Quarterly Activities Report
Period Ended 31 March 2015
Jervois Copper Project
o Progress in optimisation of project economics
o 9,400m drilling programme in progress
o More high grade drill results
Yambah tenements acquired, similar mineralisation to Jervois
Overview
During the quarter, KGL Resources Limited (KGL or the Company) made good progress in
optimising the economics of the Jervois Copper Project, building on the pre-feasibility study
finding that the project is technically and commercially feasible.
The PFS optimisation work, which is continuing, comprises resource drilling, geotechnical
drilling, metallurgical studies and cost reviews.
Increases in the size and quality of the mineral Resource were targeted, with an updated
Resource estimate expected in July.
The optimisation work undertaken so far indicates increases in the recovery rates of copper and
silver, increases in the range of ores which can be processed, and reduces mining and other
operating costs.
The Company acquired two new prospective Northern Territory exploration tenements, with
similar mineralisation style and host rocks to Jervois.
Jervois Copper-Silver-Gold Project, Northern Territory (KGL 100%)
Following the completion of the pre-feasibility study of the Jervois Project in December 2014 summarised in the previous quarterly report - KGL decided to undertake an additional work
program to improve the economics.
The PFS found Jervois to be a viable project with strong upside potential from additional drilling
and metallurgical work. The Company was motivated to seek to optimise the PFS by the
continuing flow of good drill results pointing to a larger, more valuable asset. The optimisation
work is targeting $100M to $200M of additional free cash flow over the life of the project.
The work, which was the main focus of the Company during the March 2015 quarter,
comprised:
Additional resource drilling
Metallurgical work and flow sheet optimisation
Geotechnical review
Review of mining and other operating costs
Drilling
Resource extension
A resource extension RC drilling program commenced in February at the Bellbird, MarshallReward and Green Parrot deposits. Particular emphasis was placed on targeting poorly drilled
areas that have potential for high-grade mineralisation and are within or immediately adjacent to
the proposed open pits or close to planned underground mine development.
This program of 9,400m has been completed and a further 2,000m of drilling has commenced to
bring recently discovered near surface copper mineralisation at Sykes, Johannsen and East
Bellbird into the next Resource update. The results will feed into the updated Resource
estimate expected to be completed in July.
At Bellbird, in-fill drilling around high grade lenses continued to extend the high grade zones of
mineralisation and will result in improvements in the resource tonnes and grade. Similar results
are anticipated at Marshall-Reward and Green Parrot.
Within the main Bellbird resource, hole KJC111 intersected a broad zone of copper
mineralisation (12m @ 2.6% copper from 361m) that will have a positive impact on the
resource.
Hole KJC112 intersected the shallow Bellbird East zone (including 2m @ 2.28% copper, 1.08%
lead, 0.59% zinc and 16.3 g/t silver from 27m); the intersection is in a parallel mineralised zone
on the eastern margin of the Bellbird pit, and will be subject to further drilling.
Drilling of hole KJC109 intersected two zones of copper mineralisation including 6m @ 3.73%
copper from 298m, confirming that high grade mineralisation is continuous between two high
grade lenses within the moderately plunging Bellbird resource.
Drilling also confirmed a northern extension to Bellbird Central.
Geotechnical drilling
During the quarter, the Company completed a 1,260m nine-hole geotechnical diamond drilling
program aimed at assisting with the design of steeper walls at Marshall-Reward and Bellbird to
reduce the mining of waste.
The geotechnical drill holes intersected unexpected copper mineralisation on both the east and
west walls of the Marshall pit. An additional 2,000m of RC drilling is now in progress to follow up
these two new mineralised zones.
Assay results were also received from the metallurgical drilling that was completed late last
year. The results included:At Reward,
12m @ 3.47% copper, 0.36% zinc, 44.4 g/t silver and 0.91 g/t gold from 40m (Hole JMET017)
At Marshall,
8m @ 4.58% copper, 0.37% lead, 0.14% zinc. 89 g/t silver and 0.51 g/t gold from 20m (Hole
JMET019)
At Green Parrot,
7m @ 2.84% copper, 2.32% lead, 0.4% zinc, 158.9 g/t silver and 0.04 g/t gold from 22m (Hole
JMET022)
At Bellbird,
9m @ 5.57% copper, 44 g/t silver and 0.19 gold from 53m (Hole JMET021)
Metallurgical work and flow sheet optimisation
Test work was undertaken to improve our understanding of treating the wide range of ore types
at Jervois. Results so far have highlighted:
Power savings due to lower work indices for copper ores (softer ore)
Confirmation of flow sheet conditions established for copper sulphide ores in the earlier work
Improved confidence in metallurgical response with respect to copper sulphide and
transitional ores resulting in increased copper and silver recoveries
Potential increased throughput in the treatment of transitional ore in the initial stages of
operation
Substantial reduction in sustaining capital requirements.
