Half Yearly Report and Accounts
Released
Released
Announcement PDF
RESOURCES
KGL RESOURCES LIMITED
AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
FINANCIAL STATEMENTS FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
CONTENTS
DIRECTORS' REPORT
AUDITOR'S INDEPENDENCE DECLARATION
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR Loss AND
OTHER COMPREHENSIVE INCOME
CONDENSED CONSOLIDATED BALANCE SHEET
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
DIRECTORS' DECLARATION
INDEPENDENT AUDITOR'S REVIEW REPORT
PAGE
1
14
15
16
17
18
19
24
25
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS' REPORT
The directors of KGL Resources Limited present their report on the consolidated entity consisting of KGL
Resources Limited (KGL, Company) and the entities it controlled for the half-year ended 31 December
2025 (Group).
DIRECTORS
The names of the directors who held office during the half-year and up to the date of this report were:
DIRECTOR POSITION HELD
Mr J. Gerard Chairman
Mr F. Purnamasidi Non-executive director
Mr B. Gell Independent non-executive director
Ms L. Deguara Independent non-executive director - Appointed 28 November 2025
PRINCIPAL ACTIVITY
The principal continuing activity of the Group during the half-year period was the exploration and
development of the Jervois Project (Project) in the Northern Territory.
REVIEW OF OPERATIONS
OVERVIEW
During the half-year to 31 December 2025, the Company continued to advance the Jervois Project (Project),
with its primary focus on progressing major work programs to support construction readiness and funding
discussions with a short list of potential funding partners. The Company's objective remains to achieve a
Final Investment Decision (FID), close project financing and commence construction during 2026.
Funding discussions have progressed constructively during the period and are taking place against a
backdrop of strengthening medium to long-term fundamentals for copper, silver and gold. Structural
demand growth driven by electrification, decarbonisation, Al infrastructure, energy transition technologies
and constrained global supply continues to support a favourable commodity outlook.
The Company believes this supportive macroeconomic environment, combined with the Project's scale,
grade profile and advanced permitting status, has resulted in encouraging engagement from potential
funding partners.
During the period, the Company also successfully completed a capital raising, strengthening the balance
sheet and enabling continued advancement of technical, commercial and financing workstreams required
to support FID.
Major activities and progress during the period include the following:
• Advancement of enabling works, including contract progression, procurement activities and integration
of experienced execution partners to optimise the project delivery schedule;
• Ongoing optimisation studies in response to higher metal prices, including incremental open-cut
resource development within the current mine life and improvements to process plant performance and
metal recovery;
• Completion of integrated 3D inversion modelling for advancement of the medium-term exploration
program aimed at unlocking additional value across the prospective Jervois-Unca Creek tenements;
• Engagement with multiple potential funding partners, including extensive due diligence, management
presentations, site visits and shortlisting of qualified parties;
• Ongoing discussions with key contractors, government stakeholders and the local community to
support delivery of a cost-competitive and sustainable project; and
• Completion of a successful $11 million capital raising, including increased participation by RCF to
approximately 9.9% (held via Resource Capital Fund VIII AIV-A).
1
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS' REPORT
PROJECT DEVELOPMENT ACTIVITIES
During the half-year, the Company continued to progress enabling works activities including advancing
significant contracts, procurement activities, and the integration of experienced execution partners to
optimise project delivery schedule.
Key activities are summarised below:
The camp and village enabling works comprised a combination of initial upgrade of the existing
camp to house people required for the early works on site as well as providing a deposit for stage
1 of the operations village.
The Civil & Infrastructure works consisted of deconstruction of legacy structures, aggregate
crushing, building area, airstrip & roads construction and raw water storage tank.
Borefield & Water Supply (Stage 1) included the design, supply and installation of groundwater
reticulation to the process area for the commencement of earthworks.
The Process Plant front end engineering & design for Long Lead Items (LU), was proposed by the
contractor, to facilitate vendor engagement and early procurement activities to maintain the focus
on the project delivery schedule.
