Jervois Pre-Feasibility Study shows strong economics
Released
Released
Announcement PDF
www.kglresources.com.au
16 October 2015
Pre‐Feasibility Study shows strong economics of KGL’s Jervois
Copper‐Silver Project
Low C1 cash cost of US$0.88/lb over mine life
3.2 years payback
A$807M operating cash flow
KGL Resources Limited (KGL) is pleased to announce the results of the completed Pre‐Feasibility Study (PFS)
of KGL’s 100% owned Jervois Copper‐Silver Project in the Northern Territory.
The initial PFS, announced in December 2014, found Jervois to be technically and commercially feasible.
Work since then has enhanced the project significantly.
Simon Milroy, Managing Director of KGL, commented:
“Jervois is confirmed as a robust, mid‐level scale mining project with an initial annual production of
more than 20,000 tonnes of copper, one million ounces of silver, plus lead and zinc, with a mine life
of more than 8 years.”
“In 2015, we increased and upgraded the mineral resource, simplified the metallurgical processing
and reduced the operating costs.”
“The additional studies now show Jervois to be:‐
a conventional copper flotation project with strong economics
with a C1 (cash) cost of US$0.88/lb and C3 (including depreciation, amortisation and
royalty) cost of US$2.13/lb
among the lowest cost of the world’s probable new mines.”
“The PFS benefited from the upgrading of mineral resources and increases in silver, lead and zinc
tonnages.”
“With 12km of strike length, all current orebodies remain open, and the potential for substantial
new discoveries is demonstrated by the recent intersection at the Rockface prospect in an area that
is not included in the current mining inventory used in the PFS. The strongly mineralised 14m
intersection is currently being assayed.”
1|Page
www.kglresources.com.au
Table 1. Key Project Metrics
Key Life of Mine (LoM) Highlights
Resource – Copper
– Lead/Zinc
26.7Mt @ 1.12%Cu, 16.6g/tAg
3.8Mt @ 0.72%Cu, 3.7%Pb, 1.2%Zn, 67.5g/tAg
LoM*
Average Annual Production
LoM C1 Cash Cost
LoM C3 Cash Cost
8.25 years
21,000t Cu
US$ 0.88/lb
US$ 2.13/lb
Copper Price**
Silver
Gold
FX – Exchange (A$:US$)
US$ 3.25
US$ 19.94 / oz
US$ 1,269 /oz
1A$:0.7US$
Gross Revenue (net TC and RC’s)
Operating Cash Flow
A$ 2,392m
A$ 807m
Pre‐Production Capital Costs
Deferred Capital Cost (Year 2)
A$ 189.5m
A$ 26.7m
NPV (10% Discount rate)
Payback Period
IRR
A$ 248m
3.2 years
35%
*The LoM schedule is derived from a mining inventory of which 56.5% is Indicated Resources and 43.5% is Inferred Resources, the
LoM mining inventory does not constitute an Ore Reserve. There is a low level of geological confidence associated with Inferred
Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised.
** The commodity prices were based on the mean value of the long term (beyond 2020) forecast price of each metal from a number
of international banks and investment firms as compiled by Concensus Economics Prices were quoted in nominal US dollars, metal
prices in real US dollars will be accounted for through the application of a discount rate.
Significant growth potential
Recent exploration successes at Rockface, Green Parrot and Bellbird East offer the potential for additional
high grade, relatively shallow resources that could feed into the early part of the mine schedule and further
enhance the Project’s economics.
2|Page
www.kglresources.com.au
1. INTRODUCTION
The Jervois Copper Project is located approximately 380km by road north‐east of Alice Springs in the
Northern Territory of Australia, with road access from Alice Springs via the Stuart and Plenty Highways, as
depicted in Figure 1.
Figure 1. Jervois Location Map
The Jervois Project will consist of open pit mining of several deposits followed by underground mining to
feed a 2.2Mtpa flotation plant producing 80‐100,000 tpa of copper concentrate plus a separate lead/zinc
bulk concentrate.
The Jervois Project is forecast to produce a total of 754,000 tonnes of copper concentrate at a grade of
approximately 23% copper and 283 g/t silver over an initial life of 8.25 years*. This equates to an annual
average production of 21,000 tonnes of contained copper and 1 million ounces of contained silver. The
Jervois Project will also produce approximately 179,000 tonnes of bulk concentrate at a grade of 43% lead,
17% zinc and 1,069 g/t silver over the LoM.
