Investor Presentation
Released
Released
Announcement PDF
Equity Raising
Investor Presentation
July 2024
KGL Resources Limited
Investor Presentation
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
Important Notices and Disclaimer
No reliance: To the maximum extent permitted by law, the information in this presentation is given without any liability whatsoever being accepted by KGL or any of its
related bodies corporate or their respective directors, officers, employees, advisors and agents (together, the Relevant Parties). The information contained in this
presentation is not intended to constitute legal, tax or accounting advice or opinion. No representation or warranty, expressed or implied, is made as to the accuracy,
completeness or thoroughness of the information, whether as to the past or future. Recipients of this presentation must make their own independent investigations,
consideration and evaluation. To the maximum extent permitted by law, each Relevant Party disclaims all liability and responsibility for any direct or indirect loss or
damage which may be suffered by any recipient through the use of or reliance on anything contained in or omitted from this presentation or its contents or otherwise
arising in connection with it.
Limited disclosure: This presentation contains summary information about KGL and its activities which is current at the date of this presentation (unless otherwise
noted). The information in this presentation is of a general nature. This presentation does not purport to contain all the information that a prospective investor may
require in evaluating a possible investment in KGL. It should be read in conjunction with KGL’s other periodic and continuous disclosure announcements lodged with
ASX, which are available at www.asx.com.au.
Seek your own advice: In providing this presentation, KGL has not considered the objectives, financial position or needs of the recipient. The recipient should consult
with its own legal, tax or accounting advisers as to the accuracy and application of the information contained herein, and conduct its own due diligence and other
enquiries in relation to such information and any investment in KGL and the recipient’s objectives, financial position or needs.
Financial information: All references to ‘$’, ‘A$’ or ‘AUD’ in this presentation are to Australian dollars unless otherwise noted.
Certain financial data included in this presentation is ‘non-IFRS financial information’ under ASIC Regulatory Guide 230 ‘Disclosing non-IFRS financial information’
published by ASIC and is also considered ‘non-GAAP financial measures’ under Regulation G of the US Securities Exchange Act of 1934, as amended. Such measures
are not recognised under Australian Accounting Standards or the International Financial Reporting Standards (IFRS). The disclosure of such non-GAAP financial
measures in the manner included in this presentation may not be permissible in a registration statement under the US Securities Act.
KGL believes the non-IFRS financial information / non-GAAP financial measures provide useful information to users in measuring the financial performance and condition
of KGL. However, investors should note that the non-IFRS financial information / non-GAAP financial measures do not have a standardised meaning prescribed by the
Australian Accounting Standards or IFRS.
Therefore, the non-IFRS financial information / non-GAAP financial measures are not a measure of financial performance, liquidity or value under the Australian
Accounting Standards or IFRS and may not be comparable to similarly titled measures presented by other entities, nor should the information be construed as an
alternative to other financial measures determined in accordance with Australian Accounting Standards or IFRS. Investors are therefore cautioned not to place undue
reliance on any non-IFRS financial information / non-GAAP financial measures included in this presentation
Cautionary note regarding reserves and resources: As an Australian company with securities listed on ASX, KGL is required to report ore reserves and mineral resources
in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mining
companies in other countries may be required to report their mineral reserves and / or resources in accordance with other guidelines (for example, Subpart 1300 of
Regulation S-K in the United States).
This announcement contains certain ‘forward-looking statements’ within the meaning of the securities laws of applicable jurisdictions. Forward-looking statements can
generally be identified by the use of forward-looking words such as ‘may,’ ‘should,’ ‘expect,’ ‘anticipate,’ ‘estimate,’ ‘scheduled’ or ‘continue’ or the negative version of
them or comparable terminology. Any forecasts or other forward looking statements contained in this announcement are subject to known and unknown risks and
uncertainties and may involve significant elements of subjective judgment and assumptions as to future events which may or may not be correct. There are usually
differences between forecast and actual results because events and actual circumstances frequently do not occur as forecast and these differences may be material.
KGL does not give any representation, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking statements in this
announcement will actually occur and you are cautioned not to place undue reliance on forward-looking statements.
