Increase in JORC Measured Resource for Jervois Project
Released
Released
Announcement PDF
Increase in JORC Measured Resource for
Jervois Project
23 May 2024
Updated Reward Resource
• Reward Mineral Resource Estimate (MRE) for both the Open-cut and Underground
updated:
o 13.16 Mt at 1.79% Cu, 34 g/t Ag and 0.33 g/t Au for 234.9 kt of copper metal and
14.5 Moz of silver and 139.9 koz of gold.
o Includes maiden measured resource in the opencut area of 2.63Mt at 1.91% Cu,
46.2g/t Ag and 0.43g/t Au for 50.3kt of Cu metal, 3.91Moz Ag and 36koz Au
Measured Resources at Jervois
• The updated JORC MRE achieves a key milestone with the resource in the measured
category covering the initial years of planned production, which will assist financing.
• The updated Reward resource, combined with the Bellbird resource, gives JORC
Measured Resource within two planned open pits at Jervois Project
67% Measured
32% Indicated
1% Inferred
Next Steps
• The Rockface resource is the next scheduled for update following completion of infill
drilling and analysis.
• KGL is proposing to release an updated Feasibility Study by end Q3/ beginning Q4 2024.
Part of the program of works to achieve that goal includes updating mine plans based on
the updated resources and the proposed increase in processing capacity to 2.0Mtpa.
• The drilling program in 2024 will also focus on potential resource extensions at Rockface
shallow to intermediate depths, Rockface Deeps and Reward Deeps.
KGL Resources (ASX:KGL) is pleased to announce an update to the mineral resource estimate (MRE) for the
Reward Deposit. The improved confidence in the Reward estimate combined with the Bellbird estimate 1 brings
the initial years of open pit production 2 into the Measured Category which will assist with financing.
KGL’s CEO Kylie Anderson commented:
“We completed the RC infill drilling, assaying, and resource estimation program at Reward in 2023/24,
the aim of which was to improve the confidence in the Resource. The outcome is that there is now a
contained copper resource at Reward in the measured category. This is an excellent outcome for the
project and is also significant as mining in the current mine plan integrates open cut mining at both
Bellbird and Reward simultaneously optimising mill feed to the plant.”
1
2
Bellbird Deposit Mineral Resource Update (ASX:KGL 17/09/2022)
Based on a 2Mtpa Processing Plant
Increase in JORC Measured Resource for
Jervois Project
Results
The reported mineral resource aligns with the company’s objective of having measured resources defined for the
initial years of the production.
Figure 1 shows the planned pit shell with the updated Reward Mineral Resource, a significant proportion has
been classified as measured. Figure 2 shows Bellbird pit shell relative to the measured resource.
NB. Mineral Resources are not Ore Reserves and do not have demonstrated economic viability
Figure 1.Longitudinal projection of the Reward Open Pit showing proportion of measured resources.
Figure 2.Longitudinal projection of the Bellbird Open Pit showing proportion of measured resources.
The infill drilling has resulted in a reduction of inferred copper tonnes and an increase in measured copper tonnes.
While it would be reasonable to expect that the majority of Inferred Mineral Resources would upgrade with
continued exploration, due to the uncertainty of Inferred Mineral Resources, it should not be assumed that such
upgrading will always occur. Confidence in the estimate of Inferred Mineral Resources is not sufficient to allow
the results of the application of technical and economic parameters to be used for detailed planning in a Feasibility
study, and for this reason drilling will focus on converting inferred resources in the mine plan.
Increase in JORC Measured Resource for
Jervois Project
While the total MRE at Reward remains about the same as the 2022 MRE, the focus of the drilling program in
2023 was primarily to increase confidence in the resource within the proposed open pit design to support the
increase in design processing capacity to 2 Mtpa. The Measured Resource at Reward and Bellbird now
represents approximately 67% of the total MRE within the proposed open pit designs.