The PFS is based on an Indicated and Inferred resource of 30.5Mt containing 327,000 tonnes of copper,
22.6Moz silver, 143,000 tonnes of lead and 47,000 tonnes of zinc (Table 2).
* The Mineral Resources underpinning this production target have been prepared by a competent person in
accordance with the requirements of Appendix 5A JORC Code. The mining inventory on which the production target is
based is derived from 56.5% Indicated Resources and 43.5% Inferred Resources. The above figures do not constitute an
Ore Reserve. There is a low level of geological confidence associated with inferred mineral resources and there is no
certainty that further exploration work will result in the determination of indicated mineral resources or that the
production target itself will be realised.
3|Page
www.kglresources.com.au
Sections of this pre‐feasibility report (Report) have been compiled with information provided by the
following companies:
Geology
KGL
Mineral resource
H&S Consultants
Mining
Auralia Mining Consulting
Metallurgy
Minelogix
Process plant
Lycopodium
Process plant infrastructure
Lycopodium
Tailings management and related infrastructure
Knight Piésold
Environmental, social and permitting
KGL
Transport and marketing
Solutions Development & KGL
Capital and operating cost estimates
Lycopodium
Figure 2. Site Layout
2. GEOLOGY
The Jervois Project is located on two Mineral Licences (ML 30180 and ML 30182) and one Mineral License
Application (MLA 30829) located within EL 25429 held by Jinka Minerals, a subsidiary of KGL Resources.
Base metal mineralisation at Jervois is hosted by a lower‐to‐middle amphibolite grade metasedimentary
sequence of the Bonya Metamorphics. The Bonya Metamorphics is a unit in the Aileron Province of the
Palaeoproterozoic eastern Arunta Region that reached peak metamorphism during the regionally extensive
high‐T low‐P Strangways Event. The base metal mineralisation at Jervois is stratabound and contained
within steeply dipping lenticular bodies (lodes) of calc‐silicate, garnet‐chlorite‐magnetite rock and garnet‐
magnetite quartzite, within a thick succession of spotted andalusite‐cordierite schist and quartz‐sericite‐
magnetite schist. The mineralised sequence has a strike length of some 12km and a stratigraphic thickness
up to about 600m.
4|Page
www.kglresources.com.au
3. HISTORY
Copper was discovered at Jervois in 1929 during mustering of stray cattle on a track leading from
Tobermorey on the Northern Territory – Queensland border. In the 1950s, leases covering the area were
acquired by Kurt Johannsen, who mined copper carbonate on a small scale for the fertilizer industry and
later as a flux used in the smelting process at Mount Isa.
The first modern exploration was conducted by New Consolidated Goldfields (Australasia) Pty Ltd from
1961 – 1965. Exploration continued sporadically through to 1980 when the project was acquired by Plenty
River Mining. A treatment plant designed to treat Green Parrot lead‐zinc‐copper‐silver ore was completed
in early 1982 and was successfully commissioned in April, but was placed on care and maintenance within
12 months following a sharp decline in the lead price.
Over the next 20 years, a succession of companies conducted exploration at Jervois including Normandy
Poseidon, MIM Exploration and Jinka Minerals. In May 2011, Jinka Minerals was acquired by KGL for
A$12.8m and since that time approximately A$21.3m has been spent on exploration and project
development. KGL has conducted drilling programs each year since the acquisition and has steadily
increased the size and confidence of the resource. Reverse circulation (RC) drilling and diamond drilling has
been used for resource definition and exploration. Samples generated from RC and diamond drilling were
analysed by the ALS Laboratory and a QA / QC procedure has been applied on all samples used for the
resource estimation.
KGL considers good potential remains to increase the global resource with further exploration. This can be
achieved by extending existing resources or by discovering new mineralised trends. Resource definition
drilling and geophysics at the existing resources at Marshall‐Reward, Bellbird, Rockface and Green Parrot,
has identified targets along strike and at depth that will be tested with drilling. Soil sampling, RAB drilling
and detailed geological mapping of KGL’s tenements has also located new mineralised trends that remain
to be drill tested.
