Resource at Jervois increased and upgraded
High grade silver, lead and zinc assays increase polymetallic value
Mine planning, metallurgical and operating costs reviewed to further
improve economics
Optimised Pre-Feasibility Study due in October
Overview
The Resource at the Jervois Copper-Silver-Gold Project in the Northern Territory was increased
and upgraded during the quarter, and announced in July.
The global resource was increased by 21% to 30.5 million tonnes containing a total of 327,000
tonnes of copper and 22.6 million ounces of silver.
Total indicated resources were increased by 36%, upgrading confidence in the resource for the
critical first few years of mine life.
A 59% increase in contained lead-zinc highlighted the polymetallic nature of Jervois.
The Resource Update followed continuing high grade drill results that increased the total
resource and extended the high grade mineralisation.
The resource drilling, together with geo-technical, metallurgical and operating cost reviews
during the quarter, contributed to the optimised pre-feasibility study which is due to be
completed during October.
The PFS announced last December found Jervois to be a technically viable project with strong
upside potential from additional drilling and metallurgical work.
The Company was motivated to seek to optimise the PFS by the continuing flow of good drill
results pointing to a larger, more valuable asset.
www.kglresources.com.au
Jervois Copper-Silver-Gold Project, Northern Territory (KGL 100%)
Results of reverse circulation and diamond drilling during the quarter continued to extend high
grade mineralisation at Jervois. The successful program has contributed to an increase in the
mineral Resource for both open pit and underground access, the size of the open pit shells
being planned for mining and the new mineralised trends being discovered.
Also adding value to the project’s economics is the polymetallic nature of parts of Jervois
featuring high grade copper, lead, zinc, silver and gold.
Resource Update
In July, the Company announced a Resource Update for Jervois, the highlights of which were:
21% increase in Total Resource to 30.5Mt
36% increase in Indicated Resources to 11.5Mt
17% increase in contained copper to 327,000 tonnes
26% increase in contained silver to 22.6Moz
59% increase in contained lead-zinc to 190,000 tonnes
The gold resource will be updated when gold assays from the 2015 drilling are validated.
The global resource was increased by 21% to 30.5 Mt @ 1.07% copper and 23.0 g/t silver for a
total of 327,000 tonnes of contained copper at a cut off of 0.5% copper and 22.6 million ounces
of contained silver. This includes 10.6 Mt @ 1.37% copper for 146,000 tonnes of contained
copper at Marshall-Reward and 5.4 Mt @ 1.62% copper for 88,000 tonnes of contained copper
at Bellbird at a cut off of 0.75% copper.
Lead-zinc mineralisation was also targeted by the drilling, recent metallurgical test work having
confirmed that good recoveries could be achieved for lead and zinc at Jervois. The lead-zinc
resources increased by 70% from 2.2 Mt to 3.8 Mt with the Green Parrot resource increasing
from 1.1 Mt to 1.9 Mt and the high grade Reward lead-zinc resource increasing by 0.5 Mt.
The Resource Update follows the recent drilling program the latest results of which are
described below. A specific objective of the drilling was to upgrade the resources within the
proposed open pit boundaries to increase confidence in the material to be delivered to the mill in
the early years of operation. This has been successfully achieved with a 36% increase in total
Indicated Resources. Lead-zinc ore in the Indicated classification increased by 0.7Mt to 1Mt
due mostly to infill drilling at the Green Parrot deposit.
A number of mineral occurrences parallel to and along strike from Marshall-Reward were tested,
including Sykes and Johannsen. This near surface mineralisation has the potential to provide
additional low cost, open cut mining material. The drilling program assessed several zones of
shallow mineralisation at other new prospects with similar potential.
www.kglresources.com.au
Exploration Potential
The new Exploration Potential of the larger deposits identified by H&S Consulting consists of
areas peripheral to the current Inferred estimates within the interpreted mineral wireframes,
unconstrained by depth. This is estimated to be a combined total for Marshall-Reward, Bellbird
and Green Parrot of 4 to 8 Mt @ 0.8 to 1.2% copper and 7 to 15g/t silver at a 0.5% copper cut
off (40,000 to 100,000 tonnes copper and 1.5 to 5 Moz silver). The resources are open at depth
and there is additional potential along strike.
The potential quantity and grade of the Exploration Potential is conceptual in nature and there has been insufficient
exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a
Mineral Resource.
Drilling results
The 11,000-metre drilling program at the Bellbird, Marshall-Reward and Green Parrot deposits
that was completed during the quarter targeted potential high grade areas within the proposed
open pits or close to planned underground mine development.