Recent infill drilling within the planned Reward open pit design also confirmed shallow intersections of high-grade
copper and silver as well as deeper intersections with thick zones of strong copper with higher grade cores
supporting a positive impact on the Project’s economics.
Bellbird Copper
Reward Copper
150
100
50
0
171
92
79
2018
1.52%
1.79%
244
235
73
63
203
158
2.0%
1.8%
1.6%
1.4%
1.2%
1.0%
0.8%
0.6%
0.4%
0.2%
0.0%
59
37
144
121
122
171
50
2019
2020
2022
Indicated
Measured
2024
Inferred
129
2.30%
120
105
100
80
103
99
1.93%
59.0
50.3
71.8
26.0
40
0
2018
Cu Grade (%)
Measured
2019
54.4
52.8
50.6
50.4
20
2.00
1.50
47.9
54.4
2.50
1.97%
1.32%
1.31%
60
113
Copper Grade (%)
200
1.42%
1.80%
Copper Metal (kt)
Copper Metal (kt)
250
1.80%
Copper Grade (%)
300
Indicated
2020
1.00
0.50
31.2
2022 Jan
2022 Aug
Cu Grade (%)
Inferred
0.00
Figure 3. Showing the progression of Reward copper mineral resource estimates from 2018 until the current estimate 2024. The 2024
estimate shows a decrease in the less confident inferred category.
Both gold and silver have marginally increased from the 2022 to the 2024 estimate, Figure 4 shows the
progression of the silver metal content and grade since 2018, similarly for gold estimates, Figure 5.
14
13
13
3
33 g/t
3
3
10
34 g/t
14
2
2018
8
30
25
15
10
5
2019
Measured
11
10
8
35
20
2
9
40
2020
2022
Inferred
Indicated
2024
0
Bellbird Silver
3.50
12.1 g/t
3.00
9.7 g/t
2.50
2.3
2.15
2.24
1.30
1.17
1.17
1.00
0.98
1.07
2019
2020
2022 Jan
2022 Aug
Indicated
Inferred
Ag Grade g/t
1.00
1.47
0.58
0.50
0.00
Ag Grade (g/t)
Measured
14.0
12.0
2.64
2.00
1.50
12.3 g/t
0.60
10.0
8.0
6.0
Ag Grade g/t
31 g/t
35 g/t
30 g/t
Silver Metal (Million Troy Ounces)
20
18
16
14
12
10
8
6
4
2
-
15.0 g/t
4.00
Silver grade (g/t)
Silver Metal (Moz (Troy))
Reward Silver
4.0
2.0
0.0
Figure 4. Showing the progression of Reward silver mineral resource estimate from 2018 to current 2024 estimate.
0.33 g/t
0.29 g/t
118
100
27
112
23
0.31 g/t
130
137
22
29
0.33 g/t
140
25
0
91
2018
Measured
108
89
2019
2020
Indicated
0.3
0.2
79
50
0.4
108
2022
Inferred
0.1
2024
Au Grade (g/t)
0.0
Gold Metal (koz - Troy)
150
0.36 g/t
Gold Grade (g/t)
Gold Metal (koz -Troy)
200
Bellbird Gold
0.15 g/t
40
30
0.14 g/t
0.12 g/t
28.0
25.0
21.7
20
28.0
9.1
12.9
10
0
0.16
0.13 g/t
0.14
27.5
0.12
0.10
13.7
0.06
8.3
11.8
12.2
2019
2020
2022 Jan
2022 Aug
Measured
Indicated
Inferred
Au Grade g/t
Figure 5. Showing the progression of Reward gold mineral resource estimate from 2018 to current 2024 estimate.
0.08
5.6
0.04
0.02
0.00
Au Grade (g/t)
Reward Gold
Increase in JORC Measured Resource for
Jervois Project
Next Steps
Update to Feasibility Study
KGL is now consolidating the studies which were aimed at improving key value drivers and financing options for
the project. KGL is proposing to release an updated Feasibility Study by the end Q3/ beginning Q4 2024.
