Investor Presentation
Released
Released
Announcement PDF
JERVOIS
PRE-FEASIBILITY
STUDY
October 2015
Contents
2
Corporate Overview
P3
Mineral Resource
P17
Introduction
P5
Ore Reserve
P19
Location Plan
P6
Comparative Analysis
P20
PFS Key Metrics
P7
Site Layout
P24
Capital Costs
P8
Exploration
P27
Operating Costs
P9
3D Fly Through
P28
Processing Plant Layout
P10
Production Schedule
P12
Concentrate Production
P13
Project Cash Flow
P14
Project Schedule
P15
Sensitivity Analysis
P16
Corporate Overview
ASX CODE
KGL
Issued shares
141.5 million
Options
BOARD OF DIRECTORS
Simon Milroy – Managing Director
2.8 million
Chris Bain – Acting Chairman
Share Price
Market Capitalisation
(20 Oct 15)
$20 million
Cash
(30 June 2015)
$4.8 million
Debt
3
14 cents
Nil
Brad Ellis – Non-executive Director
John Taylor – Non-executive Director
Denis Wood – Non-executive Director
Corporate Overview
$0.50
15.0
$0.45
13.5
$0.40
12.0
4
$0.30
Volume
Price
10.5
9.0
$0.25
7.5
$0.20
6.0
$0.15
4.5
$0.10
3.0
$0.05
1.5
$0.00
0.0
Trading Volume (million)
Share Price
$0.35
TOP 4 SHAREHOLDERS
KMP Investments
27.03%
HSBC Custody Nominees
(Australia) Limited
11.49%
J P Morgan Nominees
Australia Limited
7.35%
Coal Industry Services Pty Ltd
1.80%
Introduction - Jervois Copper Project
KGL Resources has
completed a Pre Feasibility
Study on the Jervois
Copper Project
A series of open pit and
underground mines will
feed a 2.2 Mtpa flotation
concentrator to produce a
copper concentrate.
5
Location
Located on existing
mining licenses.
Copper concentrate to
be transported by
road to Alice Springs
then by rail to Darwin
for export.
6
PFS Key Metrics
LIFE OF MINE
Copper Resource
Lead/Zinc Resource
26.7 Mt @ 1.12% Cu and 17 g/t Ag
3.8 Mt @ 0.72% Cu, 3.7% Pb, 1.2% Zn, 68 g/t Ag
Mine Life
8.25 years
Average Annual Production
LOM C1 – Cash Costs
US$0.88/lb
A$1.26/lb
LOM C3 – Total Costs
US$2.13/lb
A$3.04/lb
Gross Revenue (net of
TC/RC)
A$2.4 billion
Operating Cash Flow
A$807m
Pre-Production Capital
Costs
A$189.5m
Deferred Capital Costs
A$26.7m
NPV
A$248m
Payback Period
3.2 years
IRR
7
21,000t Cu + by-products
35%
Capital Costs
CAPITAL COST
8
A$
Treatment plant
$89.6m
Infrastructure
$23.0m
Mining
$1.4m
Construction
$22.2m
EPCM
$19.8m
Owner’s costs
$10.2m
Sub-total
$166.2m
Contingency (14.0%)
$23.2m
Project Total
$189.5m
Operating Costs
COSTS
US$ *
A$
Mining
$0.60
$0.85
Processing
$0.58
$0.82
General & Admin
$0.11
$0.16
Marketing & Transport
$0.68
$0.97
By-products credits
($1.09)
($1.55)
C1 – Cash Costs
$0.88
$1.26
Depreciation & Amortisation
$1.00
$1.43
NT State Royalties
0.25
0.34
C3 – Total Costs
$2.13
$3.04
* Assuming an A$/US$ exchange rate of 0.70
9
Processing Plant – Copper Only
10
Processing Plant – incl. Lead Zinc
11
Production Schedule
1.0
0.9
0.8
Ore Mined (Mt)
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q16 Q17 Q18 Q19 Q20 Q21 Q22 Q23 Q24 Q25 Q26 Q27 Q28 Q29 Q30 Q31 Q32 Q33
Reward OP
12
Reward UG
Bellbird OP
Bellbird UG
Green Parrot OP
Concentrate Production
160
140
120
TONNES ('000)
100
80
60
40
20
0
Yr 1
Yr 2
Yr 3
Yr 4
Yr 5
Copper
13
Lead - Zinc
Yr 6
Yr 7
Yr 8
Yr 9
Project Cash Flow
$600
$500
$400
A$ million
$300
$200
$100
$-
Yr -2
Yr -1
Yr 1
Yr 2
Yr 3
Yr 4
Yr 5
Yr 6
Yr 7
Yr 8
Yr 9
$(100)
$(200)
Sales revenue
$(300)
14
Operating activities
Capital investment
Rehabiliation
Cumulative Cashflow
Project Schedule
ACTIVITY
2016
Commence DFS
1Q*
2017
Commence FEED
1Q
Project Award – Start Detailed Design
2Q
Award Long Lead Items
2Q