At Green Parrot, drilling intersected two zones of mineralisation that have resulted in a resource
extension and potential deepening of the pit. Particularly encouraging was the increase in gold
grade and more than 200 g/t silver in both intervals at depth. The copper mineralisation remains
open at depth. Results announced during the quarter included:
11m @ 1.93% copper, 2.61% lead, 1.25% zinc, 218.1 g/t silver and 0.25 g/t gold from
153 m (Hole KJC129)
including 4m @ 3.58% copper, 4.61% lead, 1.7% zinc, 393.8 g/t silver and 0.56 g/t gold
from 160m
4m @ 3.44% copper, 2.95% lead, 0.74% zinc, 252.2 g/t silver and 1.76 g/t gold from
177m.
14m @ 1.49% copper, 0.64% lead, 0.3% zinc, 160.5 g/t silver and 0.09 g/t gold from
160m (Hole KJC159)
including 3m @ 3.83% copper, 1.08% lead, 0.17% zinc, 404 g/t silver and 0.2 g/t gold
from 170m.
At Reward, drilling at the Johannsen prospect at the edge of the planned open pit intersected a
zone of supergene enriched copper in a mineralised trend parallel to the main resource. The
close proximity to Reward is likely to have a positive impact on the pit design. Drilling at the
northern end of Reward intersected good mineralisation at depth, adjacent to existing designed
underground development. Results at Johannsen included:
3m @ 4.1% copper, 0.82% lead, 0.3% zinc, 189.2 g/t silver and 0.29 g/t gold from 64m
(Hole GTD004).
The drilling program has also successfully extended the polymetallic mineralisation at MarshallReward which contains several lenses of lead-zinc-copper sulphide within the larger copper
resource. At the northern end of the planned Reward open pit, hole KJC123 intersected 19m
(from 235m) with the consistently high silver grade averaging 104.2 g/t and a one-metre interval
of 22.4% lead.
www.kglresources.com.au
Shallow lead-zinc-silver zones beyond the northern wall of the proposed Marshall-Reward open
pit were confirmed by the recent drilling and are likely to be captured in a new open pit. The
best drill result was:
3m @ 7.76% lead, 10.29% zinc, 86.6 g/t silver from 34m (Hole KJC138).
At Marshall, holes KJC121 and KJC122 intersected broad zones of polymetallic mineralisation.
A high grade zone within KJC122 of 5m @ 6.12% copper, 0.2% lead, 2.42% zinc, 31.4 silver
and 0.48 g/t gold from 263m includes a best copper grade of 14.15%.
At Bellbird, drilling to test surface occurrences at the Bellbird East trend intersected more high
grade copper-lead-zinc mineralisation, with grade appearing to improve with depth. Hole
KJC161 includes 6m @ 1.36% copper, 2.72% lead, 6.92% zinc and 19.3 g/t silver from 65m.
Bellbird East extends for several hundred metres and more drilling is needed to fully evaluate its
potential.
Extending exploration for more mineralised zones at Jervois
Late in the quarter, following the drilling program, KGL commenced a 3D-Induced Polarisation
(3DIP) and Magnetotelluric (MT) survey in the Bellbird region to search for additional zones of
mineralisation in a poorly tested and yet highly prospective zone as indicated by an earlier
survey using different equipment.
There is clearly the prospect of more discoveries at Jervois, and the now completed 3DIP
survey has highlighted the potential for near surface mineralisation in new areas that have not
previously been explored.
In addition to the 3DIP and MT, soil sampling continues over prospective areas and will
ultimately provide systematic coverage of the entire Jervois tenement. Previous sampling
confirmed known mineralisation and identified several new zones such as the Wren prospect
that has narrow, continuous mineralisation for more than 1000 metres.
RAB (rotary air blast) drilling, an economical technique used for shallow depths, is being used to
test prospective areas with a veneer of cover of up to 5m – at the northern extension of the
Bellbird trend, the Little Jay prospect where a copper occurrence has been exposed by
trenching, and the southern extension of Green Parrot that is obscured by alluvium. Geological
mapping of the Jervois project area is well advanced and information from the RAB drilling will
supplement this work. The results of the mapping will be used to further enhance the 3D
geological model for Jervois that was recently developed by the CSIRO.
Metallurgical and operating cost reviews
Geotechnical drilling and studies have shown that the pit walls can be designed approximately 4
degrees steeper than previously assumed. This results in less waste having to be mined to
access a similar amount of ore.