Part of the program of works to achieve that goal includes updating Mine Plans based on the updated resources,
and on the increase in processing capacity to 2.0 Mtpa.
Drilling Program
The priorities for the drilling program in 2024 include:
•
•
•
•
Update the Rockface MRE
o Most of the planned infill drilling at Rockface has been completed, with assays underway. The
primary objective is to increase confidence in the resource by upgrading inferred to indicated
status. This information will be the basis for an update to the Rockface resource model.
Update the Reward Underground
o The primary objective is for infill drilling of the Reward underground resource and increase
confidence in the resource by upgrading inferred to indicated status
Targeted Resource Extensions:
o Rockface shallow to intermediate depths
o Rockface Deeps extension
o Reward Deeps extension
Review other open cut resource opportunities based on previous drilling programs
Copper Market
Growing the high-grade copper resource and mine life at Jervois continues to be a key value driver for KGL.
Surging demand for copper – driven by the clean energy transition and demand from modern technologies
including semiconductors and the digital economy (data centres & AI industry), together with supply challenges,
low inventories and a lack of investment in exploration and new mine projects has analysts forecasting a chronic
shortfall in copper over the next decade commencing in 2024.
Increase in JORC Measured Resource for
Jervois Project
Reward Resource Update
The mineral resource estimate was completed by experienced and independent consultants, Mining Associates
Pty Ltd, and their summary report is included as part of the announcement. The mineral resource estimate
incorporating the results from drilling during 2023 and all previous validated data. The mineral resource estimate
is reported according to the JORC (2012) guidelines.
Table 1. 2024 Reward Resource Summary
Resource
Area
Mineralised
Category
Grade
Metal
Mt
Copper
Silver Gold
Copper Silver
Gold
(%)
(g/t)
(g/t)
(kt)
(Moz)
(koz)
Open Cut Potential
Measured 2.63
1.91
46
0.43
50.3
3.91
36.0
>0.5 % Cu
Indicated
0.92
1.61
43
0.26
14.8
1.28
7.7
Inferred
0.68
0.94
11
0.07
6.4
0.23
1.4
Sub Total (< 200 mRL)
4.23
1.69
40
0.33
71.5
5.42
45.1
Underground
Indicated
5.26
2.04
41
0.42
107.3
6.90
70.8
Potential > 1% Cu
Inferred
3.67
1.53
19
0.20
56.1
2.19
23.9
Sub Total (> 200 mRL)
8.92
1.83
32
0.33
163.4
9.10
94.7
Subtotal
Measured 2.63
1.91
46
0.43
50.3
3.91
36.0
Indicated
6.18
1.98
41
0.40
122.1
8.17
78.5
Inferred
4.35
1.44
17
0.18
62.5
2.43
25.4
Total
13.16
1.79
34
0.33
234.9
14.5
139.9
* Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric
tonnes.
Mineral Resources are not Ore Reserves and do not have demonstrated economic viability.
Inferred resource have less geological confidence than Indicated resources and should not have modifying factors
applied to them. It is reasonable to expect that with further exploration most of the inferred resources could be
upgraded to indicated resources.
Increase in JORC Measured Resource for
Jervois Project
Of the 5.62 Mt contained in the two planned open pits at the Jervois Project, 3.79 Mt @ 2.10% Cu for 79.5 Kt of
Cu metal is classified as measured, corresponding to 67% of the tonnes and 70% of the contained metal.
Table 2. Reward and Bellbird Resource, pit constrained at a 0.5 % Cu.
Resource
Proportion
of Tonnes
Tonnes
(Mt)
Pb
(%)
0.29
Zn
(%)
0.23
Au
(g/t)
0.34
Ag
(g/t)
36
Cu
Metal (t)
Metal
Proportion
3.79
Cu
(%)
2.10
Measured
67%
79,500
70%
Indicated
32%
1.78
1.80
0.34
0.40
0.28
46
31,900
28%
Inferred
1%
0.05
1.32
0.33
0.32
0.16
28
700
1%
5.62
2.06
0.31
0.41
0.36
35
113,000
Total
The current total resource for the Jervois Project is 23.37Mt at 2.02% Cu, 26.0 g/t Ag, and 0.26 g/t Au for 472.2 kt
of copper, 19.5 Moz of silver and 192.8 koz of gold. reported in May (2024) at a 0.5% Cu cut off within
approximately 150 m of the surface and above 1% Cu below 150 m (below 200 mRL).