KGL Resources Limited
Investor Presentation
2
1. Jervois Project Overview
• Project and Market Highlights
• Company Strategy
• Corporate Snapshot
2. Equity Raising
3. Summary of Material Risks
4. Appendices
A. Key Risk Factors
B. Copper Market Overview
C. Competent Person Disclosure
D. Foreign Selling Disclosure
KGL Resources Limited
Investor Presentation
Jervois Project Overview
Map and location
▪ The Project is located in the
Northern Territory (NT) of Australia
approximately 380km by road northeast of Alice Springs, within existing
Mineral Leases.
▪ KGL has completed all major
development approvals;
– Native Title Agreement in 2016
– Environmental approval
recommended in October 2019
– the Jervois Mining Management
Plan approved by the NT
Government in December 2020
(Updated Feb 2024)
▪ KGL acquired in 2015 two
exploration licences at Yambah,
60km north and northeast of Alice
Springs and in 2017 the Unca Creek
tenements.
KGL Resources Limited
Investor Presentation
4
KGL Highlights
High Grade Project Primed to Take Advantage of Rising Copper Market
High Grade Copper
project with gold and
silver byproducts
Advanced project
with major
approvals in place
Low capital intensity
Reduced Risk
Planned development,
operations and offtake
via
Tier 1 companies
472kt contained
copper resource @
2.02% Cu
Investment Upside
opportunity through
infill drilling and
continued exploration
Experienced Board,
appointed in recent
years with extensive
resources track record
Bull market
sentiment for copper
as a critical mineral
KGL Resources Limited
Investor
Investor
Presentation
Presentation
5
High Grade Resource
Contained Copper Mineral Resources in Australian Projects
Logarithmic Project Size
As the average grade of brownfield and greenfield projects decline and their associated capital and operating
costs increase, Jervois stands out as one of the highest-grade undeveloped projects in Australia.
KGL Resources Limited
Investor Presentation
6
Use of Funds
Min Raise
$6.0 mill
Max Raise
$15.1 mill
Opening Balance as at 30th June 2024
$6.5 mill
$6.5 mill
Produce into Long Term Chronic Copper Shortfall
• Finalise Feasibility Study Update
• Undertake Technical Review
• Progress to FID
• Project Readiness for first production
$1.0 mill
$3.0 mill
Drilling to Extend the Project Life
• Exploration in and around existing Resource Model
• Grow Production Targets
• Focus on Rockface, Reward Deeps and Marshall.
$8.0 mill
$11.0 mill
Exploration at Depth
• Complete Inversion Study
• Model targets
• Undertake drilling of targets 1
$1.0 mill
$2.5 mill
Working Capital including Corporate Costs
$ 2.5 mill
$5.1 mill
Total Usage
$12.5 mill
$21.6 mill
1. Subject to near to the maximum raise being achieved
KGL Resources Limited
Investor Presentation
7
KGL’s Three-Fold Strategy
1.
Produce into Long Term Chronic Copper Shortfall
▪
Market uncertainties abating: External headwinds including macroeconomic and funding risks, supply chain constraints, labour market
shortages and balanced copper market demand has provided KGL opportunity to continue to refine the project and improve confidence in
Mineral Resource.
▪
Optimise Capex/Opex: Improve the project construction and operating assumptions since delivering a Feasibility Study (Nov 2022) to
mitigate delivery risk, reduce time to construct and optimise capital intensity.
▪
Complete Feasibility Study Update Q3/Q4 2024 and Independent Technical Review
▪
Goal of first production in 2027 – pathway to production.
2.
Drill Plan to Extend the Project Life
▪
Grow the Resource: Focus on increasing the quality and size of the Jervois Resource.
▪
Grow Production Tonnages: Upgrade O/C & U/G mine design to reflect 25% increase in maximum processing capacity
▪
Continue exploration under Reward Deeps, Marshall, Rockface and Bellbird (see announcement 01/07/2024 and 05/07/2024).
3.
Exploration at depth
▪
3 Coincident magnetic and gravity anomalies detected at depth. Two at Reward and a large anomaly under southern end of J structure near
Rockface.
▪
One deep hole drilled in 2023/24 provided geological and petrophysical data to 2km.
