Annual Report to shareholders
Released
Released
Announcement PDF
2014 ANNUAL
REPORT
KGL Resources Limited
2014 Annual Report
CHAIRMAN’S LETTER
KGL Resources has been successful in 2014 in progressing Jervois towards development as a
sustainable mid-sized multi-metal mine.
The total mineral Resource at Jervois was increased by another 60%, the fourth upward revision in
the three years since KGL acquired Jervois, in Australia’s Northern Territory.
At the same time, an update of the ongoing pre-feasibility study confirmed the technical and
commercial viability of Jervois. The study set out a seven-year production plan based on the new
Resource, estimated to contain 280,000 tonnes copper and 18 million ounces silver, together with
gold, lead and zinc. The study also estimated a C1 cash cost of US$1.51/lb which was not
surprising considering Jervois is one of Australia’s and the world’s highest grade undeveloped
open pit copper properties.
The intensive exploration drilling and other studies have clearly succeeded in adding significant,
tangible value to Jervois, and have more than justified the overwhelming attention that we are
giving to the Company’s major asset.
The feasibility update was based on a Resource estimate calculated from drill results up to mid2014, and it pointed to strong upside potential from the continuing drilling and metallurgical work
that the Company was then planning.
Progress subsequent to the Resource increase and feasibility update has added real momentum to
Jervois.
High grade drill results did indeed continue to flow in the second half of the year, with many
important outcomes.
They confirmed the high-grade near surface mineralisation in the planned open pits. The
Resources in the pits will undoubtedly be upgraded in levels of confidence as a result. As well as
copper, silver, lead and zinc, more gold is being intersected within the pit outlines.
The drilling also indicated extensions to the known orebodies along the 12-kilometre strike length,
closing the gaps between deposits and continuing to encounter high grade mineralisation laterally
and at depth. In one particularly exciting indicator of the potential scale of Jervois, high grade
intersections in a deep hole beneath the Reward deposit confirmed the continuation of
mineralisation from the surface to a depth of 860 metres.
The Operating Review later in this report includes some of the 2014 drill results. Comprehensive
results were announced progressively to the ASX.
We are confident that the already robust economics of Jervois will be enhanced by these drill
results. However, with the continuing flow of results pointing to the potential for a larger, more
valuable asset through upgrading and resource extension, we took the decision late in 2014 to
Page 1
2014 Annual Report
institute an additional work program, with the intention of improving the economic parameters even
further. The program is targeting $100M to $200M of additional free cash flow over the life of the
project.
The cost of the program is estimated at $2.7M and is being funded from existing cash reserves. At
a time when many mining and exploration companies are severely restricted by cash shortages,
KGL has been able to fund exploration and pre-feasibility studies internally. Contributing to those
reserves have been proceeds from the sale for $15 million of the Murchison gold project in
Western Australia which was completed early in 2014.
However, the Company is actively seeking a partner to take equity in Jervois, to take the project
beyond the current drilling and feasibility studies, to contribute to the development of the mine and
processing plant and also the cost of deep drilling, the first result of which has been spectacularly
successful, as I have already noted.
While the Company’s focus is firmly on Jervois, KGL maintained a position in the Savo Island
geothermal power project in the Solomon Islands during the year. KGL identified this energy
opportunity some four years ago, and Geodynamics Limited is managing and funding the work
there under a farm-in agreement.
I would like to extend sincere thanks to my fellow directors for their support and advice throughout
the year. Shareholders are well served by their highly relevant expertise and experience in mineral
exploration, financing and development. I would also like to thank Managing Director Simon Milroy
and his small team for their hard work and the progress achieved.
The current work program at Jervois is designed to improve the scale, quality and economics of a
project that is already recognised for its high grade and technical and economic viability. We look
forward to increasing shareholder value in 2015 as we move towards the development stage of this
impressive project.
Andrew E. Daley
Chairman
2014 Annual Report
MANAGING DIRECTOR’S REPORT
Jervois Copper-Silver-Gold Project, Northern Territory (KGL 100%)
In December 2014 the company completed a pre-feasibility study (PFS) on the Jervois copper
project. The PFS showed that
Jervois was a technically and commercially feasible project with strong upside from additional
planned drilling and metallurgical work.
