Quarterly Activities and Cashflow Report - March 2025
Released
Released
Announcement PDF
ASX Announcement
Quarterly Activities Report
Quarterly
Activities
Period
Ended
31 MarchReport
2025
Period Ended 31 March 2025
c
30 April 2025
Highlights
Project Development Activities
•
KGL recently announced the results of the Feasibility Study Update (FSU25) for the high-grade Jervois
Copper Project (the “Project”) which demonstrated the project is economically robust with a Base Case
NPV(8% real, after tax) of A$405 million, has an attractive capital efficiency of A$12,000/t (less than
US$8,000/t) and strong margins over a mine life of 10 years (based on copper price of US$4.58/lb.)
•
The Project is highly leveraged to copper prices. Based on an incentive price of US$5.90/lb, the project is
expected to generate an NPV (8% real after tax) of A$682 million.
•
The Project is one of the highest-grade undeveloped copper deposits in Australia in a Tier One mining
jurisdiction with all necessary permits to begin construction at a time when chronic shortfalls in the copper
market are expected to grow significantly over the next decade.
•
KGL believes the timing is right to progress financing options for development of the Project. KGL is
focused on securing the optimal funding structure and strategic partners to support its goal of
commencing production in 2027— recognising this is a critical step to maximise returns for shareholders
whilst contributing to in-country economic development, sustainability and employment.
•
In this regard, KGL has appointed Cutfield Freeman & Co and amicaa Advisors as joint Corporate
Advisors for the financing of the high-grade Jervois copper project.
Drilling Program
•
The primary focus of the 2024 drilling program was to increase confidence in the Resource Model, extend
the project life at Rockface, Reward Deeps and Marshall and support completion of the Feasibility Study
Update.
•
The final drilling results for the 2024 drilling program comprised 75 holes for 23,037 meters were
announced during the quarter.
o
The remaining 35 holes included an increased focus on delineating additional, near-surface
resources that might be recoverable by open cut methods, targeting expansion of the planned box
cut at Reward East and an area identified as Bellbird North and site preparation works.
o
Near surface mineralisation at Reward East and between Bellbird and Bellbird North confirmed the
potential to support an extension of open cut mining operations, subject to additional infill drilling
o
Significant copper intersections were recorded at Reward, Reward Deeps, Reward East and Cox’s
Find.
o
Copper, lead, and zinc mineralisation was intersected at Bellbird North, along the western limb of
the J-Fold.
•
The western limb of the J-fold has strong geophysical signatures suggesting high prospectivity. The
results of the final exploration hole (KJC684) for 2024 which targeted a geophysical anomaly at Crowe’s
Nest confirmed a discovery with similar mineralisation to Reward (brecciated IOCG) highlighting the
potential significance of the western limb of the J-Fold which has the potential to unlock an additional 9–
12 km of prospective structure for exploration within the Jervois project area.
•
The discovery of a magnetite body on the western limb, with associated copper mineralisation, supports
the hypothesis that the Jervois Fault may have served as a primary pathway for mineralised fluids across
the entire Jervois Project.
KGL Resources Limited | Quarterly Activities Report
Page 1 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Exploration Planning
•
The 2024 drilling program was focused on exploration in and around the Resource Model to extend the
project life at Rockface, Reward Deeps and Marshall and has delivered some of the highest polymetallic
grades ever achieved at Jervois confirming Jervois’ growth potential.
•
An ongoing work program involving Geophysics and Gravity and Magnetic Inversion Analysis with Viridien
Multiphysics is progressing to assist in confirming additional high value and high potential exploration
targets for the development of an exploration program focused on extending the life of the Jervois project,
Currently there are over 30 exploration targets across the Jervois and Unca Creek tenements that are
being assessed for strategic and critical mineral occurrences and project life extension.
Corporate
•
Mr. Jeff Gerard has assumed the functions of the Executive Chairman whilst a search for a dedicated
CEO is underway.
•
Multiple meetings were conducted over the quarter with Northern Territory Government Ministers, Head of
Departments and staff, Central Lands Council, local service providers, and stakeholders in the Northern
Territory.