Table 3. Current Mineral Resources for the Jervois Project.
Resource
Open Cut
Potential
> 0.5 % Cu
Area
Reward
Bellbird
Material
Category
Measured
Indicated
Inferred
Measured
Indicated
Inferred
Sub Total
Underground Reward Indicated
Potential
Inferred
> 1 % Cu
Bellbird
Indicated
Inferred
Rockface Indicated
Inferred
Sub Total
Total
Mt
2.63
0.92
0.68
1.23
1.26
1.02
7.74
5.3
3.7
0.33
2.84
2.80
0.73
15.62
23.37
Grade
Metal
Copper Silver
Gold Copper Silver Gold
(%)
(g/t)
(g/t)
(kt)
(Moz) (koz)
1.91
46.20
0.43 50.30
3.91
36.0
1.61
43.20
0.26 14.81
1.28
7.7
0.94
10.70
0.07
6.41
0.23
1.4
2.53
15.1
0.14 31.18
0.6
5.6
1.45
9.1
0.17 18.23
0.37
6.8
1.24
10.6
0.12 12.67
0.35
4.0
1.72
27.1
0.25 133.6
6.7
61.5
2.0
40.8
0.4 107.3
6.9
70.8
1.5
18.6
0.2
56.1
2.2
23.9
2.33
19.8
0.14
7.78
0.21
1.5
2.09
12.3
0.11 59.15
1.12
9.7
3.37
21.4
0.23 94.31
1.93
21.1
1.92
19
0.18 13.97
0.45
4.2
2.17
25.5
0.26 338.6
12.8 131.3
2.02
26.0
0.26 472.2
19.5 192.8
This announcement has been approved by the directors of KGL Resources Limited.
Increase in JORC Measured Resource for
Jervois Project
Competent Person Statement
The information in this announcement that relates to Reward Mineral Resource Estimates is based on data
compiled by Ian Taylor BSc(Hons), a Competent Person who is a Fellow of The Australasian Institute of Mining
and Metallurgy. Mr Taylor is an independent consultant working for Mining Associates. Mr Taylor has sufficient
experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity, which is being undertaking to qualify as a Competent Person as defined in the 2012 Edition of
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Taylor
consents to the inclusion in the announcement of the matters based on his information in the form and context in
which it appears.
The Bellbird Resource information was first released to the market on 17/09/2022 and complies with JORC 2012.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
The Rockface Resource information was first released to the market on 07/03/2022 and complies with JORC
2012. The company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
Forward Looking statements
This release includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”,
“project”, “opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward
looking statements. All statements, other than statements of historical fact, included herein, including without
limitation, statements regarding forecast cash flows and potential mineralisation, resources and reserves,
exploration results and future expansion plans and development objectives of KGL are forward-looking statements
that involve various risks and uncertainties. Although every effort has been made to verify such forward-looking
statements, there can be no assurance that such statements will prove to be accurate and actual results and
future events could differ materially from those anticipated in such statements. You should therefore not place
undue reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements. Statements in relation to future matters can only be made where the Company has a reasonable
basis for making those statements.
Mineral Resource Estimate for Reward Deposit, Jervois Project, NT
SUMMARY
The Reward Deposit is the largest of the deposits identified within KGL’s Jervois Project. The Jervois Project is
located in the Northern Territory, 275 km ENE of Alice Springs. (22.65°S and 136.27°E). The Exploration Licence
and four Mining Claims are 100% owned by KGL subsidiary Jinka Minerals Ltd.