Personnel & flights comprised the provision of transport and charter flights to deliver the site-based
activities associated with the enabling works program.
The funding for the enabling works is a component of the overall Project Capex. Procurement and approvals
are aligned to the milestone plan, with timing linked to funding release.
Other critical path packages in preparation for tendering and evaluation during the enabling works period
includes:
o Contracting for the Process plant construction and delivery workfiow;
o Open pit mining contract;
o Civil works;
o Communications infrastructure; and
o Fuel supply.
The Company has also augmented the existing Jervois Project team with highly experienced project
delivery personnel. Additional resourcing is being targeted as project milestones are achieved.
KGL will continue to work with key contractors and each level of government and the local community to
ensure we can deliver a sustainable, cost competitive project, on time.
PROJECT OPTIMISATION ACTIVITIES
The Company continues to build on its optimisation initiatives.
During the half year, the Company focused on the open-cut mine plan which has potential expansion
opportunities in the areas covered by existing mineral resource. An updated open-pit mine plan is currently
being finalised to deliver an incremental increase in the contained metal in the ore feed which can be
processed through the plant during the midpoint of the current processing schedule. This together with
improved metal recovery increases the plant utilisation and capital efficiency of the project.
Ongoing work to refine project capital and working capital costs is focusing on civil works, open cut pre
strip, crusher and mills and selected support infrastructure.
A tender process for the open cut mining has shortlisted several parties targeting firm offers that supports
the FID process.
2
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS' REPORT
625000
•Hamburger
• • htll ,
635000
2 3 km N
i--====-- A
630000 635000
MT Survey 2026
MT_stations 2015
HamHill
Area4
Area3
• Area2
Areal
• Jervois_Expansion
640000
64(\000
Figure 4. Map view over Jervois project, featuring the proposed infill and expansion MT station over entire project area.
Additional infill stations are proposed to further increase resolution over Area I, 2, 3 and 4. Closer spaced stations are planned
for Hamburger hill prospect, in the northeast of Unca Creek tenement.
The new pipeline of targets indicates the potential to extend the Project's operating life to 20+ years
positioning KGL for sustained production growth and long-term shareholder value creation. Future work will
focus on refining and ranking priority targets to support resource growth and extend the Jervois mine life
into the next decade.
The objectives of the Company's medium-term exploration program include:
Expanding open-pit resources adjacent to existing deposits;
Advancing high-priority targets toward drill testing and potential resource definition; and
Progressing district-scale geophysical coverage and integrated modelling to support systematic
resource growth across the Jervois and Unca Creek tenements.
5
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS' REPORT
PROJECT FUNDING ACTIVITIES
KGL, together with financial advisors continues to advance a comprehensive project construction financing
process for the Jervois Project.
During the period, the Company engaged multiple parties under non-disclosure agreements, established a
due diligence data room with phased engagement protocols and site visits to support the funding
discussion.
The Company has received multiple non-binding indicative term sheets and is progressing detailed
discussions with a short list of potential funding partners to assess and refine the optimal funding structure
and commercial terms in support of the Board's Financial Investment Decision.
The financing process includes consideration of a range of structures across debt, strategic investment and
other potential funding instruments to optimise cost of capital and risk allocation.
Commercial offtake discussions for concentrate production are also progressing constructively with several
experienced and capable counterparties. Offtake engagement forms an important component of the overall
financing framework.
An updated baseline economic model will be released to provide a technical and economic framework to
support engagement with strategic partners, funding providers and project delivery stakeholders.
The Company remains focused on progressing toward FID and securing a funding solution that supports
construction commencement.
MARKET COMMENTARY
Structural Tailwinds for KGL's Metals Complex
Global commodity markets continue to demonstrate a sustained structural shift, with copper, silver and gold
demand accelerating against increasingly constrained supply.
Copper Market Dynamics
Independent analyst assessments highlight the emerging scale of imbalance in the global copper market.
Bernstein projects a structural global copper supply deficit emerging from around 2027, widening thereafter
and expected to exceed 10 Mt by 2040.