•
In March 2025, presentations to Brokers, Institutions and investors were delivered to multiple parties in
Melbourne, Sydney and Brisbane. Meetings with potential debt providers and banks both offshore and
onshore were conducted to introduce the project credentials prior to commencing a substantial
engagement process.
•
Current cash & cash equivalent as at 31st March 2025 was $2.495 million.
•
A non-renounceable pro-rata Entitlement Offer was announced on 6 March 2025. The Offer closed on
31 March 2025 and settled on 7 April 2025.
•
The Entitlement Offer raised an additional $4.2 million before costs.
•
Subsequent to the end of the reporting quarter, KGL appointed Cutfield Freeman & Co and amicaa
Advisors as joint Corporate Advisors for the financing of the high-grade Jervois copper project.
KGL Resources Limited | Quarterly Activities Report
Page 2 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Project Development Activities
On 10/2/25, KGL announced the results of the Feasibility Study Update (FSU25) for the high-grade Jervois
Copper Project (the “Project”) which demonstrated the Project is economically robust with an NPV (8% real, after tax)
of A$405 million, has an attractive capital efficiency of A$12,000/t, strong margins over a mine life of 10 years
and a simple payback of circa. 3.4 years from first concentrate.
The Project is highly leveraged to copper prices.
Table 1 Project Sensitivity
A key focus of improvements to the Feasibility Study completed in 2022 included:
▪
Quantifying the impact of potentially expanding the open pit mine plan and increasing the size of the
mining equipment resulting in higher and more efficient open pit mining rates. This will effectively delay
the capital development of the underground mines whilst smoothing capital expenditure and peak labour
and accommodation requirements.
▪
Proposed process plant configuration enhancements to reduce the amount of labour required on-site
for construction and increases the annual nameplate processing rate from 1.6 Mtpa to 2.0 Mtpa.
▪
Improving confidence and categorisation of the reserves and growing the resource tonnages available
for open pit mining in the first 3-4 years, and at depth.
The changes have improved the mine plan, updated capital and operating costs estimates, and de-risked the
project. The FSU25 contained copper resource has increased by 8.0% to 510,000 tonnes and the proportion
of open cut increased from 25% to 41% of total ore mined. Proven ore reserves from the open pit are mined
and processed through the plant over 4 years. During this time, the operations are transitioned to underground
ore feed to the plant, funded by operating cash flows.
The FSU 25 10-year mine life lays the foundation for low cost / accretive growth. Substantial potential exists
for Resource and Ore Reserve growth with each of the three main deposits (Reward, Bellbird and Rockface)
open
at depth and along strike, leading to increased utilisation of the installed plant capacity and mine life extension.
The Jervois tenements remain under explored with recent drilling focused on infill drilling and extending the
resource and knowledge, at depth, for the current lodes. This work has consistently demonstrated high grade
copper intersects in these areas. Structural geology and geophysical interpretations of existing exploration
information are providing key targets for future exploration programs.
KGL is well positioned with all necessary approvals, to deliver its high-grade Jervois project into a copper
market at a time of a projected chronic global supply shortfall bringing opportunities for jobs and economic
development to the Northern Territory, ensuring sustainable operations and delivering long-term value to
stakeholders.
KGL Resources Limited | Quarterly Activities Report
Page 3 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
An Independent Technical Review (Phase 1) has been completed by RPM Global showing no red flag / critical
issues. Lower-level risk issues (not Red Flags) have been included in the Company Risk Register with risk
mitigations initiatives scheduled accordingly.
KGL believes the time is right to progress financing options and the development of the Project and accordingly,
have recently appointed Corporate Advisors for the financing of the high-grade Jervois copper project.
With the appointment of Corporate Advisors in place, the priority for KGL in 2025 will be on securing the optimal
funding structure and strategic partners to support its goal of commencing production in 2027— recognising
this is a critical step to maximise returns for shareholders whilst contributing to economic development,
sustainability and employment.