The key findings were as follows: Based on Resources of 25.3Mt containing 280kt copper, 18Moz silver, 120kt lead/zinc and
113koz gold (includes inferred resources)
Throughput estimated at 2Mtpa over an initial 7 year mine life (4.5 years open cut)
Production of approximately 21,000 t/pa copper and 1 million oz/pa silver in concentrate
plus gold, lead and zinc
Capex estimated at A$192M including $22M in contingency.
Estimated C1 cash costs of US$1.51/lb *
* (After by-product credits and using an exchange rate of A$/USD 0.845 and silver price of
USD 20/oz)
There is a low level of geological confidence associated with inferred mineral resources and there
is no certainty that further exploration work will result in the determination of indicated mineral
resources or that the production target itself will be realised.
The Jervois project was confirmed as a viable mid-sized, multi-metal mine. However, the
opportunities to add value to the project before proceeding to development were too substantial to
ignore. The opportunities at Jervois are demonstrated not only by the PFS to date, but also the
continuing flow of exploration results that point to the potential for a larger and more valuable
asset.
The declared strategy for Jervois includes attracting an equity partner into the project. It is
important therefore that the project be presented in the best possible way to attract such a partner
to contribute to the project’s development. We are confident the current PFS optimisation work
program will be important in maximising the value of Jervois to shareholders.
The additional works program is targeting an additional $100m to $200m of free cash flow over the
life of the project in an optimised pre-feasibility study. At the completion of this additional work
programme, we expect improved economic parameters for the project will have been realised and
will be made available to the market. This work is expected to be completed in late 2015.
The PFS optimisation work comprises resource drilling, geotechnical drilling, metallurgical studies
and cost reviews.
Increases in the size and quality of the mineral Resource are targeted, with an updated Resource
estimate expected in July.
The optimisation work undertaken so far indicates increases in the recovery rates of copper and
silver, increases in the range of ores which can be processed, and reductions in mining and other
operating costs.
Page 3
2014 Annual Report
RESERVES AND RESOURCES
Jervois
Copper
Resources
Marshall
Copper
Reward
Copper
East
Reward
Bellbird
Cox’s Find
Rock Face
Green
Parrot Cu
TOTAL
Jervois
Lead/Zinc
Resources
MarshallReward
Lead/Zinc
Green
Parrot Pb
Bellbird
North
TOTAL
2014
Combined
2012
Combined
2014/2012
Category
Tonnes
Mt
Copper
%
Silver
g/t
Indicated
Inferred
Indicated
Inferred
1.2
0.4
3.7
6.8
1.52
1.18
1.11
1.08
Inferred
2.3
Indicated
Inferred
Inferred
Inferred
Lead
%
Zinc
%
Copper
kt
Silver
Moz
Lead
kt
Zinc
kt
38.7
26.2
24.8
26.5
18
5
41
73
1.5
0.3
3.0
5.8
Cutoff
Cu%
0.5
0.5
0.5
0.5
1.01
8.3
23
0.6
0.5
3.2
4.0
0.7
0.7
1.21
1.25
0.87
0.82
7.8
7.8
2.8
3.1
39
50
6
6
0.8
1.0
0.1
0.1
0.5
0.5
0.5
0.5
Inferred
0.2
1.49
44.3
3
0.3
0.5
Indicated
Inferred
TOTAL
8.1
15.0
23.2
1.21
1.10
1.14
20.1
16.9
18.0
98
165
263
5.3
8.2
13.4
Category
Tonnes
Mt
Copper
%
Silver
g/t
Lead
%
Zinc
%
Copper
kt
Silver
Moz
Lead
kt
Zinc
kt
Cutoff
Cu%
Indicated
0.3
0.71
63.7
6.33
0.94
2
0.6
18
3
None
Inferred
0.5
0.58
75.7
7.09
1.18
3
1.3
38
6
None
Inferred
0.9
0.90
85.3
1.91
1.21
8
2.3
16
10
0.3
Inferred
0.5
0.65
21.3
2.30
3.38
3
0.3
11
17
0.2
Indicated
Inferred
TOTAL
0.3
1.9
2.2
0.71
0.75
0.74
63.7
65.9
65.6
6.33
3.49
3.87
0.94
1.76
1.65
2
14
16
0.6
4.0
4.6
18
66
84
3
33
36
TOTAL
25.3
1.10
22.1
280
18.0
84
36
TOTAL
13.7
1.25
25.5
170
11.2
26
22
%
Variance
85%
64%
61%
225%
63%
JORC COMPLIANCE STATEMENT
The Jervois Resources information was first released to the market on 15 September 2014 and complies with JORC 2012. The company
confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement
and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.’