Mining Associates Pty Ltd (“MA”) was commissioned by KGL Resources. (“KGL”, or the “Company”), a mineral
exploration and development company currently listed on the Australian Stock Exchange (“ASX”), to prepare a
Mineral Resource Estimate (“MRE”) and Technical Report on the Reward Deposit.
Based on the reported study, delineated mineralization of the Reward Deposit is classified as Measured, Indicated
and Inferred Mineral Resource according to the definitions outlined in JORC (2012). Confidence and classification
regarding the grade estimates are based on several factors, including but not limited to sample and drill spacing
relative to geological and geostatistical observations, the continuity of mineralization, mining history, bulk density
determinations, accuracy of drill collar locations, quality of the assay data, and other estimation statistics.
The resource is reported above a depth of 200 m RL and a 0.5% copper cut off and below 200 m RL at a 1%
copper cut off (200 m RL is approximately 150 m below the surface).
Resource
Area
Category
Open Cut Potential
>0.5 % Cu
Measured
Indicated
Inferred
Sub Total (< 200 mRL)
Underground Potential
> 1% Cu
Sub Total (> 200 mRL)
Subtotal
Total
Indicated
Inferred
Measured
Indicated
Inferred
Mineralised
Grade
Mt
Copper
(%)
1.91
1.61
0.94
1.69
2.04
1.53
1.83
1.91
1.98
1.44
1.79
2.63
0.92
0.68
4.23
5.26
3.67
8.92
2.63
6.18
4.35
13.16
Metal
Silver
(g/t)
46.2
43.2
10.7
39.8
40.8
18.6
31.7
46.2
41.2
17.4
34.3
Gold
(g/t)
0.43
0.26
0.07
0.33
0.42
0.20
0.33
0.43
0.40
0.18
0.33
Copper
(kt)
50.3
14.8
6.4
71.5
107.3
56.1
163.4
50.3
122.1
62.5
234.9
Silver
(Moz)
3.91
1.28
0.23
5.42
6.90
2.19
9.10
3.91
8.17
2.43
14.5
Gold
(koz)
36.0
7.7
1.4
45.1
70.8
23.9
94.7
36.0
78.5
25.4
139.9
* Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
Mineral Resources are not Ore Reserves and do not have demonstrated economic viability.
Inferred resource have less geological confidence than Indicated resources and should not have modifying factors
applied to them. It is reasonable to expect that with further exploration most of the inferred resources could be
upgraded to indicated resources.
KGL is considering different processing and or differing recoveries based how weathered or how preserved the
sulphide minerals are and which deleterious elements may be present. Table 4 shows the deposits reported by
weathering profiles, including the High Sulphur resource (S/Cu > 4.5).
Table 4. Reward Resource reported by weathering.
Resource
Material Grade
Metal
Category weathering (Mt)
Cu % Pb % Zn % Ag g/t Au g/t S % Cu kt Pb kt Zn kt Ag Moz Au Koz
Measured Oxide
0.14 1.89 1.04 0.43 57.6 0.45 0.4
2.7
1.5
0.6
0.26
2.05
Transitional
0.16 2.44 0.95 0.39 66.3 0.46 1.2
3.8
1.5
0.6
0.33
2.35
High Sulfur
0.02 0.71 0.80 0.41 43.3 0.33 4.2
0.1
0.1
0.1
0.02
0.17
Fresh
2.32 1.88 0.35 0.32 44.1 0.42 1.8 43.7
8.0
7.4
3.29 31.39
Indicated Oxide
0.08 2.01 0.39 0.25 39.1 0.43 0.2
1.5
0.3
0.2
0.09
1.03
Transitional
0.10 1.74 0.61 0.32 41.2 0.23 0.6
1.7
0.6
0.3
0.13
0.72
High Sulfur
0.22 1.30 0.40 0.25 26.8 0.21 7.7
2.8
0.9
0.5
0.19
1.43
Fresh
5.79 2.01 0.50 0.41 41.8 0.40 2.2 116.1 29.2 23.5
7.78 75.36
Inferred
Oxide
0.01 0.97 0.06 0.15 10.4 0.05 0.0 0.05 0.003 0.007
0.00 0.008
Transitional
0.03 0.98 0.07 0.15 11.9 0.05 0.1 0.29 0.02 0.05
0.01 0.045
High Sulfur