Big shortfall in copper supply predicted to open up from 2027
mn tonnes
··----··--·••iill
2018 2020
Source Bernstein
c FT
2025 2030 2035 2040
Figure 5. Forecast global copper supply-demand balance (shortfall projectedfrom 2027 onl1'ards)
0
-2
-4
-6
-8
-10
-12
Source: Bernstein research, as reproduced by the Financial Times. Chart shows estimated global copper market balance
(million tonnes) with a widening supply shortfallforecastfrom 2027 onwards.
6
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS' REPORT
and into operations and sustainability. Mr Strohmayr has since commenced his role as Chief Executive
Officer.
FINANCIAL REVIEW
For the six-month period ended 31 December 2025:
• The Group recorded a loss after taxation of $1,977,793 (31 December 2024: loss of $1,343,565},
• $2,625,745 (31 December 2024: $7,483,076) was capitalised to exploration and evaluation assets; and
• The Group cash reserve as at 31 December 2025 was $10,666,643.
MATERIAL BUSINESS RISKS
The Group's exploration and mining operations will be subject to the normal risks of mining and any
revenues will be subject to numerous factors beyond the Group's control. The material business risks that
may affect the Group are summarised below.
FUTURE CAPITAL RAISINGS
The Group's ongoing activities are expected to require substantial further financing, in addition to amounts
raised pursuant to the placement offer completed in November 2025. The Group will require additional
funding to bring the Jervois Project into commercial production. Any additional equity financing may be
dilutive to shareholders and may be undertaken at lower prices than the current market price, and debt
financing, if available, may involve restrictive covenants which limit the Group's operations and business
strategy.
Although the directors believe that additional capital can be obtained, no assurances can be made that
appropriate capital or funding will, if and when needed, be available on terms favourable to the Company
or at all. If the Company is unable to obtain additional financing as needed, it may be required to reduce,
delay or suspend its operations and this could have a material adverse effect on the Group's activities and
could affect the Group's ability to continue as a going concern.
EXPLORATION RISK
The success of the Group depends on the delineation of economically mineable reserves and resources,
access to required development capital, movement in the price of commodities, securing and maintaining
title to the Group's exploration and mining tenements and obtaining all consents and approvals necessary
for the conduct of its exploration activities. Exploration on the Group's existing tenements may be
unsuccessful, resulting in a reduction in the value of those tenements, diminution in the cash reserves of
the Group and possible relinquishment of the tenements.
8
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS' REPORT
MATERIAL BUSINESS RISKS (CONTINUED)
The groundwater will be pumped directly from the vast reserves of the Georgina basin which is estimated
to have 1,320,000 GL water capacity from which the Project has water licences to draw on 1,595.4 ML per
annum. Climate change may impact the flows of water into the Georgina basin over the long-term, however
given the Project life, and the planned water draw being a small overall proportion of the current basin
capacity, ongoing water supply is not considered high risk. While the Group will endeavour to monitor and
manage this risk and limit any consequential impacts, there can be no guarantee that the Group will not be
impacted by changing rainfall and waterflow patterns over the long term.
MACRO-ECONOMIC RISKS
In 2026, the world continues to experience global supply chain disruptions, and labour and equipment
shortages. Inflationary pressures for appropriately skilled labour, oil and capital items are being seen across
many industries, including the mining industry, and the recent geopolitical tensions across a number of
areas worldwide (including the ongoing conflict between Ukraine and Russia) may also continue to
adversely affect capital markets and cause spikes in materials prices, including diesel prices.
FUTURE PROSPECTS
The directors continue to work towards the final investment decision, project financing and development,
which will be supplemented with further near mine resource extension exploration work at the Jervois
Project.
EVENTS AFTER THE REPORTING DATE
No other matters or circumstances have arisen since the end of the financial period which significantly
affected or may significantly affect the operations of the Group, the results of those operations, or the state
of affairs of the Group in future financial periods.