4. RESOURCE
H&S Consultants Pty Ltd (“H&SC”) was commissioned by KGL to complete updated mineral resource
estimates for the Jervois Project. The target commodity is copper with subordinate silver, lead, zinc and
gold.
A total of five deposits comprise the Jervois Project, namely Marshall‐Reward (including Reward East and
Sykes), Green Parrot, Bellbird including Bellbird North, Rockface and Cox’s Find. The current round of work
involved updated resource estimates for most of the lodes including Marshall, Reward, Reward East (two
lodes), Sykes (maiden resource), Green Parrot (two lodes), Bellbird (four lodes) and Bellbird North.
The new resource estimates are based on 15,187 one metre composites from the drilling data. Elements
modelled included copper, silver, lead, zinc, gold, sulphur, iron, bismuth, cobalt, tungsten, uranium and acid
soluble copper. Composite extraction for modelling, used mineral wireframes designed to a nominal 0.1%
copper cut‐off (and anomalous silver and/or lead) under limited geological control, including litho‐
geochemical interpretation (where available). Extrapolation of the wireframes beyond the limiting
drillholes was generally <25m in strike and <100m in dip. Modelling consisted of Ordinary Kriging using the
Micromine or GS3M software with the modelled data loaded into Surpac block models.
Modelled gold grades have been included as part of the Marshall‐Reward and Bellbird (including Bellbird
North) resource estimates. The amount of historical gold data is limited and as a result, the gold resource
5|Page
www.kglresources.com.au
estimate is classed as Inferred. A global gold Inferred Resource for the two deposits stands at 21.4Mt at
0.16 g/t totalling 113,000 oz for a copper cut‐off of 0.5%.
Exploration Potential* exists peripheral to the new resource estimates within the current interpreted
mineral wireframes. The Exploration Target for the combined Bellbird and Marshall‐Reward zones for a
0.5% Cu cut‐off is of the order of 4 – 8 Mt at 0.8 – 1.2% Cu, 7 – 15 ppm Ag for 40,000 to 100,000 tonnes of
copper and 1.5 – 3.5Mozs of Ag (Table 2). The lodes are open at depth, and there are additional possibilities
along strike from the deposits based on isolated drill hole information and from interpretations of the
geophysical surveys.
* The potential quantity and grade of the Exploration Target is conceptual in nature and there has been
insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the
determination of a Mineral Resource.
6|Page
www.kglresources.com.au
Table 2. 2015 Jervois Resource Estimate*
Jervois
Copper Resources
Marshall
Copper
Reward
Copper
East Reward
Bellbird
Cox’s Find
Rockface
TOTAL
Jervois
Lead/Zinc Resources
Reward
Lead/Zinc
Green Parrot
Lead/Zinc
Bellbird North
TOTAL
2015 Combined
Category
Tonnes
Mt
1.4
0.3
5.0
7.6
2.6
4.1
4.3
0.7
0.7
10.5
16.2
26.7
Copper
%
1.45
0.90
1.14
1.02
0.92
1.22
1.29
0.87
0.82
1.21
1.06
1.12
Silver
g/t
35.6
20.2
25.3
22.2
8.2
7.7
8.5
2.8
3.1
19.8
14.6
16.6
Lead
%
Zinc
%
Copper
kt
20.1
2.5
57.1
78.0
24.1
49.9
55.9
6.0
6.0
127.0
172.1
299.1
Silver
Moz
1.6
0.2
4.1
5.4
0.7
1.0
1.2
0.1
0.1
6.7
7.6
14.3
Lead
kt
Zinc
kt
Cut‐off
Cu%
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Indicated
Inferred
Indicated
Inferred
Inferred
Indicated
Inferred
TOTAL
Tonnes
Mt
0.5
0.8
0.5
1.4
0.7
1.0
2.8
3.8
Copper
%
0.74
0.51
0.99
0.81
0.57
0.87
0.67
0.72
Silver
g/t
70.7
90.9
64.0
78.0
17.9
67.3
67.6
67.5
Lead
%
6.8
8.6
0.9
1.8
1.7
3.8
3.7
3.7
Zinc
%
0.9
1.2
0.6
0.9
2.5
0.8
1.4
1.2
Copper
kt
3.6
4.1
5.1
11.1
3.8
8.7
19.0
27.7
Silver
Moz
1.1
2.3
1.1
3.4
0.4
2.2
6.2
8.4
Lead
kt
33.6
69.4
4.7
24.4
11.3
38.3
105.1
143.4
Zinc
kt
4.4
9.4
3.2
12.8
16.7
7.6
38.9
46.5
Cut‐off
Cu%
None
None
0.3
0.3
0.2
TOTAL
30.5
327
22.6
143
47
Indicated
Inferred
Indicated
Inferred
Inferred
Indicated
Inferred
Inferred
Inferred
Indicated
Inferred
TOTAL
Category
*These tables may contain minor rounding errors
7|Page
www.kglresources.com.au
5. ORE RESERVES
The Indicated Resource material within the pit designs has been classified as a Probable Ore Reserve. There
are also significant Inferred Resources nearby that are likely be upgraded to Measured and Indicated
Resources before KGL commit to developing the Jervois Project.