0.12 0.88 0.07 0.07 10.4 0.07 5.2 1.07 0.08 0.09
0.04
0.28
Fresh
4.19 1.46 0.26 0.21 17.6 0.19 1.4 61.1 11.0
8.9
2.38 24.97
Subtotal Oxide
0.22 1.91 0.80 0.36 50.3 0.43 0.3
4.2
1.8
0.8
0.36
3.09
Transitional
0.28 2.05 0.74 0.34 52.1 0.34 0.9
5.8
2.1
1.0
0.47
3.11
High Sulfur
0.35 1.13 0.30 0.19 21.9 0.17 6.7
4.0
1.1
0.7
0.25
1.88
Fresh
12.30 1.80 0.39 0.32 34.0 0.33 1.9 220.9 48.2 39.8 13.44 131.7
Total
13.16 1.79 0.40 0.32 34.3 0.33 1.9 234.9 53.2 42.3 14.52 139.9
Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
Geology and geology interpretation
Reward is interpreted as an original syn-depositional copper-rich polymetallic massive sulphide deposit that has
undergone deformation, metamorphism and some degree of structural remobilisation. Recent modelling of
mineralisation by KGL geologists strongly supports the interpretation of a lower, broadly stratabound zone,
overprinted by higher grade ‘shoots’ that represent structural remobilisation into fold hinges and breccia style
structures.
Interpretation of higher-grade zones is based primarily on geological logging supported by abrupt changes in
copper and/or silver grades. High grade structural shoots are characterised by coarser grained sulphides and
magnetite sulphide breccia. The lower grade stratabound halo was defined as greater than 0.5% sulphur. Intervals
encompassing high grade shoots and stratabound mineralisation were modelled using Leapfrog software with an
anisotropic component conforming to the plunge of measured F2 fold hinges.
Reward domains were created primarily based on structural shoots orientation (Figure 6), weathering and grade.
Cross sections of the interpreted implicit models for Marshall shoot and Deeps South are shown in Figure 7 and
Figure 8.
Figure 6. Long Section View showing wireframe domains
Figure 7. Marshall Lode Cross Section
(7494525 mN ± 12.5m)
Figure 8. Deeps South and East Lodes, Cross Section (7495350 mN ± 12.5m)
Drilling Techniques
Resource definition drilling over the life of the project has been undertaken on 50 m spaced cross sections
perpendicular to strike with holes spaced on average 50 m (50 x 50m grid). The higher grade shoots and shallower
mineralisation (above 200m RL) has been infilled to approximately 25 x 50 m. Of the 598 holes (125 km of drilling)
on the deposit, 70 holes (historical) have been rejected, deemed unreliable either in survey or have missing data.
The total number of validated holes at Reward is 528 holes for 120 km of drilling.
KGL drilling since 2011 mostly utilised a combination of RC pre-collars (5.25” face sampling bit) to a predetermined depth above predicted mineralisation followed by diamond coring (wireline with dominantly HQ3
(63 mm) diameter with some NQ3 (45 mm) diameter). Pre-2011 hole diameter and drill type details are generally
not recorded (NR) in the database. A total of 163 holes in the drill hole database have bee judged as unreliable
based on limited down hole surveys, spurious drill collars or down hole intervals not agreeing with newer drilling.
Table 5 summarises drilling statistics by drill hole type. RC_DD drill holes utilised RC pre-collars with diamond
coring through zones of mineralisation, and DDW denotes diamond drilling wedges, or child holes drilled from a
pre-existing hole path by directional drilling methods.