Engineering & Procurement Completed
Commence Site Earthworks
2Q
3Q
Mechanical Completion
3Q
First Production
4Q
* Subject to financing
15
2018
Sensitivity Analysis
A$/US$ EXCH. RATE
US$ COPPER PRICE
$2.50
$3.00
$3.25
$3.50
0.70
0.70
0.70
US$/lb
3.25
3.25
3.25
US$/t
7,165
7,165
7,165
Lead
US$/t
2,225
2,257
2,299
Zinc
US$/t
2,707
2,727
2,624
Silver
US$/oz
19.97
20.39
19.94
Gold
US$/oz
1,300
1,311
1,269
UNIT
$4.00
A$/ US$
Copper
0.75
11%
23%
29%
35%
45%
0.70
17%
29%
35%
41%
52%
0.65
23%
35%
42%
48%
59%
0.60
29%
42%
49%
55%
67%
NPV (10%) * (A$m)
0.75
10
126
184
242
357
0.70
62
186
248
310
434
0.65
122
255
322
388
522
0.60
191
335
408
480
624
0.75
149
343
441
538
733
0.70
238
447
551
655
864
0.65
341
566
678
791
1,016
0.60
462
705
827
949
1,192
Free Cash Flow * (A$m)
16
2019
ASSUMPTIONS
IRR (%)
* Before interest and tax
2018
2020
&
LOM
Mineral Resource
30.5 Mt @ 23 g/t Ag for 23 Moz Ag
30.5 Mt @ 1.1% Cu for 327,000 t Cu
30
400,000
25
350,000
300,000
Million Ounces
Copper Metal (tonnes)
450,000
250,000
200,000
150,000
20
15
10
100,000
5
50,000
0
0
May
2011
July
2011
Copper Indicated
17
Jan
2012
Nov
2012
Copper Inferred
Sep
2014
Jul
2015
Exploration Potential
May
2011
July
2011
Silver Indicated
Jan
2012
Nov
2012
Silver Inferred
Sep
2014
Jul
2015
Exploration Potential
Mineral Resource
Copper Resources
Marshall Copper
Reward Copper
East Reward
Bellbird
Cox’s Find
Rock Face
TOTAL
Lead/Zinc Resources
Reward Lead/Zinc
Green Parrot
Lead/Zinc
Bellbird North
TOTAL
2015 Combined
18
Category
Mt
Cu %
Ag g/t
Pb %
Zn %
Copper kt
Silver Moz
Lead kt
Zinc kt
Indicated
Inferred
Indicated
Inferred
Inferred
Indicated
Inferred
Inferred
Inferred
Indicated
Inferred
TOTAL
1.4
0.3
5.0
7.6
2.0
4.1
4.3
0.7
0.7
10.5
16.2
26.7
1.45
0.90
1.14
1.02
0.82
1.22
1.29
0.87
0.82
1.21
1.06
1.12
35.6
20.2
25.3
22.2
7.1
7.7
8.5
2.8
3.1
19.8
14.6
16.6
-
-
20.1
2.5
57.1
78.0
16.9
49.9
55.9
6.0
6.0
127.0
172.1
299.1
1.6
0.2
4.1
5.4
0.5
1.0
1.2
0.1
0.1
6.7
7.6
14.3
-
-
Category
Mt
Cu %
Ag g/t
Pb %
Zn %
Copper kt
Silver Moz
Lead kt
Zinc kt
Indicated
Inferred
Indicated
Inferred
Inferred
Indicated
Inferred
TOTAL
0.5
0.8
0.5
1.4
0.7
1.0
2.8
3.8
0.74
0.51
0.99
0.81
0.57
0.87
0.67
0.72
70.7
90.9
64.0
78.0
17.9
67.3
67.6
67.5
6.8
8.6
0.9
1.8
1.7
3.8
3.7
3.7
0.9
1.2
0.6
0.9
2.5
0.8
1.4
1.2
3.6
4.1
5.1
11.1
3.8
8.7
19.0
27.7
1.1
2.3
1.1
3.4
0.4
2.2
6.2
8.4
33.6
69.4
4.7
24.4
11.3
38.3
105.1
143.4
4.4
9.4
3.2
12.8
16.7
7.6
38.9
46.5
TOTAL
30.5
327.0
22.6
143
47
Cut-off
Cu%
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Cut-off
Cu%
None
None
0.3
0.3
0.2
-
Ore Reserve
19
COPPER RESERVES
CATEGORY
MT
Cu %
Au g/t
Ag g/t
Pb %
Zn %
Bellbird
Probable
3.4
1.20
0.12
7.4
0.02
0.05
Marshall-Reward
Probable
5.0
1.07
0.26
25.0
0.22
0.21
TOTAL
Probable
8.4
1.12
0.20
17.9
0.14
0.14
LEAD/ZINC RESERVES
CATEGORY
kT
Cu %
Au g/t
Ag g/t
Pb %
Zn %
Bellbird
Probable
239
0.57
0.03
20.0
2.27
3.04
Marshall-Reward
Probable
205
0.91
0.20
62.7
5.38
0.83
TOTAL
Probable
444
0.77
0.13
45.49
4.13
1.72
Australian Copper Mines and Projects
2.0
Nifty
Underground
OP+UG
Open Pit
1.8
Copper Grade (%)
1.6
Sulphur Springs
Tritton
Mutooroo
Eloise
1.4
Mount Oxide
1.2
Jervois
1.0
Osborne
Mt Lyell
Mt Gunson
Horseshoe Lights
0.8
0.6
0.4
0.2
0.0
10,000,000
White Range
Einasleigh
North Portia
Huckitta
Stavely
Mt Gordon
Maroochydore
E1-MonakoffLady Annie
Kanmantoo
Mount Isa (HMX)
Mary Kathleen
Coulston Lakes
Prominent Hill
Browns
Cloncurry Hillside
Mt Elliott
Kalkaroo
Copper Hill
Walford Creek
Nanadie Well Bushranger
Rocklands