Drilling Program
Following the completion of Phase 1 (resource expansion), the exploration program shifted in the fourth
quarter to focus on near-surface resources with open-pit mining potential. As part of this initiative, 32 shallow
RC holes were drilled. Assays results for an additional 2 drill holes at Reward Main and Reward Deeps,
originally part of Phase 1, were also received during the quarter. The last hole of the year, KJC684, is a
discovery hole on the western limb of J-fold, at Crowe’s Nest prospect (Figure 1 Map of Jervois project
showing the location of reported holes.).
Highlights of the drilling program are detailed below.
Figure 1 Map of Jervois project showing the location of reported holes.
KGL Resources Limited | Quarterly Activities Report
Page 4 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Reward Main and Reward Deeps
The remaining drill holes from Phase 1, KJD642D1 at Reward Main Lodes and KJD641D3 at Reward Deeps,
intersected broad zones of strong copper mineralisation (Figure 2).
•
KJD642D1: 7.50 m @ 2.24% Cu, 15.40 g/t Ag, 0.17 g/t Au from 376.48 m (Reward Main) including
1.49 m @ 4.91% Cu, 26.67 g/t Ag, 0.28 g/t Au from 377.87 m, and
1.08 m @ 5.40% Cu, 24.48 g/t Ag, 0.38 g/t Au from 381.95 m
•
KJD641D3: 5.00 m @ 2.61% Cu, 18.54 g/t Ag, 0.26 g/t Au from 711.00 m (Deeps North) including
2.63 m @ 4.54 % Cu, 31.16 g/t Ag, 0.46 g/t Au from 713.80 m.
Figure 2 Long projection of Reward deposit showing resource block model 2024, blocks shown coloured by copper
grade. Proposed reward open pit outline 2024. The trace of all holes with assay displayed copper grade (ppm),
and the intersection of the reported drilled holes at Reward main lodes and Reward Deeps north lode.
KGL Resources Limited | Quarterly Activities Report
Page 5 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Reward East
The drilling and geophysics data confirmed that Reward East, a parallel structure with Reward, is highly
prospective at depth ( Figure 3) and along strike.
Figure 3 Cross Section over Crowe’s Nest Reward (7495035mN). Showing the magnetic inversion model 2024,
with structural interpretation form magnetic data (1VD). Reward ore body coloured by copper grad and proposed
pit outline.
The purpose of this drilling was to test the lateral extension of Reward East Lodes (along the strike) (Figure 4),
to determine if there is sufficient grade and tonnage near the surface to support an open-pit operation. Drilling
has previously confirmed strong high-grade copper at shallow depths.
The results of holes KJD644, KJD645, and KJD647 confirmed the northern extension of mineralisation
indicating that the open-pit potential at Reward East remains viable.
Hole KJD644 intersected moderate copper mineralisation in the Reward East footwall, including a strong
copper interval over a short section.
•
KJD644:
2.63 m @ 1.15% Cu, 5.88 g/t Ag, 0.03 g/t Au from 50.00 m (Reward East footwall)
Including 0.49 m @ 5.68% Cu, 28.00 g/t Ag, 0.13 g/t Au from 51.60 m.
KGL Resources Limited | Quarterly Activities Report
Page 6 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Holes KJD645, KJD647, and KJD651 intersected weaker copper mineralisation in the Reward East hanging
wall lodes.
• KJD645:
1.29 m @ 0.71% Cu, 1.78 g/t Ag, 0.02 g/t Au from 48.50 m and
4.49 m @ 0.58% Cu, 8.60 g/t Ag, 0.02 g/t Au from 58.40 m.
•
KJD647:
4.66 m @ 0.44% Cu, 1.07 g/t Ag, 0.00 g/t Au from 33.80 m.
Holes KJD651 and KJD655 drilled at the southern margin returned weaker results. Hole KJD655 returned no
reportable assays (below the cutoff grade 0.4% copper).
•
KJD651:
0.77 m @ 0.80% Cu, 3.10 g/t Ag, 0.01 g/t Au from 150.90 m.
Figure 4 Long projection (630520mE) of Reward East resource block model 2024, coloured by copper grade.
Reported holes trace shown the copper assay. All other hole traces are grey colour.