The Jervois Pre-Feasibility Results were first released to the market on 8 December 2014 and complies with JORC 2012. The company
confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement
and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed.
2014 Annual Report
TENEMENT LISTING
Tenement
Number
ML 30180
ML 30182
EL 25429
EL 30242
AP1602
PL 01/12
Location
Jervois Project, Northern
Territory
Jervois Project, Northern
Territory
Jervois Project, Northern
Territory
Jervois Project, Northern
Territory
Bashkol, Kyrgyz Republic
Savo Island, Solomon Islands
Beneficial Holding
100%
100%
100%
100%
80%
75%
Page 5
KGL RESOURCES LIMTED
AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
FINANCIAL STATEMENTS
FOR THE YEAR ENDED 31 DECEMBER 2014
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
Contents
Page
Directors’ Report
1
Auditor’s Independence Declaration
17
Directors’ Declaration
18
Statement of Profit or Loss and Other Comprehensive Income
19
Statement of Financial Position
20
Statement of Cash Flows
21
Statement of Changes in Equity
22
Notes to the Financial Statements
24
Independent Auditor’s Report
64
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT
The directors present their report on the consolidated entity (or the Group) consisting of KGL
Resources Limited and the entities it controlled at the end of, or during, the year ended 31
December 2014.
DIRECTORS
The names and details of the Company’s directors in office during the financial year and until the
date of this report are as follows. Directors were in office for this entire period unless otherwise
stated.
Names, qualifications, experience and special responsibilities
Andrew Daley
BSC (HONS)(MINING)
Grad Dip (GeoSc), C.Eng (UK),
FAusIMM, MIOM3
Non-Executive Chairman
Appointed 10 November 2004
Mr Daley commenced his mining career in 1970 with Anglo
American on the Zambian copper belt and later worked with
Rio Tinto and Conoco Minerals also in Africa. He moved to
Australia with the engineering group Fluor Australia in 1981
working on new project evaluation. In 1983 Mr Daley, moved
into resource project finance with National Australia Bank,
Chase Manhattan and from 1999 was a Director of the Mining
Team at Barclays Capital in London.
From his return to Australia in 2003 until retiring from full-time
work in mid 2009 he was Director of Investor Resources, a
Company based in Melbourne which provided financial
advisory services to the resources industry globally.
Mr Daley is a member of the Audit and Risk Committee and
the Remuneration Committee.
Other Current Directorships of ASX Listed Companies
Mr. Daley is the Non-Executive Chairman of PLD Corporation
Limited.
Former Directorships of ASX Listed Companies in last three
years
PanAust Limited (appointed August 2004, retired May 2012).
John Taylor
BENG (CHEM)
MBA
Non-executive Director
Appointed 28 July 2009
Mr Taylor retired in 2010 from a long career as Managing
Director of Outotec Australasia Pty Ltd (previously Outokumpu
Technology and prior to that, Lurgi Australia). He has held
senior positions in management, process engineering and
plant construction, primarily in the mining, minerals processing
and environmental sectors.
He was previously a non-executive director of listed companies
Ticor Ltd and Environmental Group Ltd.
Mr Taylor is Chair of the Remuneration Committee.