Table 5 Summary of drilling by drill hole type
Project
Reward
Total
Hole type
DD
DHW
RC
RC_DD
UNK
Count
152
15
247
145
42
601
Total meters
40,856.3
9,010.4
26,616.3
62,284.5
6,227.1
144,995
Sampling and Sub-Sampling Techniques
Sampling was continuous through mineralisation/alteration zones and extended up to 10 m for diamond core and
up to 50 m for RC up and down-hole. HQ drill core since 2021 is quarter core sampled and NQ drill core has been
half core sampled. The 2020-2021 sampling program was all quarter sawn diamond core, earlier sampling
included quarter core and riffle split RC samples.
QAQC
KGL submits field duplicates, Certified Reference Material and blanks as part of the QAQC procedures.
10,116 samples were submitted in 2023 of which 175 were duplicates, 213 base metal CRM’s and 107 gold
CRM’s and 181 blanks. This equates to 16% of all assays are a form of QAQC sample, common practice within
the industry is 5% of all samples are a form of QAQC sample.
Field duplicates performed as expected, with few outliers. The CRMs performed well, with few copper fails (5),
lead was more erratic with 9 fails and no gold CRM’s failed and 3 silver standards failed.
During the 18 months since the last report the Alice Preparation Laboratory has ceased operation and KGL
samples are trucked to Darwin for processing. As before samples are assayed at the Townsville Laboratory. The
move to Darwin Preparation laboratory has seen a marked increase in the number of blank fails, 17% of blanks
sent to Darwin failed. No blanks failed while sample preparation was undertaken at Alice Springs. The Townsville
laboratory performed repeat assays confirming the issue is in the sample preparation stage..
Sample Analysis
Since mid-2015 KGL has sent all samples to Intertek laboratories in Alice Springs for sample preparation, from
where they were forwarded to Intertek in Townsville for analysis. Earlier 2011 to 2015 samples were sent to ALS
Global in Townsville. Intertek and ALS analysis used a 4-acid digest with ICP-OES finish. Over-grade (> 2 % Cu)
samples were re-analysed by 4-acid digest and ICP-OES finish on a larger initial sample and longer digest time.
KGL QAQC protocols are designed to establish measurement systems and procedures to provide adequate
confidence that quality is adhered to, and results are suitable for inclusion in Resource Estimation.
Estimation Methodology
The Mineral Resource statement reported herein is a reasonable representation of the Reward deposit based on
current sampling data. Grade estimation was undertaken using Geovia’s Surpac™ software package (v7.7).
Ordinary Kriging (“OK”) was selected for grade estimation of copper, silver and gold (and the ancillary elements).
Copper is the primary economic element, silver, gold, lead, zinc, are estimated using the copper domains as hard
boundaries and utilising dynamic search ellipses. Deleterious elements U W Bi and F are estimated within the
sulphur domain (a soft boundary across the copper domains). Iron and Sulphur are estimated inside the sulphur
domain using dynamic search ellipses. Iron and Sulphur are estimated into the country rock to aid waste rock
classification. Only Main shoot and Marshall have sufficient oxidised samples to enable the weathering profile to
be used as an additional hard boundary.
The block model utilises parent blocks measuring 2.5 m x 10 m x 5 m with sub -blocking to 1.25 m x 5 m x 2.5 m
to better define the volumes. Blocks above topography are excluded from the estimation. Estimation resolution
was set at the parent block size. Due to the reasonably spaced drill patterns, search radii were found to be optimal
near 70 m for the major axis of the search ellipse. Anisotropic ratios of 1.5 and 2.5 were applied to the semi-major
and minor axis of the search ellipse. The minimum and maximum samples utilised were 8 and 20 for the first pass
and reduced to 6 and 15 for the second pass. Third pass informing samples were further reduced to a minimum
of 2 and maximum of 10. Search distances were factored by the estimation pass. Grade capping was applied to
all elements except Fe and S. Experimental variograms were generated where possible. Domains and elements
where experimental variograms could not be created, variogram models were borrowed from similar domains or
elements (with weak to moderate corelations to the element under investigation).