Recent metallurgical test work on the lead-zinc-silver ore has shown that it can be batch
processed through the copper plant to produce a high grade mixed lead-zinc concentrate. This
www.kglresources.com.au
will reduce total project development capital required by eliminating construction of a separate
lead zinc circuit in the third year of operation.
Updated budget pricing was received from open pit and underground mining contractors.
Discussions are taking place with the Central Land Council regarding land access, future
relationships with the local communities and benefits arising from the project including
community development and commitments to local indigenous employment and contracting
opportunities.
Yambah prospects, Northern Territory (KGL 100%)
Preliminary exploration work began on two exploration licences at Yambah, 50km north of Alice
Springs in the Northern Territory. KGL announced in April 2015 that they had been acquired
due to the close similarity of the mineralisation style and host rocks to Jervois.
The highly prospective tenements contain a base metal zone and copper occurrences that have
not been fully drill tested. .
Bashkol (KGL 0%)
KGL has relinquished it’s shareholding in CJSC Kentor at the end of June which was the
Company’s sole remaining asset in the Kyrgyz Republic.
Corporate
On the 22nd May Mr Andrew Daley resigned as Chairman and director of the Company.
Managing Director Simon Milroy, on behalf of the Board, thanked Mr Daley for his
service and his dedication to the advancement of KGL Resources. “Andrew leaves the
company in a strong position with the Jervois project continuing to grow and the
company in a sound financial position. We all wish Andrew the very best for the future.”
Non-executive director, Mr Chris Bain, will act as company Chairman until a decision is
made on Mr Daley’s replacement.
On the 28th July Mr. Denis Wood joined the board as an independent non-executive
director. Denis is a qualified metallurgist and geologist with over 45 years of experience
in the mining industry. Chris Bain, the acting Chairman of the KGL welcomed Denis to
the board saying “Denis’ extensive experience in the development and operation of
significant resource projects along with his background in financing and investment are
a welcome addition to the board.”
At the end of June 2015, KGL had a cash balance of $4.78M.
www.kglresources.com.au
Outlook
An updated pre-feasibility study encompassing the current optimisation work is due to be
completed in October. The study is expected to show further improved economic parameters
as KGL moves towards the development of Jervois as a significant copper, silver and multimetal mine.
Additional exploration drilling will be undertaken to test the targets generated by the recent 3DIP
survey.
For further information, contact:
Mr Simon Milroy
Managing Director
Phone: 07 3071 9003
About KGL Resources
KGL Resources Limited is an Australian mineral exploration company focussed on increasing
the high grade resource at the Jervois Copper-Silver-Gold Project in the Northern Territory and
developing it into a multi-metal mine.
www.kglresources.com.au
JORC Compliance Statement
The Jervois Resources information and Exploration Potential were first released to the market on 29 July 2015 and complies with
JORC 2012. The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcement.’
The Jervois Pre-Feasibility Results were first released to the market on 8 December 2014 and complies with JORC 2012. The
company confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company is in the process of optimising the prefeasibility study, the results of which will be released to the market in October 2015.
The following drill holes were originally reported on the date indicated and using the JORC code specified in the table. Results
reported under JORC 2004 have not been updated to comply with JORC 2012 on the basis that the information has not materially
changed since it was last reported.
Hole
KJC
KJC
GTD
KJC
KJC
KJC
KJC
KJC
129
159
004
123
138
121
122
161
Date originally
Reported
8 May 2015
28 May 2015
8 May 2015
18 May 2015
28 May 2015
18 May 2015
18 May 2015
28 May 2015
JORC
Reported
Under
2012
2012
2012
2012
2012
2012
2012
2012
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
ML 30182
EL 25429
EL 30242
E28340
E28271
PL 01/12
Jervois Project, Northern Territory
Jervois Project, Northern Territory
Jervois Project, Northern Territory
Jervois Project, Northern Territory
Yambah, Northern Territory
Yambah, Northern Territory
Savo Island, Solomon Islands
100%
100%
100%
100%
100%
100%
75%
Mining Tenements Acquired
and Disposed during the
quarter.*
AP1602
Location
Beneficial Holding
Bashkol, Kyrgyz Republic
0%
Tenements subject to farmin or farm-out agreements
PL-01/12
Location
Beneficial Holding
Savo Island, Solomon Is
75%
Tenements subject to farmin or farm-out agreements
acquired or disposed of
during the quarter
Nil
Location
Beneficial Holding
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.