▪
Undertaking inversion analysis using detailed gravity and magnetic surveys combined with current drillhole data to further define targets.
▪
One further deep hole planned for 2024 subject to funding.
KGL Resources Limited
Investor Presentation
8
1. Produce into Long Term Chronic Copper Shortfall
The Perfect Storm
Market Outlook
▪
S&P Global “demand for refined copper will double … by 2035”
▪
Demand forecasts reflect global commitments to achieve Net Zero by 2050 with electric vehicles and the grid key
demand drivers + traditional demand growth.
Demand
▪
At COP28 climate change conference, over 60
countries endorsed a plan to triple global renewable
energy capacity by 2030.
▪
Accelerating demand expected from the clean energy
transition, data centers & AI, defense industries and
ongoing industrial demand in China, India and SE Asia.
▪
Clean energy technologies are more copper intensive.
Supply Demand Forecast2
Supply Constraint
▪
“The pronounced lack of new projects has begun to
bite, constraining refined copper production and
spotlighting years of underinvestment in copper
exploration and development”.1
▪
The average time to progress projects from discovery
to production is around 16 years. 3
▪
BHP estimates that copper potentially needs around
US$250 billion in growth capital by 2030. 4
Concentrate supply is expected to peak in 2025
Lack of investment and approved project pipeline together with
declining grades in current operations could see a supply gap
of 35% by the end of this decade according to Trafigura 5.
1 Michael Widmer, Bank of America, Commodity Strategist – April 8, 2024.
2. Woodmac; Goldman Sachs Global Investment Research
3. Paul Manalo, S&P Global , Discovery to production averages 15.7 years for 127 mines
4. Mike Henry, Bank of America Global Metals, Mining and Steel Conference 2023
5. Emma Powel, The Times, Supply gap for copper “could grow to a third” trader predicts”.
KGL Resources Limited
Investor Presentation
9
1. FY2022 Feasibility Study
▪
The Feasibility Study (Nov 2022) confirmed the Jervois Copper Project is technically robust and financially viable at a
copper price of US$4.23/lb
▪
The spot market prices for copper, gold and silver have already exceeded the FS long term commodity price
assumptions over 12 months ahead of time
▪
The following is a Copper price sensitivity previously published in the FS (Nov 2022) demonstrating a significant uplift
in value based on copper price forecast only
▪ Silver and Gold prices and foreign exchange rate have not been increased to current spot market equivalents
▪
Low capital Intensity compared with other proposed greenfield projects
Goldman Sachs (GS) recently noted at
the CRU World Copper Conference in
Chile that copper is in the foothills of what
will be its Everest over the next 3-5 years.
GS view is that the copper price will surge
into next year (GSe 2025 $15,000/t
average), expecting copper to rise to
$12,000/t by year-end as scarcity
pressures mount.
1. FS Nov 2022: Bloomberg consensus pricing 2025 - Oct 2022
2. Goldman Sachs “meet forecast market demand” US$13,000/t
3. Goldman Sachs “Cresco Symposium” US$15,000/t
KGL Resources Limited
Investor Presentation
10
1. Feasibility Study Update
Process Plant
Open Cut Mining
and Underground
Mining
Mine Scheduling
Civil Works Inc TSF
Ancillary Infrastructure
Flowsheet and
technology selection
optimised to increase
the plant capacity to
2.0Mtpa (+25%)
Re-evaluate
sequencing of O/C and
UG and timing of
developments.
Update OC and U/G
schedules.
Selected civil works to
be completed by larger
mine scale equipment
to reduce time and cost
Refine power ramp up to
match plant and sequenced
mining operations. Refine
hybrid power
Modularize
construction to reduce
complexity and cost
Pit shell and dump
capacity optimised.