Temora
100,000,000
Mineral Resources (tonnes, log scale)
Source: SNL Mining & Metals, Terra Studio. Most recent mineral resources available, copper only. Bubble size according to copper metal contained.
Excluded mines and projects: Carrapateena, Cobar, DeGrussa, Golden Grove, Northparkes, Olympic Dam, Stockman
20
Low Capital Intensity
$30,000
Capital Intensity of Selected Projects
Capital Intensity (US$/t)
$25,000
$20,000
$15,000
JERVOIS
$10,000
$5,000
$0
Producer
21
In Construction
Feasibility / Financing
Source: Terra Studio, Wood Mackenzie
Long Term C1 Cost Curve
US¢/lb
Jervois C1 Cost US88¢/lb
Negative C1 costs here are due to high by product credits
Source: Terra Studio, Wood Mackenzie. Highly probable and probable mines only
22
Global Grade Ranking
3.0
Size and grade of undeveloped copper projects
Copper Grade (%Cu)
2.5
2.0
First Quartile
1.5
JERVOIS 1.12%
Second Quartile
Third Quartile
Fourth Quartile
1.0
Weighted Average: 0.53% Cu
0.5
0.0
0
100
200
300
400
500
600
700
Copper Contained in Resources (Mt)
Source: SNL Mining & Metals, Terra Studio. Undeveloped copper projects with more then 250,000t of contained copper metal (open pit only)
Source: SNL Mining & Metals, Terra Studio. Undeveloped copper projects with more then 250,000t of contained copper metal (open pit only)
23
Reward Prospect Looking South
REWARD
MARSHALL
COX’S FIND
GREEN PARROT
Outcropping Copper Mineralisation
24
ROCKFACE
BELLBIRD
Green Parrot & Marshall Reward
25
Bellbird & Bellbird North
26
Exploration
• Soils and RAB results highlight new
prospects
• DHEM commenced at Rockface and
Green Parrot
• Extension of 3D IP
– All holes targeting chargeability
anomalies intersected copper
mineralisation
• Gravity Survey – high density targets
due to:
– Mineralisation (copper/lead/zinc
sulphides)
– Alteration (magnetite/garnet)
27
3D Project Fly Through
Play Movie
28
Movie is available at www.kglresources.com.au
For more information contact
SIMON MILROY
• +61 7 3071 9003
• info@kglresources.com
• www.kglresources.com
Level 7, 167 Eagle Street
Brisbane, QLD 4000
AUSTRALIA
ASX CODE: KGL
29
Forward-Looking Statements:
This presentation includes certain “Forward-Looking Statements”. All statements, other
than statements of historical fact, included herein, including without limitation, statements
regarding forecast cash flows and potential mineralisation, resources and reserves,
exploration results and future expansion plans and development objectives of KGL
Resources are forward-looking statements that involve various risks and uncertainties.
There can be no assurance that such statements will prove to be accurate and actual
results and future events could differ materially from those anticipated in such statements.
Competent Person Statement
The Jervois Resources information and Exploration Potential were first released to the market on 29 July 2015 and complies with JORC 2012. The
company confirms that it is not aware of any new information or data that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.’
The Jervois Reserves information was first released to the market on 16 October 2015 and complies with JORC 2012. The company confirms that it
is not aware of any new information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.’
The Jervois Pre-feasibility information was first released to the market on 16 October 2015 and complies with JORC 2012. The company confirms
that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.’
30