Other Current Directorships of ASX Listed Companies
th
Heemskirk Consolidated Ltd appointed 9 May 2011.
Former Directorships of ASX Listed Companies in last three
years
None.
1
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT (CONTINUED)
DIRECTORS (CONTINUED)
Christoper Bain
B APP SC (APP GEOL)
GRAD DIP (GEOSC)
MAUSIMM
MAICD
Non-executive Director
Appointed 5 September 2013
Chris Bain is a geologist and mineral economist. He has over
30 years’ experience in resources having worked in
underground mine geology in Mt Isa and Tasmania and
exploration around Broken Hill. Since joining the finance
sector he has been instrumental in mining project divestitures
and acquisitions, evaluations and valuations, capital raisings
including several initial public offerings and ASX listings.
Chris is currently a member of the Australasian Institute of
Mining and Metallurgy and the Australian Institute of
Company Directors.
Mr Bain is Chair of the Audit and Risk Committee and a
member of the Sustainability Committee.
Other Current Directorships of ASX Listed Companies
PLD Corporation Limited.
Former Directorships of ASX Listed Companies in last three
years
In the past 3 years he has been a director of Dart Mining NL
resigning on the 18 February 2014.
Brad Ellis
BAPPSC (EXTRACTIVE
METALLURGY)
GRAD DIP (APPFIN INV)
FAUSIMM
FSIA
Non-executive Director
Appointed 5 November 2013
Mr. Ellis has a Bachelor of Applied Science in Extractive
Metallurgy and a Graduate Diploma in Applied Finance and
Investment. With over 30 years’ experience in the mining
industry, Brad is currently a partner in West Australian
consultancy Scott Dalley Francks. Brad’s technical
experience has focused on feasibility study preparation and
management, plant design, commissioning, management
and
optimisation
for
mineral
processing
and
hydrometallurgical plants; and project evaluations.
Mr Ellis is Chair of the Sustainability Committee and a
member of the Audit and Risk Committee.
Other Current Directorships of ASX Listed Companies
Atlantic Limited.
Former Directorships of ASX Listed Companies in last three
years
None.
2
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS’ REPORT (CONTINUED)
DIRECTORS (CONTINUED)
Simon Milroy
BENG (MINING)
Managing Director
Appointed 14 May 2007
Mr Milroy is a mining engineer who previously spent nearly 4
years as General Manager – Project Development and
Manager Technical Services for Pan Australian Resources
Limited in Laos. In those roles he was responsible for
scoping and feasibility studies, evaluations of projects and
companies, ore reserves and technical support of the
company’s operations. During that period key achievements
were managing the feasibility studies and environmental and
social impact assessments for the Phu Bia gold mine and the
Phu Kham copper-gold mine.
Other Current Directorships of ASX Listed Companies
None.
Former Directorships of ASX Listed Companies in last three
years
None.
COMPANY SECRETARY
Kylie Anderson
BSC. MBA (INT. BUS.) MPA,
MAICD
Ms Anderson has held senior financial and company
secretarial roles with a number of companies in the
resources sector including Felix Resources and Rio Tinto.
Appointed 2 January 2008
INTERESTS IN THE SHARES AND OPTIONS OF THE COMPANY AND RELATED BODIES
CORPORATE
At the date of this report, the interest of the directors in the shares and options of KGL
Resources Limited are:
Director
Ordinary shares
Options over
ordinary shares
A Daley
1,000,000
200,000
J Taylor
782,355
100,000
C Bain
125,000
-
B Ellis
200,000
-
S Milroy
427,044
1,400,000
MEETINGS OF DIRECTORS
The number of directors’ meetings held during the financial year and the number of meetings
attended by each director while they were a director were as follows:
Held
Attended
A Daley
13
13
J Taylor
13
12
C Bain
13
13
B Ellis
13
13
S Milroy
13
13
Directors
3
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS REPORT (CONTINUED)
MEETINGS OF DIRECTORS (CONTINUED)
Committee membership and meetings
The members of the Committees are the independent directors, Andrew Daley, John Taylor,
Chris Bain and Brad Ellis. Mr Chris Bain is the Chairman of the Audit and Risk Committee
along with Andrew Daley and Brad Ellis as members. Mr John Taylor is the Chairman of the
Nomination and Remuneration Committee along with Andrew Daley as a member.