Modifying UG plan
based on OC changes
Update ventilation
circuits and water
pumping infrastructure
Re-tendering of civil
packages
Update Camp requirements
based on resource levelling
Update Open cut and
U/G Reserves
Update TSF design and
costing
Upgrade to 24/7 Airstrip and
Emergency Response
capability
August 2024
August 2024
September 2024
Complete
July 2024
Updated Feasibility Study Q3/Q4 2024
KGL Resources Limited
Investor Presentation
11
1. Pathway to Production
6 Months
Funding and FID
FID and
Funding
Prep
PROJECT MANAGEMENT
Site Prep
Construction
Construction Completion
Operations
---------------- 6 months-------- 12 ---------------- 12 months------ 24 ----------------6 months---------- 30 ---------Ongoing----------
Plant Procurement
`
Process Plant Site Erection
Plant: Commissioning and Ramp Up
Plant @ 2Mtpa rate
Clean up and
Drainage
Laydown prep
Reward O/C
Commissioning
OC Mining
commences at BB
Reward & BB Open Pit
Reward OC: 2 x diggers / BB
Completes
Water: Pipeline
Creek diversion
Haul Roads
TSF Construction
Rockface UG Site Prep
UG Mobilisation / Rockface
Development Commences
Construction
Water Supply
Dams
Crushing Plant
Preliminary Power
Infrastructure
Full Site
Electrification
Fencing
Batch Plant
Fuel and
Explosives storage
Ore Feed
Stockpile
Camp Construction
Bellbird Surface
Prep
Camp Infrastructure
Airstrip Bulk
Earthworks
KGL Resources Limited
This schedule is
based on the best
estimate of the
development
timeframe.
Airstrip
commissioning
Investor Presentation
12
2. Drill Plan to Extend the Project Life
• The EL and Mining leases cover 111 km2
- Jervois (38 km2), Unca Creek (73 km2)
• 12 km (78%) of undrilled or only shallow
drilled sections of J structure
• There are 2 main mining areas in the
Jervois Project area separated by about
5km:
1
1 Reward / Marshall contains 13.2Mt
1.
Mineral Resource at 1.8% Cu
2 Bellbird / Rockface contains 10.2Mt
2.
Mineral Resource at 2.3% Cu
2
• Total Resource 23.37Mt @ 2.02% Cu
26.0g/t Ag, 0.26g/t Au including
- 3.86Mt @ 2.1% Cu Measured
Resources
• Both areas:
- have Open Cut (OC) and Underground
(UG) mining planned in multiple areas
- There is a planned overlap between
OC and UG to deliver high grade ore to
the processing plant adjacent to the
central Reward OC
- Lodes remain open at depth
KGL Resources Limited
Investor Presentation
13
2. Exploration around existing orebody
KGL Resources Limited
Investor Presentation
14
2. Rockface: expansion optionality both near
surface and at depth
▪ Deepest holes at Rockface intersect high
grade copper with gold and silver credits.
▪ Hole KJCD575W1 (130 metres below
mine plan)
– 5.0 m @ 2.43% Cu, 18.1 g/t Ag, 0.55
g/t Au, from 1,132.5 m.
▪ Hole KJCD556 (wide intersection)
– 12.4m @ 2.60% Cu, 23.8 g/t Ag, 0.34
g/t Au from 978.26m.
▪ Hole KJCD556D4 (intersected highgrade zinc/copper/silver massive
sulphides at depth)
– 4.1 m @ 3.59% Cu, 20.49% Zn,
4.32% Pb, 199.9 g/t Ag, 0.65 g/t Au
from 990.0 m.
▪ Currently drilling 40m below the deepest hole to validate conductor
▪ Currently investigating extension of the Rockface mining area toward the surface.
▪ Long Projection illustrating Resource Block Model (coloured by Cu grade), recent significant intercepts,
DHEM plates (blue panels) and drill pierce points (North lode blue, Main lode green)(crossed circles =
recent).
KGL Resources Limited
Investor Presentation
15
3. Exploration at depth
▪ KGL is targeting a large mineralized system
beneath the copper-silver-gold system at the
southern end of the Jervois mineralized field.
▪ Drill results at Rockface indicate that the copper
grades are improving at depth.
▪ One deep hole drilled in 2023/24 provided
geological and petrophysical data to 2kms.
▪ Geological modelling together with geophysics
has identified a large intense IP chargeable
anomaly lying beneath the known mineralisation
that shows clear similarities with the geophysical
signature of the Rockface deposit.
▪ In 2024, KGL will be undertaking inversion
analysis using detailed gravity and magnetic
surveys combined with current drillhole data to
further define targets.