AUDITOR'S INDEPENDENCE DECLARATION
A copy of the auditor's independence declaration as required under section 307C of the Corporations Act
2001, is set out on page 14.
This report is made in accordance with a resolution of directors.
Jeff Gerard
Chairman
Brisbane
11 March 2026
12
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
COMPETENT PERSON'S STATEMENT
The information in this report relates to the integrated 3D inversion modelling on 4 August 2025. The Company
confirms it is not aware of any new information or data that materially affects the information included in the
original market announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply.
13
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms.
Liability limited by a scheme approved under Professional Standards Legislation.
DECLARATION OF INDEPENDENCE BY A J WHYTE TO THE DIRECTORS OF KGL RESOURCES LIMITED
As lead auditor for the review of KGL Resources Limited for the half-year ended 31 December 2025, I
declare that, to the best of my knowledge and belief, there have been:
1. No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2. No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of KGL Resources Limited and the entities it controlled during the period.
A J Whyte
Director
BDO Audit Pty Ltd
Brisbane, 11 March 2026
Level 18, 360 Queen Street
Brisbane QLD 4000
GPO Box 457 Brisbane QLD 4001
Australia
Tel: +61 7 3237 5999
Fax: +61 7 3221 9227
www.bdo.com.au
14
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
AUDITOR'S INDEPENDENCE DECLARATION
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
NOTE 1. BASIS OF PREPARATION OF THE FINANCIAL REPORT
This condensed consolidated interim financial report for the six-month reporting period ended 31 December
2025 has been prepared in accordance with Accounting Standard AASB 134 Interim Financial Reporting and
the Corporations Act 2001.
The interim financial report does not include all the notes of the type normally included in an annual financial
report. Accordingly, this report is to be read in conjunction with the annual report for the year ended 30 June
2025 and any public announcements made by KGL Resources Limited during the interim reporting period in
accordance with the continuous disclosure requirements of the Corporations Act 2001.
The accounting policies adopted are consistent with those of the previous financial period (year ended 30 June
2025) except for the adoption of new and amended standards as set out below.
(a) NEW AND AMENDED STANDARDS AND INTERPRETATIONS ADOPTED BY THE GROUP
A number of amended standards became applicable for the current reporting period. The Group did not have
to change its accounting policies or make retrospective adjustments as a result of adopting these amended
standards.
(b) IMPACT OF STANDARDS ISSUED BUT NOTYET APPLIED BY THE GROUP
Any new or amended standards or interpretations that are not yet mandatory have not been early adopted by
the Group. No new or amended standard or interpretation that is not yet mandatory is expected to have a
significant impact on the Group.
GOING CONCERN
The interim financial report has been prepared on the going concern basis, which contemplates continuity of
normal business activities and the realisation of assets and settlement of liabilities in the normal course of
business.
As disclosed in the interim financial report, the Group incurred a net loss of $1,977,793, net operating cash
outflows of $1,824,986 and net investing cash outflows of $2,665,285 for the half-year ended 31 December
2025. As at 31 December 2025, the Group has cash and cash equivalents of $10,666,643.
The ability of the Group to continue as a going concern is principally dependent upon one or more of the
following:
• The ability of the Company to raise capital as and when necessary, and/or
• The successful exploration and subsequent exploitation of the Group's tenements.
These conditions give rise to material uncertainty which may cast significant doubt over the Group's ability
to continue as a going concern.
The directors believe that the going concern basis of preparation is appropriate for the following reasons:
• The directors believe there is sufficient cash available for the Group to continue operating until it can raise
further capital to fund its ongoing activities.
• Equity raisings have been successful in the past and, as recently as November 2025, a placement offer
of $11,000,000 at $0.14 per new ordinary share was completed.
• The directors can curtail the Group's activities to preserve cash.
19
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS' DECLARATION
In the directors' opinion:
(a) the financial statements and notes set out on pages 15 to 23 are in accordance with the Corporations Act
2001, including:
(i) complying with Accounting Standard AASB 134: Interim Financial Reporting, the Corporations
Regulations 2001 and other mandatory professional reporting requirements, and
(ii) giving a true and fair view of the Group's financial position as at 31 December 2025 and of its
performance for the half-year ended on that date, and
(b) there are reasonable grounds to believe that the Company will be able to pay its debts as and when they
become due and payable.