KGL Resources Limited | Quarterly Activities Report
Page 7 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Bellbird
The Bellbird deposit, located on the western limb of the J-Fold, contains multiple ore bodies. Significant
resources exist within the Bellbird Main North Lodes and Bellbird North, though these are not currently included
in the existing reserve.
The objective of the RC drilling program at shallow depths was to extend the known resources along strike to
the north and establish continuity between the Bellbird Main Lodes and Bellbird North, potentially supporting
an open pit (7 holes) (Figure 5). Two holes to test the gap between Main and Main North lodes (Figure 5).
Additionally, six drill holes have been completed immediately south of the current pit to assess grade and
thickness for potential pit expansion. (Figure 5).
Four of the seven drill holes (KJC668, KJC669, KJC670 and KJC671) at Bellbird North targeted the gap
between Bellbird Main North and Bellbird North (see Figure 5), intersecting strong copper mineralisation with
sufficient thickness to potentially support extension of open-cut operations and to increase shallower
underground extraction and mine life, subject to additional infill drilling.
The remaining three holes were designed to extend Bellbird North at depth (KJC667) and further north (KJC665
and KJC666). All three holes intersected moderate copper mineralisation and also returned high-grade leadzinc and silver mineralisation (Figure 5).
Figure 5 Long projection of Bellbird deposit, showing resource block model coloured by copper grade (Bellbird
east lodes filtered). Intersection of reported drill holes (copper grade in ppm), proposed bellbird pit 2024, box cut
and underground developments.
KGL Resources Limited | Quarterly Activities Report
Page 8 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Cox’s Find
Legacy drill holes at the Cox’s Find prospect have indicated elevated copper grades, with intersections defining
three distinct mineralised trends (North, Central, and South) that align with surface malachite outcrops. The
northern trend, which has the most extensive data, suggests a steep northward plunge.
A MIMDAS IP survey conducted identified some anomalies in the area (Figure 6). A recent drilling program,
comprising 10 holes, was designed to infill and assess the potential for an open-pit operation at Cox’s Find.
While significant copper mineralisation was intersected, structural analysis suggests that the upper 50 meters
of the deposit exhibit reduced thickness and grade.
The copper grades and mineralisation thickness increase with depth, indicating that Cox’s Find remains a viable
target for future exploration and underground mining. To date these occurrences have not been included in the
current project modelling.
Figure 6 Long projection of Cox’s Find prospect, showing the intersection of reported holes (10 holes), coloured
by copper grade (cutoff at 0.4%). MIMDAS IP chargeability 2021. Down hole electromagnetic (DEHM) conductors.
All legacy hole traces are in grey colour.
KGL Resources Limited | Quarterly Activities Report
Page 9 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Two holes (KJD652, KJC680) in the central and two holes (KJD643, and KJD646) at the north of deposit
intersected strong copper mineralisation in the brecciated magnetite-quartz vine, with significant thickness
(Figure 7). Similarly hole KJD649 in between the two high grade trend returned strong copper mineralisation
in a thin but massive brecciated sulphide/magnetite vein, that is aligned with DHEM conductor (Figure 7).
Figure 7 Cross section over northern zone of Cox’s Find deposit (7491350mN slice thickness is 84m) showing
holes KJD643, KJD646 and KJD649 intersection, MIMDAS IP chargeability 2021. All other hole traces are grey in
colour. DHEM conductor modelled from previously drill hole KJC461.
KGL Resources Limited | Quarterly Activities Report
Page 10 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Crowe’s Nest
The Crowe’s Nest and Scarp Trend, located on the western limb of the J-Fold, has been a persistent
geophysical hotspot since KGL’s initial gravity and magnetic surveys in 2016 and 2017 (Figure 8).
Figure 8 Map of the Jervois Project displays the Aeromagnetic Total Magnetic Intensity (TMI) on the left and the
Residual Bouguer Gravity (curve and terrain corrected) on the right. Both gravity and magnetic data emphasise
the significance of the western limb of the J-Fold.
