL
18
Copper outlook is robust
Market Outlook
Supply Demand Forecast2
▪ S&P Global “demand for refined copper will double … by 2035”.
▪ Demand forecasts reflect global commitments to achieve Net Zero by 2050 with
electric vehicles and the grid key demand drivers + traditional demand growth.
Demand
▪ At COP28 climate change conference, over 60 countries endorsed a plan to triple
global renewable energy capacity by 2030.
▪ Accelerating demand expected from the clean energy transition, data centres and
AI, defence industries and ongoing industrial demand in China, India and SE Asia.
▪ Clean energy technologies are more copper intensive.
Supply Constraint
▪ “The pronounced lack of new projects has begun to bite, constraining refined
copper production and spotlighting years of underinvestment in copper exploration
and development”.1
▪ The average time to progress projects from discovery to production is around
16 years.3
▪ BHP estimates that copper potentially needs around US$250 billion in growth
Concentrate supply is expected to peak in 2025.
Lack of investment and approved project pipeline together with declining
grades in current operations could see a supply gap of 35% by the end of this
decade according to Trafigura5.
capital by 2030.4
Note 1: Michael Widmer, Bank of America, Commodity Strategist – April 8, 2024.
Note 2: Woodmac; Goldman Sachs Global Investment Research
Note 3: Paul Manalo, S&P Global , Discovery to production averages 15.7 years for 127 mines
Note 4: Mike Henry, Bank of America Global Metals, Mining and Steel Conference 2023
Note 5: Emma Powel, The Times, Supply gap for copper “could grow to a third” trader predicts”.
Jervois Copper Project Update | March 2025 | ASX:KGL
19
Copper Market Forecast
▪ The world cannot decarbonise without copper, a key component of renewables and
electrification. According to Wood Mackenzie, copper demand is expected to rise by
75% by 2050, reaching 56 million tonnes, driven by the clean energy transition,
urbanization, and electrification, which will require significant investment in new copper
projects to meet this growing demand. (August 2024).
▪ Global copper demand is expected to accelerate for the period 2021-2035 to grow at
2.6% annually or roughly 1 Mt copper demand growth per year compared with a
1.9% CAGR over the past 15 years. Surging demand is being driven by the
simultaneous adoption of copper-intensive technologies, such as electric vehicles
(EVs), renewable energy systems, grid investments, and data centres, alongside
increased military demand and continued economic development in emerging markets.
Bloomberg NEF Transition Metals Outlook 2023
▪ Lower grades and increased depth and complexity of deposits, present significant
challenges for primary supply. Growing regulatory, environmental and sustainability
commitments have increased the time and cost of developing a mine, and this
inflationary trend may prove stubbornly persistent. The long lead times to develop new
mines are hampering any meaningful supply response.
▪
According to Bloomberg NEF (2023), the copper market is forecast to move into a
growing deficit through this decade, and to grow quickly to expand to a large
deficit of 21 million tonnes per year by 2050. Illustrating this, the orange line in the
adjacent chart represents supply, and the shaded area represents demand (and its
constituents by use type).
▪
According to BHP, “with the deficit conditions anticipated in the final third of the 2020s,
it is possible that we enter into a “fly-up” pricing regime, whereby prices disconnect
from the cost curve due to systematic excess of demand over supply amid inadequate
inventory levels”. BHP’s Economic and Commodity Outlook. August 2024
Jervois Copper Project Update | March 2025 | ASX:KGL
Trading Economics (Feb 2025)
20
KGL Corporate Snapshot
Corporate Structure
KGL Share Price Performance vs Copper Price
ASX Code: KGL
0.25
5.00
Share Price
52 week low / high
648.1m
0.2m
Shares Outstanding
Options on Issue
KGL Share Price A$
A$0.085-$0.14
4.00
0.15
3.50
3.00
0.10
2.50
0.05
2.00
Major Shareholders
A$64.8m
A$5.4m
Market Capitalisation
Cash (31 December 2024)
KMP
Investments
35.1%
Shareholders by Geography
Europe
3.0%
Funds
11.0%
Asia
42.0%
Denis
Wood
8.9%
Marshall
Plenty
7.0%
Other
38.0%
Jervois Copper Project Update | March 2025 | ASX:KGL
Copper Price US$/lb
A$0.10
4.50
0.20
Australia
30.5%
North
America
10.7%
21
Key Takeaways
1
FSU25 delivered Q1 2025
▪ Confirmed robust technical and financial results.
4
expanding Mineral Resources including geophysics
and gravity and magnetic inversion analysis.
▪ Fully Permitted to commence.
▪ Attractive project capital intensity; simple scope
2
Growing the Resource
▪ Active exploration program improving and
and rapid delivery - mitigate construction risks.
▪ All planned UG mining areas remain open at depth.