The default density of the block model is 2.80 t/m3. All oxide material is assigned 2.6 t/m3. The mineralised
transitional material is assigned 3.0 t/m3 and the transitional waste is assigned a density of 2.8 t/m3. Density
values were further improved with a 2-pass estimation strategy. Pass one used measured density readings (n =
13,577, average 3.01, Variance 0.1 and CV 0.105) to estimate the block density, the second pass used density
values determined from a linear regression of iron assays. The mineral resource averages 3.08 t/m3.
Block model validation consisted of visual checks in plan and section, global comparisons between input and
output means, alternative estimation techniques, swath plots and to previous estimates.
Cut-Off Grades
Cut off grades of 0.5% Cu above 200 m RL and 1% Cu below 200 m RL; 200 m RL is approximately 150 m
below the surface and is considered to the depth limit for potential open pit mining. KGL are considering the
optimal transition depth for the change over from open pit to underground in the previous FS (ASX:KGL,
10.11.22).
Classified resources (combined indicated and inferred) as defined above are presented at increasing copper cut
offs highlighting the deportment of associated elements (Table 6). Figure 9 shows the resource as grade
tonnage curves by resource category.
Table 6. Deportment of associated elements with copper mineralization
Resource
Material Grade
Metal
Category weathering (Mt)
Cu % Pb % Zn % Ag g/t Au g/t Fe % S % Bi % F % Cu kt Pb kt Zn kt Ag Moz Au Koz
Measured
Indicated
Inferred
Subtotal
Total
Oxide
Transitional
High Sulphur
Fresh
Oxide
Transitional
High Sulphur
Fresh
Oxide
Transitional
High Sulphur
Fresh
Oxide
Transitional
High Sulphur
Fresh
0.14
0.16
0.02
2.32
0.08
0.10
0.22
5.79
0.01
0.03
0.12
4.19
0.22
0.28
0.35
12.30
13.16
1.89
2.44
0.71
1.88
2.01
1.74
1.30
2.01
0.97
0.98
0.88
1.46
1.91
2.05
1.13
1.80
1.79
1.04
0.95
0.80
0.35
0.39
0.61
0.40
0.50
0.06
0.07
0.07
0.26
0.80
0.74
0.30
0.39
0.40
0.43
0.39
0.41
0.32
0.25
0.32
0.25
0.41
0.15
0.15
0.07
0.21
0.36
0.34
0.19
0.32
0.32
57.6
66.3
43.3
44.1
39.1
41.2
26.8
41.8
10.4
11.9
10.4
17.6
50.3
52.1
21.9
34.0
34.3
0.45
0.46
0.33
0.42
0.43
0.23
0.21
0.40
0.05
0.05
0.07
0.19
0.43
0.34
0.17
0.33
0.33
16.3
14.2
15.8
15.5
12.5
9.2
17.5
17.3
7.3
7.4
20.4
16.4
14.8
11.8
18.4
16.6
16.6
0.4
1.2
4.2
1.8
0.2
0.6
7.7
2.2
0.0
0.1
5.2
1.4
0.3
0.9
6.7
1.9
1.9
0.04 0.37
2.7
1.5
0.6
0.04 0.39
3.8
1.5
0.6
0.05 0.57
0.1
0.1
0.1
0.04 0.49 43.7
8.0
7.4
0.02 0.29
1.5
0.3
0.2
0.01 0.22
1.7
0.6
0.3
0.07 0.15
2.8
0.9
0.5
0.03 0.35 116.1 29.2 23.5
0.00 0.07 0.05 0.003 0.007
0.00 0.07 0.29 0.02 0.05
0.04 0.10 1.07 0.08 0.09
0.01 0.21 61.1 11.0
8.9
0.03 0.34
4.2
1.8
0.8
0.03 0.30
5.8
2.1
1.0
0.06 0.16
4.0
1.1
0.7
0.03 0.33 220.9 48.2
Share your feedback
Discover