▪ Once modelling is complete, a drill program will
be designed to test this large geophysical
anomaly with the goal of improving
understanding of the source of the high grade
mineralising fluids at Rockface at the southern
end of the Jervois mineral field.
KGL Resources Limited
Investor Presentation
16
3. Exploration at Depth
• The Jervois mineral field is a highly prospective area due to
its proximity to the large crustal-scale Jervois Fault, which
acted as a plumbing system for mineralising ore-forming
fluids .
• The high grade Rockface copper-silver deposit is located in
the hinge of the J-Fold in the southern Jervois mineral field.
The deposit is interpreted as hybrid mineralisation that
resulted from syngenetic, synsedimentary and epigenetic
processes (McGloin and Weisheit 2022).
• Mineralisation at Rockface consists of chalcopyrite– pyrite–
pyrrhotite breccia that overprints a phase of magnetite
alteration interpreted to relate to alteration associated with
earlier synsedimentary processes. Early garnet–biotite
assemblages have broken down to form magnetite and
chlorite (McGloin 2017). This mineral assemblage is
interpreted to represent retrograde, fluid assisted alteration
that likely formed when copper-bearing hydrothermal fluids
reacted with pre-existing metaexhalite sequences (Mayes
and Bennett 2017).
• KGL’s expanded exploration program incorporating deep
diamond drilling will comprise deep exploration holes
together with DHEM analysis with the goal of improving our
understanding of the source of the high grade mineralising
fluids at Rockface at the southern end of the Jervois mineral
field.
KGL Resources Limited
Theoretical graphic
depiction
Investor Presentation
17
Sustainability and Environmental
▪ Environment, Social and Governance (ESG) and Indigenous relations remains a top priority for KGL.
▪ EPA has recommended the mine proceed with operating conditions.
▪ Environmental risk assessment completed
- No environmental, social, economic or human health and safety risks with an extreme initial or
residual risk rating identified.
• Refining Hybrid power generation design (Solar / battery / generators) targets reduced carbon
footprint.
• Water intensity and re-use is being optimised.
▪ Positive impacts for local businesses, training opportunities, direct and indirect employment.
KGL Resources Limited
Investor Presentation
18
Key Takeaways
▪ Clear focus on deliverables – new CEO appointed, board restructure
▪ Feasibility Update Q3 / Q4 2024
▪ Ongoing optimisation continues to reduce project capital intensity and mitigate construction risks .
▪ Currently levelling project delivery timetable and retendering minor contracts.
▪ Growing the Resource:
▪ Active exploration program continues to improve / expand Mineral Resources –
targeting extended mine life.
▪ All planned UG mining areas remain open at depth.
▪ Outside of the current exploration focus, the 12 km mineralising system remains relatively
underexplored with a number of exciting exploration targets including anomalies at depth.
▪ Early works and Project funding to follow.
Observations
▪ Funding and project delivery headwinds - appear to be abating.
▪ Pathway to copper incentive pricing - gains momentum.
▪ KGL share price has disconnected from bullish sentiment reflected in higher copper prices.
▪ We expect KGL share price to be favourably positioned to benefit from project metrics and recent
M&A multiples.
KGL Resources Limited
Investor Presentation
19
Corporate Snapshot
Capital Structure
Share Price Performance
ASX Code
ASX.KGL
Share Price (close 5/07/24)
11.5 cents
52 week low / high
9.7 / 19.0 cents
Shares outstanding
567.3 M
Options on issue
234k
Market capitalisation
$65.2M
Cash (30 June 2024)
A$6.5M
Debt Capital
Nil
Enterprise valuation
A$58.7M
Board of Directors
Major Shareholders
Jeff Gerard
Independent Chairman
KMP Investments Pte Ltd
31.69%
Brian Gell
Independent Nonexecutive Director
Denis Wood
10.15%
Marshall Plenty Investments LLD
7.98%
Ferdian Purnamasidi
KGL Resources Limited
Non-executive Director
Investor Presentation
20
1. Jervois Project Overview
• Project and Market Highlights
• Company Strategy
• Corporate Snapshot
2. Equity Raising
3. Summary of Material Risks
4. Appendices
A. Key Risk Factors
B. Copper Market Overview
C. Competent Person Disclosure
D. Foreign Selling Disclosure
KGL Resources Limited
Investor Presentation
Equity Raising Summary
◼
Equity raising to raise up to A$15.1 million, comprising:
a 4 for 15 pro-rata traditional non-renounceable entitlement offer (Offer)
Commitments for A$4.8 million
• In respect of KMP Investments Pte. Ltd., subject to compliance with Chapter 6
Offer Structure & Size
◼
Minimum raising ofAct
A$6.0 million
(before(Cth).