A Sustainability Committee was formed during 2014 and held its first meeting in January 2015.
Brad Ellis is the Chairman of this committee with Chris Bain as a member.
Audit and Risk
Committee
Nominations and
Remuneration Committee
Held
Attended
Held
Attended
A Daley
2
2
2
2
J Taylor
-
-
2
2
C Bain
2
2
-
-
B Ellis
2
2
-
-
Directors
CORPORATE INFORMATION
Principal activity
The principal continuing activity of the Group during the year was exploration and development
of the Jervois multi-metal project in the Northern Territory.
Employees
The Group employed 7 employees as at 31 December 2014 (2013: 12 employees).
DIVIDENDS
No dividends in respect of the current year have been paid, declared or recommended for
payment.
REVIEW OF OPERATIONS
During 2014, the Company maintained a strong focus on the exploration drilling and other prefeasibility studies of the Jervois Project (Jervois or the Project) in the Northern Territory, with
considerable success.
The completion of the sale of the Murchison Gold Project early in the year for $15 million
contributed to the Company’s ability to fund drilling at Jervois and other costs from cash
reserves.
The drilling programs greatly enhanced the potential of Jervois as a mid-sized, multi-metal
mining project. During the year,
The Project’s estimated Resources were increased by more than 60% increase.
A Pre-Feasibility Study (PFS) update found Jervois to be a technically and
commercially feasible project with strong upside for a larger and more valuable asset
through further drilling and metallurgical work.
The Company committed to a new drilling program and other work to increase and
upgrade the Resource and further improve the project’s economics ahead of mine
development.
4
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS REPORT (CONTINUED)
REVIEW OF OPERATIONS (CONTINUED)
Early in the year, drilling confirmed massive sulphides containing copper, lead and zinc at
Marshall-Reward. This was followed by the discovery of the nearby East Reward copper
deposit. Electromagnetic Surveys also indicated probable copper extensions 500 metres north
of Reward, as well as other extensions at Marshall-Reward, Green Parrot and Bellbird.
To ensure that the new information was fully included in Resource calculations, finalisation of
the Resource update was rescheduled from the second to the third quarter of the year.
The intensive drilling indicated extensions at depth, laterally and along the 12km strike,
between and beyond the main, currently known deposits.
As an example, at the northern end of Marshall-Reward, Hole RJ237W1 intersected 25m @
1.74% copper, 35.9 g/t silver and 0.82 g/t gold from 518m, including 8m @ 3.96% copper, 82.2
g/t silver and 2.38 g/t gold (with 1m assays of up to 5.08 g/t gold) from 531m.
At Bellbird, drill results included 4m @ 4.91% copper, 55.3 g/t silver and 0.04 g/t gold from
253m (Hole KJC031), and 3m @ 4.7% copper, 14.5 g/t silver and 0.06 g/t gold from 398m
including 1m @ 12.05% copper, 33.7 g/t silver and 0.14 g/t gold (Hole KJC056).
In September 2014, the Company announced an increased Resource, comprising:
An 85% increase in total Resource tonnes to 25.3 million tonnes @ 1.1% copper and
22.1 grams per tonne silver.
This resulted in:
64% increase in contained copper to 280,000 tonnes.
61% increase in contained silver to 18 million ounces.
A 150% increase in contained lead/zinc to 120,000 tonnes and
A 63% increase in contained gold to 113,000 ounces
At the same time the additional Exploration potential was increased to 50,000 to
150,000 tonnes copper and 2 to 7 million ozs silver*
*The potential quantity and grade of the Exploration Potential is conceptual in nature and there
has been insufficient exploration to define a Mineral Resource. It is uncertain if further
exploration will result in the determination of a Mineral Resource.
The subsequent update of the PFS, based on the new Resource, was released in December
2014.