The Project Ore Reserves are included in Tables 3 and 4. Due to the processing recovery and processing
costs varying for each element, a single, overall economic cut‐off cannot be calculated. Block model
reports using a range of economic cut‐offs were run to determine which best represented the outputs from
the optimisations; these were then applied to the Ore Reserve designs.
A 0.35% Cu cut‐off was selected for the Marshall / Reward and Bellbird Resources, and a 0.5% Pb cut was
used for the predominantly Pb/Zn Resources to calculate the Reserves. Mining recovery of 95% has been
applied as well as 5% ore losses. The following two tables contain the Copper Ore Reserves and Lead‐Zinc
Ore Reserves respectively. All Ore Reserves are classified as Probable.
Table 3. Copper Ore Reserves
Bellbird
Marshall Reward
Total
3,394,000
5,037,700
8,431,700
Cu %
1.20
1.07
1.12
Au g/t
0.12
0.26
0.20
Ag g/t
7.36
25.00
17.90
Pb %
0.02
0.22
0.14
Zn %
0.05
0.21
0.14
Bellbird
Marshall Reward
Total
239,300
204,700
444,000
Cu %
0.57
0.91
0.77
Au g/t
0.03
0.20
0.13
Ag g/t
19.99
62.67
45.49
Pb %
2.27
5.38
4.13
Zn %
3.04
0.83
1.72
Ore Tonnes
Table 4. Lead / Zinc Ore Reserves
Ore Tonnes
The above Ore Reserve numbers include mining dilution and recovery. Ore Reserve estimates are not precise calculations. Reporting
of tonnage and grade estimates should reflect the relative uncertainty of the estimate by rounding off to appropriately significant figures.
8|Page
www.kglresources.com.au
6. MINING
The information detailed in this section is based on the conceptual LoM work with the inclusion of Inferred
Resources and has been completed separate to and in addition to the Ore Reserve.
Open pit mining is proposed in three locations: Marshall‐Reward, Green Parrot and Bellbird, as shown in
Figures 3,4 & 5. The life of mine waste to ore stripping ratio for the open pits is 7.3 : 1. Open pit mining
continues for the first 6.25 years of the mine life.
The surface mining schedule utilises a fleet of 90 tonne trucks loaded by a Hitachi EX1900 and a Hitachi
EX1200 for the first seven quarters of mine life, after which the EX1900 is decommissioned and removed
from site. The remainder of the open pits are mined with the remaining EX1200 and fleet of 90 tonne
trucks. Mining has been scheduled to start three months prior to steady state production through the
processing plant to ensure sufficient stocks are available on the ROM to maintain a throughput base case
rate of 2.2Mtpa once processing begins and to aid in the blending preferences for the transitional ore.
Underground mining at Bellbird has been delayed for five quarters after completion of the Bellbird open pit
to delay the capital expense associated with underground development. This limits the size of the ore
stockpile while maintaining a high proportion of high‐grade mill feed and results in a shorter period where
both open pit and underground contractors are on site.
Figure 3. Ore Tonnes Mined by Location (Qtr’s)
Underground mining is scheduled to commence in the third year of operations. Long Hole Open Stoping
(LHOS) was selected as the most suitable method to mine the underground deposits at the Jervois Project.