costs) under the
of the Corporations
2001
If Offer
to take up its entitlement under the Offer
◼
Up to approximately 151.3 million new KGL shares (New Shares) will be issued
in full would result in KMP Investments Pte. Ltd.
• breaching▪ Chapter 6 of the of the Corporations Act 2001 (Cth), it will take up
Top-up Facility
Top-up facility available to participating shareholders
the maximum number of New Shares which it is legally permitted to acquire.
◼
• 2. The theoretical ex-rights price (TERP) including shares issued under the
Offer Price
Offer price of A$0.10 per New Share, which as of close of trading on 5 July 2024 represents:
A 8% discount to the 30 day VWAP of KGL shares on ASX of A$0.108 1
assumption
A 15% discount to the lastthat
closing price
of KGL
shares on
5 July 2024 of A$0.115
Offer (on the
it is
fully
subscribed)
A 12% discount to TERP of A$0.112 (assuming a full take up of Offer) 2
• 3. The average of the volume-weighted average prices of the ordinary shares
in KGL on
forofthe
lastallow
30thetrading
days
ending
◼ ASX
Minimum raise
A$6.0 million
Company to advance
its three
fold strategy. on 24 April 2023 (rounded)
3
Use of Proceeds
◼
• 4. The ‘minimum raise condition’ is satisfied if the Company receives
Funding in excess of minimum will primarily be used to continue exploration to provide additional project development working capital, fund front
end engineering and design and exploration at depth.
commitments under the Offer for no less than A$9 million (before costs)
Shareholder Support
◼
KGL’s largest shareholder, KMP Investments (31.69%) is supportive and has committed to take up their entitlements under the Offer in full
1. The average of the volume-weighted average prices (VWAP) of the ordinary shares in KGL on ASX for the last 30 trading days ending on 5 July 2024 (rounded).
2. The theoretical ex-rights price (TERP) including shares issued under the Offer (on the assumption that it is fully subscribed).
3. The ‘minimum raise condition’ is satisfied if the Company receives commitments under the Offer for no less than A$6 million (before costs).
KGL Resources Limited
Investor Presentation
22
Equity Raising Summary
◼
KGL’s largest shareholder, KMP Investments (31.69%), is supportive and has committed to take up their full entitlements under the Offer (totalling A$4.8
million)
◼
The table below details changes to shareholdings under varying shareholder participation levels
Substantial
shareholder
support (and
control
implications)
◼
Dispersion
strategy
KGL Resources Limited
% Entitlement Taken Up
39.66%
53.00%
67.00%
100%
Shares from Rights
Total Shares after Rights
60,000,000
627,291,863
80,177,250
647,469,113
101,356,146
668,648,009
151,277,830
718,569,693
Total Funds Received
6,000,000
8,017,725
10,135,615
15,127,783
%KMP Shareholding
% Increase in holding
36.31%
4.61%
35.18%
3.48%
34.06%
2.37%
31.70%
0.00%
KGL has offered a top-up facility to limit the control effect of KMP Investments' participation in the Offer, and KMP Investments will only participate in the
Offer to the extent of their pro-rata entitlements
Investor Presentation
23
Funding and Pro-forma Capital Structure
Sources of Funds
$ (Min)
$(Max)
Existing Cash Position (30 June 2024) 1
A$6.48m
A$6.48m
Entitlement Offer 2
A$6.0m
A$15.1m
Total
A$12.48m
A$21.58m
Key Information
5 July 2024
Post Equity
Raising
Min Raise Max Raise
(A$6.0m) (A$15.1m)
Share Price 1
A$0.115
A$0.114
A$0.112
Ordinary Shares On Issue
567.3m
627.3m
718.6m
Market Capitalisation
A$65.2m
A$71.5m
A$80.4m
Cash 2
A$6.5m
A$12.5m
A$21.6m
A$0m
A$0m
A$0m
A$58.7m
A$59.0m
A$58.8m
Use of Funds 3
$ (Min)
$(Max)
Finalise Feasibility, Progress to FID, Project
Readiness
A$1.0m
A$3.0m
Debt Capital 3
Project Life Extension drilling. Rockface and
Deeps Exploration
A$8.0m
A$11m
Enterprise Value
Exploration at Depth
A$1.0m
A$2.5m
Corporate Overheads and Working Capital
A$2.48m
A$5.08m
Total
A$12.48m
A$21.58m
1.