Grinding
The grinding circuit has been redesigned to treat a wider range of ores including sulphide/
transitional ores and lead-zinc ores. The overall installed power requirement was reduced to
5MW (Sag and Ball mill) from the previous 6MW single stage SAG circuit due to the ore being
softer than previous assumptions.
Flotation
The test work found that the transitional ore can be treated with minor modifications to the
sulphide flotation circuit and the transitional ore can produce a higher grade copper concentrate
than the sulphide ores.
In addition further work confirmed that the same concentrator design can also be used to treat
the copper-lead-zinc ore, to recover the copper separately and, with some minor modifications,
to produce a lead-silver-zinc concentrate.
The encouraging metallurgical outcomes to date point to a more efficient use of capital, reduced
sustaining capital over the life of the mine, and the advantage of utilising proven industry
standard technologies.
Review of Mining Costs
A review of mining and other operating costs was initiated in the PFS optimisation and is in
progress.
However, during the quotation process, it was generally observed that mine establishment costs
and mining operating costs have decreased from 2014 to 2015.
The reduction in the price of fuel will also result in additional savings in mining and transport
costs.
Acquisition of tenements, Yambah, Northern Territory
In April 2015, KGL announced the acquisition of two additional exploration licences in the
Northern Territory for a cash payment of $20,000.
The tenements formed part of Mithril Resources Limited’s Yambah Project located 50km north
of Alice Springs. They were acquired because of the close similarity of the mineralisation style
and host rocks to Jervois. The highly prospective tenements contain a base metal zone and
copper occurrences that have not been fully drill tested.
Surface sampling returned 19% copper, 0.26g/t gold and 25g/t silver (Sample 80337), and
11.85% copper, 34.4g/t silver and 36.8g/t gold (Sample 87112) in surface and rock chip
sampling.
Bashkol (KGL 80%)
Tengri Resources advised that they are withdrawing from the farm in agreement over the
Bashkol license. KGL Resources is looking for alternative investors for this project.
Savo (KGL 70%, GDY 30%)
In the Solomon Islands, our joint venture partner Geodynamics negotiations with the Solomon
Islands Electricity Authority (SIEA), regarding the proposed off-take agreement for the Savo
Island Geothermal Project have been put on hold while the SIEA assesses their needs due to
lower than expected grid demand growth in Honiara and awaits the outcome of the ongoing
World Bank sponsored tender process for the Tina River Hydro Project. Currently
Geodynamics is awaiting the renewal of the prospecting licence for Savo Island and will await
the outcomes of the Tina Hydro tender process before taking any decisions on the projects next
steps.
Corporate
At the end of March 2015, KGL had a cash balance of $7.58m.
Outlook
With all of the planned drilling now nearing completion, assay results will be used in preparing
the updated Resource estimate targeted for completion in July.
Other pre-feasibility study optimisation work during the current and following quarter will
encompass metallurgical testing, current development and operational costs, geotechnical
reviews and open pit and underground mine design. The information will then be used to
prepare a revised financial model for the Jervois project.
An updated pre-feasibility study encompassing the current optimisation work is expected to be
completed in the December quarter.
For further information, contact:
Mr Simon Milroy
Managing Director
Phone: 07 3071 9003
About KGL Resources
KGL Resources Limited is an Australian mineral exploration company focussed on increasing
the high grade resource at the Jervois Copper-Silver-Gold Project in the Northern Territory and
developing it into a multi-metal mine.
JORC Compliance Statement
The Jervois Resources information was first released to the market on 15 September 2014 and complies with JORC 2012. The
company confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market announcement.’
The Jervois Pre-Feasibility Results were first released to the market on 8 December 2014 and complies with JORC 2012. The
company confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed.
The following drill holes were originally reported on the date indicated and using the JORC code specified in the table. Results
reported under JORC 2004 have not been updated to comply with JORC 2012 on the basis that the information has not materially
changed since it was last reported.
Date originally
Reported
Hole
KJC
KJC
KJC
JMET
JMET
JMET
JMET
Sample
Sample
JORC
Reported
Under
111
17/04/2015
2012
112
109
017
019
022
021
80337
87112
17/04/2015
17/04/2015
20/02/2015
20/02/2015
20/02/2015
20/02/2015
22/03/2015
22/03/2015
2012
2012
2012
2012
2012
2012
2004
2004
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
Jervois Project, Northern Territory
100%
ML 30182
Jervois Project, Northern Territory
100%
EL 25429
Jervois Project, Northern Territory
100%
EL 30242
Jervois Project, Northern Territory
100%
AP1602
Bashkol, Kyrgyz Republic
80%
PL 01/12
Savo Island, Solomon Islands
75%
Mining Tenements Acquired
and Disposed during the
quarter.*
NA
Location
Beneficial Holding
Tenements subject to farmin or farm-out agreements
Location
Beneficial Holding
PL-01/12
Savo Island, Solomon Is
75%
Tenements subject to farmin or farm-out agreements
acquired or disposed of
during the quarter
Nil
Location
Beneficial Holding
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.