In summary, Jervois was found to be a viable project with strong upside potential from
additional planned drilling and metallurgical work. The development of a copper mine and
concentrator was shown to be technically and commercially feasible, with
Throughput estimated at 2 million tonnes per year over an initial 7 year mine life (4.5
years open cut)
Production of approximately 21,000 tonnes per year copper and 1 million ounces per
year silver in concentrate plus gold, lead and zinc
Initial capital expenditure estimated at A$189M including A$22M in contingency
Estimated C1 cash costs of US$1.51/lb (after by-product credits and using an
exchange rate of A$/US$ 0.845 and silver price of US$20/oz).
Studies highlighted that the Project’s value would be improved markedly by further drilling and
metallurgical work aimed at increasing resources/reserves and mine life, increasing metal
recoveries, reducing operating costs, and reducing capital costs.
The Board subsequently approved an additional work program targeting $100M to $200M of
additional free cash flow over the life of the Project. The estimated cost $3.1M and it is being
funded from existing cash reserves.
5
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS REPORT (CONTINUED)
REVIEW OF OPERATIONS (CONTINUED)
The additional work, now well under way, is not only designed to increase Resources, extend
the mine life, prolong open pit production, increase recovery rates of copper, silver and gold,
maximise the treatment of the transitional ore, produce a readily marketable bulk lead-zinc
concentrate, and reduce both capital and operating costs.
The drilling program is designed to optimise the Marshall-Reward, Bellbird and Green Parrot
open pits, drill the southern end of the Marshall deposit and the gap between the Marshall and
Green Parrot deposits to extend the resource, drill at Bellbird to add high grade copper stopes
to the underground and increase lead-zinc resources at Bellbird North, and at Marshall, drill to
extend high grade stoping areas and increase silver-lead-zinc resources.
Only exploration results received prior to July 2014 were included in the Resource update on
which the PFS update was based. Infill and resource extension drilling reported subsequent to
the update, in the second half of the year, produced very high grade, shallow intersections
within the pit outlines. These included high grade copper, lead, zinc, silver and gold in the
Reward pit and at Green Parrot.
At Reward, drill results included 7m @ 7.27% copper, 1.12% lead, 1.35% zinc, 140.2 g/t silver
and 0.38 g/t gold from 8m (Hole JOC028) including 2m @ 20.98% copper, 1.53% lead, 1.11%
zinc, 302.5 g/t silver and 0.77 g/t gold.
High grade lead and zinc were intersected at Reward in Hole JOC026: 18m @ 0.26% copper,
16.39% lead, 0.95% zinc, 279.1 g/t silver and 0.13 g/t gold from 33m (Hole JOC026) including
6m @ 0.57% copper, 37.72% lead, 1.92% zinc, 551.5 g/t silver and 0.22 g/t gold from 39m
including 50.7% lead within the interval.
Also at Reward, the highest silver grade so far at Jervois was intercepted: 9m @ 0.59% copper,
0.83% lead, 1.17% zinc, 419.7 g/t silver and 0.5 g/t gold from 14m (Hole JOC266) including 1m
@ 2.71% copper, 15.7% lead, 0.28% zinc, 2350 g/t silver and 2.01 g/t gold from 19m.
High copper, silver and gold grades were intersected at Reward over a broad interval with an
exceptionally high grade gold zone discovered: 28m @ 1.55% copper, 0.14% lead, 0.13% zinc,
37.8 g/t silver and 2.49 g/t gold from 2m (Hole JOC268) including 2m @ 2.24% copper, 0.15%
lead, 0.13% zinc, 24.2 g/t silver and 27.85 g/t gold from 28m.
Near surface drilling at Green Parrot combined high grade results for all metals in Hole
JOC176: 6m @ 8.55% copper, 15.08% lead, 10.95% zinc, 679.7 g/t silver and 4.87 g/t gold
from 48m incl. 25.7 g/t gold within the interval including 3m @ 12.38% copper, 22.15% lead,
16.78% zinc, 963.3 g/t silver and 1.01 g/t gold from 49m.