2.
3.
Post equity raising price is TERP calculated based on $A6.0 million
and A$15.1 million Equity Raising. TERP is a theoretical calculation
only; the actual price at which KGL shares trade immediately after the
ex-date may differ.
As at 30 June 2024 based on KGL’s management balance sheet,
which is not audited or reviewed. Post equity raising position reflects
proceeds before costs.
Excludes lease liabilities & June 2024 creditors.
1. As at 30 June 2024 based on KGL’s management balance sheet, which is not audited or
reviewed.
2. Assuming A$6.0 million minimum raise; funds raised in excess of the A$6.0 million minimum
raising (up to an additional A$9.1 million in the event that the Offer is fully subscribed) will be
used to continue exploration activities, to provide additional project development working
capital , fund front end engineering design and exploration at depth. The Board reserves
the right to change the allocation of funds where there are changes in market conditions,
exploration priorities or strategic objectives.
3. Use of Funds includes expenditure from 30 June 2024 to date.
KGL Resources Limited
Investor Presentation
24
Timetable
Event
Date
Announcement of the Offer
8 July 2024
"Ex" date
10 July 2024
Record date for Offer (7.00pm (Sydney time)) (Record Date)
11 July 2024
Offer Booklet and personalised Entitlement and Acceptance Forms despatched, and announcement of despatch
16 July 2024
Offer opens
16 July 2024
Closing Date for the Offer (5.00pm (Sydney time))
25 July 2024
Securities quoted on a deferred settlement basis (from market open)
26 July 2024
Announcement of results of the Offer
30 July 2024
Settlement of the Offer
31 July 2024
Allotment of New Shares issued under the Offer
1 August 2024
Normal trading on ASX for New Shares issued under the Offer commences
2 August 2024
Despatch of holding statements for New Shares issued under the Offer
5 August 2024
KGL Resources Limited
Investor Presentation
25
1. Jervois Project Overview
• Project and Market Highlights
• Company Strategy
• Corporate Snapshot
2. Equity Raising
3. Summary of Material Risks
4. Appendices
A. Key Risk Factors
B. Copper Market Overview
C. Competent Person Disclosure
D. Foreign Selling Disclosure
KGL Resources Limited
Investor Presentation
Summary of Key Risks
Material Business Risks
General Risk Factors
Future Capital Raisings
Market
Exploration
Taxation
Feasibility and Development
Liquidity
Regulatory
Securities Investment
Occ Health and Safety
Economic Factors
Limited Operating History
Accounting Standards
Key Personnel
Resource and Reserve Estimate
Environmental
Availability of Equipment and Contractors
Cu Price and AUD Exchange
Climate Change
Macro-economic
KGL Resources Limited
Investor Presentation
27
1. Jervois Project Overview
• Project and Market Highlights
• Company Strategy
• Corporate Snapshot
2. Equity Raising
3. Summary of Material Risks
4. Appendices
A. Key Risk Factors
B. Copper Market Overview
C. Competent Person Disclosure
D. Foreign Selling Disclosure
KGL Resources Limited
Investor Presentation
Appendix A
Key Risk Factors
KGL Resources Limited
Investor Presentation
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
Key Risk Factors
Activities in KGL and its controlled entities, as in any business, are subject to risks which may impact on KGL’s future performance. There are a
number of factors, both specifi
Share your feedback
Discover