Other mining methods investigated during the optimised PFS work included Sub‐Level Open Stoping (SLOS)
and Benching. Both of these mining methods may still be suitable to exploit specific areas of the
underground reserve and as such will be considered during future work. The nominal level spacing is 30m
from floor to floor. Stope heights range from 20‐40m in a few select stopes.
9|Page
www.kglresources.com.au
The Jervois Project will utilise standard underground mining equipment. The scale of the project leads to
the selection of larger equipment with twin‐boom jumbos used to develop all headings. 17 tonne loaders
(LHDs) will be used to remove blasted rock from all development headings and stopes. Where required,
these LHDs will also be used to backfill stopes with aggregate fill and potentially cemented fill. 50 tonne
trucks will be required to transport the broken rock from underground to the surface stockpile or waste
dump.
Figure 4: Planned Open Pit and Underground Development at the Marshall – Reward deposit (looking
west)
Figure 5: Planned Open Pit and Underground Development at the Bellbird deposit (looking east)
A large long‐hole rig will be used to drill all production holes. The primary production fleet will be
supported by a dedicated charge‐up unit, integrated tool carriers and a grader. Ground control in the
proposed stopes will be a combination of installed ground support in the form of cable bolts, pillars being
left in the narrower or lower grade areas of stopes and backfill, and either cemented or aggregate fill
depending on the location of stopes.
10 | P a g e
www.kglresources.com.au
Stoping will generally commence from the upper stopes and progress down, although this process may be
reversed in certain stoping areas to allow backfill, or due to other operational constraints. Overall stope ore
losses are expected to be 9% (from island and sill pillars and some stope under break). Mining dilution of
10% is expected during the underground mining operations.
7. PROCESSING PLANT
The process plant has been designed to treat a number of different ore types, including primary copper ore,
transition copper ore and lead‐zinc ore. As each of these ore types varies in hardness and/or grind size
requirements, different throughput rates will be achieved for each.
The primary product from the plant will be a copper sulphide concentrate. The concentrate will also
contain variable amounts of bismuth, silver and gold depending on the ore source. During treatment of
lead‐zinc ores, the plant will produce two products: a copper concentrate and a bulk lead‐zinc concentrate
which will also contain the majority of the bismuth, silver and gold (Figure 7).
For primary copper ore, the plant has been designed to accommodate 2.2Mtpa at a head grade of up to
2.00% copper, 0.16% lead and 0.22% zinc. For transition copper ore, the plant will process 2.4Mtpa at a
head grade of up to 2.70% copper, 0.30% lead and 0.16% zinc. For lead‐zinc ore, the plant will treat
1.56Mtpa at a head grade of up to 1.10% copper and 8.1% combined lead plus zinc.
The process plant will comprise the following principal process areas:
•
Primary crushing, crushed ore storage and reclaim.
•
Primary grinding and classification.
•
Rougher and scavenger flotation.
•
Copper regrind.
•
Copper cleaner and scavenger flotation.
•
Lead zinc regrind.
•
Lead zinc cleaner flotation.
•
Copper concentrate thickening and filtration.
•
Lead zinc concentrate thickening and filtration.
•
Concentrates storage and load‐out.
•
Tailings thickening, disposal and decant water return.
•
Process water storage and distribution.
•
Raw water storage and distribution.
•
Reagent make‐up and distribution.
•
High and low pressure air distribution.
A schematic flowsheet for the process plant is presented in Figure 6. The plant will incorporate a
conventional comminution circuit comprising a primary crusher, followed by a SAG mill and a ball mill
which will operate in closed circuit with a cyclone cluster (with provision for a pebble crusher to be installed
in the future).
The flotation circuit design is based on flotation test work conducted at ALS Metallurgy. The remaining unit
processes in the flowsheet, such as copper and lead‐zinc concentrate thickening, copper and lead zinc
concentrate filtration, and tailings thickening, were based on design data from similar plants and are
considered by Lycopodium to be reasonable at the current study’s level of accuracy.
11 | P a g e
www.kglresources.com.au
Figure 6. Schematic Flow Sheet for concentrate production
Figure 7. Concentrate Production (‘000t)
12 | P a g e
www.kglresources.com.au
8. METALLURGY
Primary Copper Ores
Both Marshall‐Reward and Bellbird ores have a similar flotation response for copper and silver minerals.