Drilling north of the Green Parrot deposit and just south of Marshall-Reward included 18m @
4.92% copper, 1.54% lead, 0.75% zinc, 240.5 g/t silver and 0.14 g/t gold from 10m (Hole
JOC062) including 2m @ 31.5% copper (the highest copper grade recorded at Jervois), 5.96%
lead, 1.77% zinc, 1,240 g/t silver and 0.07 g/t gold.
High grade results of near surface drilling at Bellbird indicated the potential for open pit mining.
Among them were 13m @ 5.75% copper, 23.2 g/t silver and 0.32 g/t gold from 20m (Hole
JOC090) including 3m @ 11.55% copper, 55.7 g/t silver and 0.52 g/t gold, and 7m @ 8.88%
copper, 96.5 g/t silver and 0.29 g/t gold from 23m (JOC304).
Assays from the first deep diamond hole at Jervois drilled in September-October 2014
confirmed the continuation of mineralisation at Reward from surface outcrop to 860m depth
where grades of up to 5.94% copper, 17.10% lead, 11.60% zinc and 663 g/t silver (Hole
KJD01W1) were recorded. These intersections, more than 330m below what was previously
the deepest hole, clearly indicate the potential size of this already large mineralised system,
and fit nicely with the current research that is suggesting a SEDEX style deposit.
Adding to the overall potential of Jervois, high grade copper was intersected at the new
prospects of Rockface, Morley and Cox’s Find.
All of this additional work will lead to further resource update in targeted for late June 2015, to
be followed by an updated PFS to be completed later in the third quarter of the year.
6
KGL RESOURCES LIMITED AND ITS CONTROLLED ENTITIES
ABN 52 082 658 080
DIRECTORS REPORT (CONTINUED)
REVIEW OF OPERATIONS (CONTINUED)
In the Solomon Islands, joint venture partner Geodynamics Limited continued to fund and
manage the work on the Savo Island Geothermal Power Project, a potential source of
geothermal power for the capital city, Honiara, and a nearby mine. Development consent was
obtained from the Government, and late in the year the work focussed on obtaining a power
purchasing agreement, a pre-requisite to drilling taking place. KGL is diluting to 30% under a
farm-in agreement with Geodynamics.
FINANCIAL REVIEW
For the year ended 31 December 2014, the KGL Group recorded profit after income tax and
discontinued operations of $3,436,689 (2013: loss of $14,471,412).
In December 2013, KGL executed a binding sale agreement to sell the Murchison Gold Project
to Monument Mining Limited for a total cash consideration of $15M. The transaction was
conditional on obtaining approval from the Foreign Investment Review Board and several other
conditions which are normal for a transaction of this type.
The sale was finalised on 21 February 2014 and thus the profit on sale of $7,330,200 has been
recognised in the results for this year. However, because the assets were written down and a
loss recorded in the prior year, this has resulted in a profit being realised in the current reporting
period.
On the 21 February 2014 entered into a Farm In Agreement with Robust Resources Limited
over the exploration of tenements held by CJSC Kentor. In addition, Kentor Energy entered into
a Farm In Agreement with Geodynamics. As a result of the required accounting treatment for
these two transactions an expense of $896,927 has been recognised in the profit or loss.
Employee expenses from both continued and discontinued operations decreased in the year to
31 December 2014 to $1,659,496 (2013: $2,584,778) due to a reduction in staff at head office
and executive and non-executive directors reducing their remuneration. Employee expenses
from continued operations were $1,642,155 (2013: $2,584,778).
The KGL cash reserve as at 31 December 2014 was $9.934m, including $600,000 and
$292,526 classified as financial assets held to maturity.
CAPITAL RAISINGS / CAPITAL STRUCTURE
No capital raising or changes in capital structure have occurred during the current year or
subsequent to year end.
Summary of shares and options on issue
As at the date of this report there were 141,540,563 ordinary shares on issue, 900,000
performance rights and 1,899,842 unissued ordinary shares in respect of which the options
listed below were outstanding.
Expiry date
Number
Exercise price
$
500,000
Share your feedback
Discover