Soil sampling has historically identified anomalous copper grades at the Scarp prospect, prompting follow-up
drilling with three shallow RC holes, the deepest reaching only 100 meters. One of these legacy holes logged
magnetite and returned elevated copper assay results
In the latter part of 2024, a single RC hole, KJC684, was drilled at the northern end of the western limb of the
J-Fold, where the geophysical anomalies are shallower along this trend targeting a geophysical anomaly at the
Crowe’s Nest prospect.
The hole intersected three brecciated magnetite bodies, with the main intersection measuring 17 meters (from
205 to 222 m), thereby confirming the geophysical anomaly and returning anomalous copper assay results.
The highest intersection is 0.15% copper (from 174 to 175 m). This new finding potentially opens another 912 km long western limb of the J-Fold (Scarp – Crowe’s nest trend) for exploration (Figure 8)
KGL Resources Limited | Quarterly Activities Report
Page 11 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Exploration Planning
The 2024 exploration program activity targeted exploration in and around the Resource Model to extend the
project life at Rockface, Reward Deeps and Marshall and delivered some of the highest polymetallic grades
ever achieved at Jervois confirming Jervois’ growth potential.
Figure 9 Cross Section over Crowe’s Nest Reward (7495035mN). Showing the magnetic inversion model 2024,
with structural interpretation form magnetic data (1VD). Reward ore body coloured by copper grad and proposed
pit outline.
The Jervois exploration leases remain underexplored with significant upside potential due to their position along
the crustal-scale Jervois Fault.
Based on recent work by Dr. Warwick Crowe, a leading international structural geologist, an updated analysis
of the Jervois geology and geophysics data supports a fluid migration model for the Jervois magnetite-copper
mineral system that involves a deep, late tectonic, felsic intrusive source at depth intersecting the crustal scale
Jervois Fault which provided a conduit for fluid migration to higher crustal levels.
The line of fault intersection between the Jervois Fault and the J-Fold structure may have provided for more
focused fluid ingress. As shown in Figure 9., an interpreted cross section on magnetic inversion data across
the J-Fold shows the Jervois Fault is the major structure in the area dipping to the east beneath the J-Fold.
The intersection of the J-Fold with the Jervois Fault Zone may have enabled preferential fluid migration into the
J-Fold structure. The line of fault intersections between the two structural domains would also have facilitated
focused fluid ingress along the Jervois Fault and into the subsidiary systems.
Building on these insights, KGL has commissioned Viridien Multiphysics to undertake a comprehensive
Geophysics and Gravity and Magnetic Inversion Analysis to assist in confirming additional high value and high
potential near mine, brownfield and greenfield exploration targets for future exploration programs.
This ongoing work program that is expected to involve Geophysics and Gravity and Magnetic Inversion Analysis
KGL Resources Limited | Quarterly Activities Report
Page 12 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
with Viridien Multiphysics is progressing to assist in confirming additional high value and high potential
exploration targets for in the development of an exploration program focused on extending the life of the Jervois
project. Currently over the Jervois and Unca Creek tenements there are over 30 exploration targets that are
being assessed for Strategic and Critical Mineral occurrences (Figure 10).
Figure 10. Existing occurrences within the Jervois and Unca Creek tenements for review / exploration planning
Corporate
Mr Jeff Gerard has assumed the executive functions of the Executive Chairman whilst a search for a dedicated
CEO is underway.
In March 2025, presentations to Brokers, Institutions and investors were delivered to multiple parties in
Melbourne, Sydney and Brisbane.
Meetings with potential debt providers and banks both offshore and onshore were conducted in March to
introduce the project credentials prior to commencing a substantial engagement process.
Current cash & cash equivalent as at 31st March 2025 was $2.495 million.
A non-renounceable pro-rata Entitlement Offer was announced on 6 March 2025. The Offer closed on 31 March
2025 and was settled on 7 April 2025.
The Entitlement Offer raised a total of approximately $4.2 million before costs.
Government and Community Engagement
During the quarter, the Executive Chairman attended the launch of the 2025 Year of Action initiative in Darwin
by the Chief Minister and met with the Department of the Chief Minister and Cabinet, the deputy Chief
minister/Minister for Mining, Treasurer, Territory Coordinator, CEO and staff of the Department of Mines,
KGL Resources Limited | Quarterly Activities Report
Page 13 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2025
Department of Trade Business and Asian Relations. The areas of Government were supportive and
encouraging, on each occasion.