Greater than 90% copper recovery can be achieved using a primary grind P80 of 120 µm, regrind of rougher
concentrate to a P80 of 53 µm, and a single stage of cleaning. A final concentrate grade of 23% copper is
planned.
Transitional Copper Ores
The flowsheet for treatment of transition ore is compatible with the main sulphide primary copper ore
flowsheet. Flotation residence times for treatment of the transition ore, fit within the primary copper
sulphide ore design envelope.
Lead‐Zinc Ore
The chalcopyrite will be separated from the galena and sphalerite rapidly, with a single stage of cleaning
producing a saleable grade copper concentrate.
The lead and zinc will be floated together from the copper tailings stream rapidly with a single stage of lead
zinc cleaning, producing a saleable grade lead‐zinc concentrate. A bulk lead‐zinc concentrate grade of 60%
combined lead plus zinc is estimated, with recoveries of over 85% for lead, over 58% for zinc and
approximately 70% for silver.
The flowsheet for the lead/zinc ore is compatible with the main primary copper sulphide ore flowsheet.
Green Parrot Ore
The Green Parrot sulphide primary copper and transition ores are compatible with the flowsheet
established for other Jervois ores. Based on the samples tested to date, no regrind or cleaning of copper or
lead‐zinc rougher concentrates will be required, although facilities exist to do so if required.
Table 5. Throughput for various ore types
Throughput
Primary Grind
Deposit
Ore Type
t/h
Mtpa
P80 µm
Marshall‐Reward
Transition
300
2.40
110
Primary
275
2.20
120
Lead‐Zinc Deeps
195
1.56
75+
Transition
300
2.40
110
Primary
275
2.20
120
Transition
275
2.20
90
Primary
250
2.00
120
Bellbird
Green Parrot
9. PERMITTING
Project referral documents were submitted in 2013 to the Federal Department of the Environment and the
Northern Territory Environmental Protection Agency (NT EPA) to determine the impact assessment process
for the project. The Jervois Project will be assessed at the level of Environmental Impact Statement (EIS) by
the NT EPA. No matters of national environmental significance were deemed likely to be impacted by the
project and as such, there will be no Federal involvement in the impact assessment process.
13 | P a g e
www.kglresources.com.au
Project specific Terms of Reference for the EIS have been issued by the NT EPA. Baseline studies for the
Project area have been undertaken. Additional baseline information continues to be collected as part of the
project development process.
Discussions are taking place with the Central Land Council regarding land access, future relationships with
the local communities and benefits arising from the project including commitments to local indigenous
employment and contracting opportunities.
10. CONCENTRATE TRANSPORT
The concentrate transport study concluded that the use of sealed half height containers was the most cost
effective and safest method to transport the concentrate from site to Darwin. The sealed half height
containers will be trucked to Alice Springs and then transported by rail to either Darwin or Adelaide for
export to Asian smelters. This process will eliminate the need for any intermediate enclosed warehousing
at both Alice Springs and at the export port.
11. CONCENTRATE MARKETING
The copper concentrate produced at Jervois is expected to contain approximately 23% copper, with the
only significant penalty element being bismuth. Bismuth contained in the concentrate is likely to attract a
penalty of approximately $4M/pa.
12. CAPITAL COST
The capital cost estimate has been produced based on the requirements to process predominantly primary
copper and transitional copper ore. Table 6 summarises these costs (which exclude any sustaining capital,
taxes or escalation) to an accuracy of ±25%
Table 6. Summary of Copper Plant Capital Costs (3Q15)
Copper Plant
Cost Estimate (A$M)
Direct Costs
Treatment Plant
89.6
Infrastructure
23.0
Mining
1.4
Sub‐Total Direct Costs
114.0
Indirect Costs
Construction
22.2
EPCM
19.8
Owners Project Costs
10.2
Sub‐Total Indirect Costs
52.2
Project Total (without contingency)
166.2
Project Contingency (14.0%)
23.3
Project Total
189.5
14 | P a g e
www.kglresources.com.au
Capital costs relating to the additions to the processing plant to treat the lead‐zinc ore have been deferred
in line with the LoM Production Schedule. Table 7 and Figure 8 summarises the direct, indirect, and
contingency cost estimates for the deferred works.