Name of entity
KGL Resources
ABN
Quarter ended (“current quarter”)
30 June 2015
52 082 658 080
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
1.3
1.4
1.5
1.6
1.7
(a)exploration and
evaluation
(b) development
(c) production
(d) administration
(d) Kygyz office closure
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other – Settlements
Foreign Exchange differences
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a)prospects
(b)equity investments
(c) purchase options
(c) other assets
(d) disposal Costs
Proceeds from sale of:
(a)prospects
(b)equity investments
(c)other fixed assets
Loans to other entities
Loans repaid by other entities
Deed of Company Arrangement (KMWA)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
Current Quarter
$A’000
-
Year to date
(6 months)
$A’000
-
(2,259)
(3,776)
(488)
(91)
-
(1,268)
(91)
-
52
-
168
-
(2,786)
(4,967)
(22)
-
(40)
-
-
-
(22)
(40)
(2,808)
(5,007)
+ See chapter 19 for defined terms.
30/06/2015
Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly
1.13
Total operating and investing cash flows
(brought forward)
(2,808)
(5,007)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other
-
-
Net financing cash flows
-
-
Net increase (decrease) in cash held
(2,808)
(5,007)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
7,589
0
9,788
0
1.22
Cash at end of quarter
4,781
4,781
1.14
1.15
1.16
1.17
1.18
1.19
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current Quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
192
1.24
Aggregate amount of loans to the parties included in item 1.10
-
1.25
Explanation necessary for an understanding of the transactions
Remuneration and expenses paid to executive and non-executive directors for the quarter.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on consolidated
assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in which the
reporting entity has an interest
Acquisition of 100% interest in the Yambah tenements from Mithril Resources Ltd
+ See chapter 19 for defined terms.
Appendix 5B Page 2
30/06/2015
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Amount used
$A’000
-
-
-
-
Estimated cash inflow/(outflow) for next quarter
4.1
4.2
4.2
4.3
4.31
4.4
4.5
4.6
$A’000
(943)
Exploration and evaluation
Investment/Development
Deed of Company Arrangement
Deposit Interest
Operations Costs
Admin
Asset Disposal
Capex
24
(427)
(10)
(1,356)
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
the related items in the accounts is as follows.
Current Quarter
$A’000
Previous Quarter
$A’000
5.1
Cash on hand and at bank
244
239
5.2
Deposits at call
4,537
7,343
5.3
Bank overdraft
5.4
Other (provide details)
4,781
7,582
Total: cash at end of quarter
+ See chapter 19 for defined terms.
30/06/2015
Appendix 5B Page 3
Appendix 5B
Mining exploration entity quarterly
Changes in interests in mining tenements
Tenement reference
6.1
6.2
Interests in
mining tenements
relinquished,
reduced or lapsed
Interests in
mining tenements
acquired or
increased
Bashkol, Kyrgyz
Republic AP1602
EL28340, EL28271
Nature of interest
(note (2)
Equity
Interest at
beginning
of quarter
Interest at end
of quarter
80%
0%
0%
100%
interest through
CJSC Kentor
Acquired 100% interest
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
7.2
7.3
7.4
7.5
Total number
Number quoted
141,540,563
141,540,563
Issue price per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through share
consolidation
+Convertible
debt securities
(description)
+ See chapter 19 for defined terms.
Appendix 5B Page 4
30/06/2015
Appendix 5B
Mining exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
2,799,842
Unlisted
Options
Exercise price
Expiry date
Issued during
quarter
Exercised during
quarter
Decrease
through
consolidation
Debentures
(totals only)
Unsecured
notes (totals
only)
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards acceptable
to ASX (see note 4).
2
This statement does /does not* (delete one) give a true and fair view of the matters
disclosed.
Sign here:
............................................................ Date: 31/07/2015..............
(Director/Company secretary)
Print name:
...Kylie Anderson......................................................
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash position.
An entity wanting to disclose additional information is encouraged to do so, in a note
or notes attached to this report.
+ See chapter 19 for defined terms.
30/06/2015
Appendix 5B Page 5
Appendix 5B
Mining exploration entity quarterly
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in
mining tenements acquired, exercised or lapsed during the reporting period. If the
entity is involved in a joint venture agreement and there are conditions precedent
which will change its percentage interest in a mining tenement, it should disclose the
change of percentage interest and conditions precedent in the list required for items
6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not required in
items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 1022: Accounting for Extractive
Industries and AASB 1026: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Accounting Standards for foreign entities. If the standards used do not address a topic,
the Australian standard on that topic (if any) must be complied with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6
30/06/2015
Share your feedback
Discover