This declaration is made in accordance with a resolution of the directors.
1A/
Jeff Gerard
Chairman
Brisbane
11 March 2026
24
Tel: +61 7 3237 5999
Fax: +61 7 3221 9227
www.bdo.com.au
Level 18, 360 Queen Street
Brisbane QLD 4000
GPO Box 457 Brisbane QLD 4001
Australia
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms.
Liability limited by a scheme approved under Professional Standards Legislation.
INDEPENDENT AUDITOR'S REVIEW REPORT
To the members of KGL Resources Limited
Report on the Half-Year Financial Report
Conclusion
We have reviewed the half-year financial report of KGL Resources Limited (the Company) and its
subsidiaries (the Group), which comprises the consolidated balance sheet as at 31 December 2025, the
consolidated statement of profit or loss and other comprehensive income, the consolidated statement
of changes in equity and the consolidated statement of cash flows for the half-year ended on that
date, material accounting policy information and other explanatory information, and the directors’
declaration.
Based on our review, which is not an audit, we have not become aware of any matter that makes us
believe that the accompanying half-year financial report of the Group does not comply with the
Corporations Act 2001 including:
i. Giving a true and fair view of the Group’s financial position as at 31 December 2025 and of its
financial performance for the half-year ended on that date; and
ii. Complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations
Regulations 2001.
Basis for conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by the
Independent Auditor of the Entity. Our responsibilities are further described in the Auditor’s
Responsibilities for the Review of the Financial Report section of our report. We are independent of
the Company in accordance with the auditor independence requirements of the Corporations Act 2001
and the ethical requirements of the Accounting Professional and Ethical Standards Board’s APES 110
Code of Ethics for Professional Accountants (including Independence Standards) (the Code) that are
relevant to the audit of the annual financial report in Australia. We have also fulfilled our other ethical
responsibilities in accordance with the Code.
We confirm that the independence declaration required by the Corporations Act 2001 which has been
given to the directors of the Company, would be the same terms if given to the directors as at the time
of this auditor’s review report.
25
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms.
Liability limited by a scheme approved under Professional Standards Legislation.
Material uncertainty relating to going concern
We draw attention to Note 1 in the financial report which describes the events and/or conditions which
give rise to the existence of a material uncertainty that may cast significant doubt about the Group’s
ability to continue as a going concern and therefore the Group may be unable to realise its assets and
discharge its liabilities in the normal course of business. Our conclusion is not modified in respect of
this matter.
Responsibility of the directors for the financial report
The directors of the company are responsible for the preparation of the half-year financial report that
gives a true and fair view in accordance with Australian Accounting Standards and the Corporations Act
2001 and for such internal control as the directors determine is necessary to enable the preparation of
the half-year financial report that is true and fair and is free from material misstatement, whether due
to fraud or error.
Auditor’s responsibility for the review of the financial report
Our responsibility is to express a conclusion on the half-year financial report based on our review. ASRE
2410 requires us to conclude whether we have become aware of any matter that makes us believe
that the half-year financial report is not in accordance with the Corporations Act 2001 including giving
a true and fair view of the Group’s financial position as at 31 December 2025 and its performance for
the half-year ended on that date, and complying with Accounting Standard AASB 134 Interim Financial
Reporting and the Corporations Regulations 2001.
A review of a half-year financial report consists of making enquiries, primarily of persons responsible
for financial and accounting matters, and applying analytical and other review procedures. A review is
substantially less in scope than an audit conducted in accordance with Australian Auditing Standards
and consequently does not enable us to obtain assurance that we would become aware of all significant
matters that might be identified in an audit. Accordingly, we do not express an audit opinion.
BDO Audit Pty Ltd
A J Whyte
Director
Brisbane, 11 March 2026
26