Further follow-up meetings occurred in April in Alice Springs with the Central Lands Councils, various
department heads of the Northern Territory Government, local service providers, ICN, and stakeholders.
Over the Easter weekend, the team also hosted a BBQ for the Bonya community including organising Easter
games and activities.
This announcement has been approved by the Board of KGL Resources Limited.
KGL Resources Limited | Quarterly Activities Report
Page 14 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
c
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
Jervois Project, Northern Territory
100%
ML 30182
Jervois Project, Northern Territory
100%
ML 30829
Jervois Project, Northern Territory
100%
EL 25429
Jervois Project, Northern Territory
100%
EL 30242
Mt Cornish, Northern Territory
100%
EL 28340
Yambah, Northern Territory
100%
EL 28271
Yambah, Northern Territory
100%
EL 28082
Unca Creek, Northern Territory
100%
ML 32277
Lucy Creek Borefield, Northern Territory
100%
Mining Tenements Acquired/Granted and
Disposed during the quarter*
Location
Beneficial Holding
Location
Beneficial Holding
Location
Beneficial Holding
Nil
Tenements subject to farm-in or farm-out
agreements
Nil
Tenements subject to farm-in or farm-out
agreements acquired or disposed of during the
quarter
Nil
Related Party Payments
As reported in the quarterly cash flow report part 6.1, amounts paid to related parties of $41k
consist of directors’ fees and expenses for the quarter.
KGL Resources Limited | Quarterly Activities Report
Page 15 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
c
Forward Looking statements
This presentation includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”,
“project”, “opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward
looking statements. All statements, other than statements of historical fact, included herein, including without
limitation, statements regarding forecast cash flows and potential mineralisation, resources and reserves,
exploration results and future expansion plans and development objectives of KGL are forward-looking statements
that involve various risks and uncertainties. Although every effort has been made to verify such forward-looking
statements, there can be no assurance that such statements will prove to be accurate and actual results and future
events could differ materially from those anticipated in such statements. You should therefore not place undue
reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking
statements. Statements in relation to future matters can only be made where the Company has a reasonable
basis for making those statements.
Competent Person Statement
The information in this announcement that relates to a Production Target and the forecast financial information
derived from the production was first released to the market on 10 February 2025. KGL Resources Limited
confirms that all the material assumptions underpinning the production target and forecast financial information
derived from the production target continue to apply and have not materially changed.
The following drill holes were originally reported under the JORC code 2012 on the date indicated in the table. The
Company confirms it is not aware of any new information or data that materially affects the information included in
the original market announcement and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed.
.
JORC Reported
Hole
Date originally Reported
Under
JOC172
8/8/2014
2012
JOC195
17/11/2014
2012
JOC196
17/11/2014
2012
KJCD074
29/05/2014
2012
KJD270
17/07/2018
2012
KJD624D1
18/03/2025
2012
KJD641D3
18/03/2025
2012
KJD644
18/03/2025
KJD645
18/03/2025
2012
2012
KJD647
18/03/2025
2012
KJD651
18/03/2025
2012
KJD649
18/03/2025
2012
KJD643
18/03/2025
2012
KJD646
18/03/2025
2012
KGL Resources Limited | Quarterly Activities Report
Page 16 of 17
ASX Announcement
Quarterly Activities Report
Period Ended 31 March 2024
c
The Resource information was first released to the market on 10/02/2025 and complies with JORC 2012. The
company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
KGL Resources Limited | Quarterly Activities Report
Page 17 of 17
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
KGL Resources Limited
ABN
Quarter ended (“current quarter”)
52 082 658 080
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers – GST receipts
1.2
Payments for
Year to date
(9 months)
$A’000
199
948
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(258)
(869)
(e) administration and corporate costs
(402)
(1,685)
-
-
42
227
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Other
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(419)
(1,379)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(3)
(30)
(2,282)
(9,997)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash
Share your feedback
Discover