Name of entity
KGL Resources
ABN
Quarter ended (“current quarter”)
31 Mar 2015
52 082 658 080
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
1.3
1.4
1.5
1.6
1.7
(a)exploration and
evaluation
(b) development
(c) production
(d) administration
(d) office closure
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other – Settlements
Foreign Exchange differences
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a)prospects
(b)equity investments
(c) purchase options
(c) other assets
(d) disposal Costs
Proceeds from sale of:
(a)prospects
(b)equity investments
(c)other fixed assets
Loans to other entities
Loans repaid by other entities
Deed of Company Arrangement (KMWA)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
Current Quarter
$A’000
-
Year to date
(3 months)
$A’000
-
(1,517)
(1,517)
(780)
-
(780)
-
116
-
116
-
(2,181)
(2,181)
(18)
-
(18)
-
-
-
(18)
(18)
(2,199)
(2,199)
+ See chapter 19 for defined terms.
31/03/2015
Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly
1.13
Total operating and investing cash flows
(brought forward)
(2,199)
(2,199)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other
-
-
Net financing cash flows
-
-
Net increase (decrease) in cash held
(2,199)
(2,199)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
9,788
0
9,788
0
1.22
Cash at end of quarter
7,589
7,589
1.14
1.15
1.16
1.17
1.18
1.19
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current Quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
222
1.24
Aggregate amount of loans to the parties included in item 1.10
-
1.25
Explanation necessary for an understanding of the transactions
Remuneration and expenses paid to executive and non-executive directors for the quarter.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on consolidated
assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in which the
reporting entity has an interest
In the quarter Robust withdrew from the farm in agreement on Bashkol
+ See chapter 19 for defined terms.
Appendix 5B Page 2
31/03/2015
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Amount used
$A’000
-
-
-
-
Estimated cash inflow/(outflow) for next quarter
4.1
4.2
4.2
4.3
4.31
4.4
4.5
4.6
$A’000
(1,288)
Exploration and evaluation
Investment/Development
Deed of Company Arrangement
Deposit Interest
Operations Costs
Admin
Asset Disposal
Capex
28
(702)
(10)
(1,972)
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
the related items in the accounts is as follows.
Current Quarter
$A’000
Previous Quarter
$A’000
5.1
Cash on hand and at bank
239
246
5.2
Deposits at call
7,343
9,542
5.3
Bank overdraft
5.4
Other (provide details)
7,582
9,788
Total: cash at end of quarter
+ See chapter 19 for defined terms.
31/03/2015
Appendix 5B Page 3
Appendix 5B
Mining exploration entity quarterly
Changes in interests in mining tenements
Tenement reference
6.1
Interests in
mining tenements
relinquished,
reduced or lapsed
6.2
Interests in
mining tenements
acquired or
increased
Nature of interest
(note (2)
Interest at
beginning
of quarter
Interest at end
of quarter
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
7.2
7.3
7.4
7.5
Total number
Number quoted
141,540,563
141,540,563
1,300,000
1,300,000
Issue price per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
nil
Performance options
exercised.
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through share
consolidation
+Convertible
debt securities
(description)
+ See chapter 19 for defined terms.
Appendix 5B Page 4
31/03/2015
Appendix 5B
Mining exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Issued during
quarter
Exercised during
quarter
Decrease
through
consolidation
Debentures
(totals only)
Unsecured
notes (totals
only)
2,799,842
Unlisted
Options
Exercise price
Expiry date
1,300,000
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards acceptable
to ASX (see note 4).
2
This statement does /does not* (delete one) give a true and fair view of the matters
disclosed.
Sign here:
............................................................ Date: 30/04/2015..............
(Director/Company secretary)
Print name:
...Kylie Anderson......................................................
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash position.
An entity wanting to disclose additional information is encouraged to do so, in a note
or notes attached to this report.
+ See chapter 19 for defined terms.
31/03/2015
Appendix 5B Page 5
Appendix 5B
Mining exploration entity quarterly
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in
mining tenements acquired, exercised or lapsed during the reporting period. If the
entity is involved in a joint venture agreement and there are conditions precedent
which will change its percentage interest in a mining tenement, it should disclose the
change of percentage interest and conditions precedent in the list required for items
6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not required in
items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 1022: Accounting for Extractive
Industries and AASB 1026: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Accounting Standards for foreign entities. If the standards used do not address a topic,
the Australian standard on that topic (if any) must be complied with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6
31/03/2015
Share your feedback
Discover