▪ ITE Report being completed for project funding.
▪ Outside of the current exploration focus, the 12 km.
mineralising system remains relatively
underexplored with exploration targets including
anomalies at depth.
Funding discussions underway
▪ Discussions commenced with potential equity
and debt investors.
▪ Major contracts to be finalized in H1 2025.
▪ Ongoing optimisation work separate to Project
5
Improving copper fundamentals
supportive delivering project into
expected chronic market shortfall
delivery will continue.
3
Experienced Board & Management Team
focused on pathway to production in 2027
Jervois Copper Project Update | March 2025 | ASX:KGL
6
KGL share price has disconnected from
bullish sentiment reflected in the increasing
copper prices. We expect KGL share price
to re-position, benefiting from project
metrics and recent M&A multiples
22
Summary of Key Risks
Material Business Risks
General Risk Factors
Future Capital Raisings and Going Concern
Market
Exploration
Taxation
Final Investment Decision (FID) delay risk
Liquidity
Feasibility and Development
Securities Investment
Regulatory
Economic Factors
Occ Health and Safety
Accounting Standards
Limited Operating History
Key Personnel
Resource and Reserve Estimate
Environmental
Availability of Equipment and Contractors
Cu Price and AUD Exchange
Climate Change
Macro-economic
KGL Resources Limited
23
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
Key Risk Factors
Activities in KGL and its controlled entities, as in any business, are subject to risks which may impact on KGL’s future performance. There are a number of factors, both
specific to KGL and of a general nature, which may affect the future operating and financial performance and position of KGL and the outcome of an investment in KGL.
Some of these risks can be adequately mitigated by the use of safeguards and appropriate systems but many are beyond the control of KGL and its directors and
cannot be mitigated.
Prior to deciding whether to take up their entitlement, eligible shareholders should read the entire Offer information booklet and review announcements made by KGL to
ASX (at www.asx.com.au, ASX: KGL) in order to gain an appreciation of KGL and its activities, operations, financial position and prospects.
Shareholders should also consider the summary of key risk factors set out below which the directors of KGL believe represent some of the specific and general risks
that shareholders should be aware of when evaluating KGL, and deciding whether to increase their shareholding in KGL. The key risk factors set out below are not
intended to be an exhaustive list of all of the risk factors to which KGL is exposed, and they are not intended to be presented in any assumed order of priority.
Additional risks and uncertainties not presently known to the directors of KGL, or which they currently believe to be immaterial, may also have an adverse effect on
KGL.
An investment in KGL should be considered speculative. There can be no certainty that KGL will be able to successfully implement its business strategy. No
representation is or can be made as to the future performance of KGL and there can be no assurance that KGL will achieve its objectives.
MATERIAL BUSINESS RISKS
Future Capital Raisings and Going Concern
KGL’s ongoing activities are expected to require substantial further financing in the future, in addition to amounts raised pursuant to the Offer. KGL will require additional funding to
bring the Jervois Copper Project into commercial production. Any additional equity financing may be dilutive to shareholders and may be undertaken at lower prices than the current
market price, and debt financing, if available, may involve restrictive covenants which limit KGL’s operations and business strategy. Although the directors of KGL believe that
additional capital can be obtained, no assurances can be made, that appropriate capital or funding will, if and when needed, be available on terms favourable to KGL, or at all. If KGL
is unable to obtain additional financing as needed, it may be required to reduce, delay or suspend its operations, and this could have a material adverse effect on KGL’s activities and
could affect KGL’s ability to continue as a going concern.
24
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
Key Risk Factors
Activities in KGL and its controlled entities, as in any business, are subject to risks which may impact on KGL’s future performance. There are a number of factors, both
specific to KGL and of a general nature, which may affect the future operating and financial performance and position of KGL and the outcome of an investment in KGL.
Some of these risks can be adequately mitigated by the use of safeguards and appropriate systems but many are beyond the control of KGL and its directors and
cannot be mitigated.
Prior to deciding whether to take up their entitlement, eligible shareholders should read the entire Offer information booklet and review announcements made by KGL to
ASX (at www.asx.com.au, ASX: KGL) in order to gain an appreciation of KGL and its activities, operations, financial position and prospects.
Shareholders should also consider the summary of key risk factors set out below which the directors of KGL believe represent some of the specific and general risks
that shareholders should be aware of when evaluating KGL, and deciding whether to increase their shareholding in KGL. The key risk factors set out below are not
intended to be an exhaustive list of all of the risk factors to which KGL is exposed, and they are not intended to be presented in any assumed order of priority.
Additional risks and uncertainties not presently known to the directors of KGL, or which they currently believe to be immaterial, may also have an adverse effect on
KGL.
An investment in KGL should be cons
Share your feedback
Discover