Table 7. Deferred Capital Cost Estimate Summary ±25%
Lead Plant
Cost Estimate (A$M)
Direct Costs
15.4
Indirect Costs
7.9
Project Total (without contingency)
23.3
Project Contingency (13.9%)
3.4
Project Total
26.7
Figure 8. Capital Expenditure (A$M)
13. OPERATING COST
The information detailed in this section is based on the conceptual LoM work with the inclusion of Inferred
Resources and has been completed separate to and in addition to the Ore Reserve.
Open cut mining operating costs (at surface) vary from A$5.69/bcm (Marshall‐Reward) to A$6.52/bcm
(Green Parrot). Mining operating costs increase with depth of mining.
Average underground mining costs are A$47.00 / t inclusive of development costs.
Process plant operating costs (Table 8) were developed for each major ore type: primary copper ore,
transition copper ore and lead‐zinc ore, as well as two primary / transition copper ore blends. Operating
costs were developed using the plant parameters specified in the process design criteria.
15 | P a g e
www.kglresources.com.au
Table 8. Summary Process Plant Unit Operating Costs +/‐ 25%**
Cu Primary
2.2Mtpa
Cu Transition
2.4Mtpa
Pb‐Zn
1.56Mtpa
20% Transition
2.24Mtpa
40% Transition
2.28Mtpa
Power
A$/t ore
7.01
A$/t ore
6.43
A$/t ore
10.57
A$/t ore
6.89
A$/t ore
6.77
Labour
3.81
3.49
5.37
3.74
3.68
Consumables
2.80
2.56
8.24
2.75
3.01
Cost Centre
2.07
1.89
2.91
2.03
1.99
Maintenance Materials
General and
3.50
3.21
4.94
3.44
3.38
Administration
19.20
17.59
32.03
18.85
18.83
Total
**Estimate accuracy is deemed to be ±25% and is presented in Australian dollar (A$) currency, with base
date third quarter 2015 (3Q15).
Power will be generated on site from a 100% Liquefied Natural Gas (LNG) fuelled power plant with the
inclusion of a PV solar plant representing 10% of the overall power demand. There is provision for 14 days
LNG storage on site to mitigate any risk associated with fuel supply during a significant rain event. The
power station at Jervois will be supplied on a Build, Own and Operate (BOO) basis with power supplied
through a power purchasing agreement at A$0.23/kWh.
As presented in Table 9, C1 costs over the life of mine are A$1.26/lb (US$ 0.88/lb) and C3 costs are
A$3.04/lb (US$ 2.13/lb). C1 costs fluctuate over the life of the operations moving to a credit in 2024 due to
the significant amount of lead & zinc by products credits.
Table 9. C1 & C3 Operating Costs*
Costs
US$
AUD
Mining
0.60
0.85
Processing
0.58
0.82
Other Ops
0.11
0.16
Selling & transport
0.68
0.97
Net by product (credits)
(1.09)
(1.55)
C1 – Cash Costs
0.88
1.26
Dep. & Amortisation
1.00
1.43
NT State Royalties
0.25
0.34
2.13
3.04
C3 ‐ Costs
*conversion exchange rate used 1A$:0.7US$
16 | P a g e
www.kglresources.com.au
14. CASH FLOW ANALYSIS BY PERIOD
The information detailed in this section is based on the conceptual LoM work with the inclusion of Inferred
Resources and has been completed separate to and in addition to the Ore Reserve.
Peak sales revenue occurs in year 5 when processing of the lead‐zinc by products is at its peak. No provision
has been made for ongoing exploration but given that the deposits are still open, it is likely the mine life will
be extended beyond its current life. Rehabilitation charges of A$12.3M have been provided in year 9 at the
end of mine life (Figure 9).
Figure 9. Cash flow analysis by year
An AUD:USD project exchange rate of US$0.70 has been applied, based on the historical averages over
twelve years pre‐dating the Global Financial Crises (GFC) and on the assumption that the United States of
America (US) will return to normal growth and interest rates will average to normal over the forward
estimates. This is confirmed by most recent National Australia Bank and ANZ bank forecasted currency
rates.
The long term commodity prices were based on the mean value of the long term (beyond 2020) forecast
price of each metal from a number of international banks and investment firms as compiled by Consensus
Economics. Prices were quoted in nominal US dollars, metal prices in real US dollars will be accounted for
through the application of a discount rate.
Table 10. Commodi