Drilling Results / Exploration Program
KGL Resources' recent drilling activities have focused primarily on the Reward and Rockface deposits to
enhance mineral resource categorisation and to expand our mine plans. The results of the drilling program
in 2023 were pleasing, confirming extensions to mineralisation at Rockface and providing data to increase
confidence in the open pit resource at Reward.
Reward
o Reward resource infill drilling confirmed shallow high-grade copper zones as well as deeper thick
intersections, containing zones of high-grade copper within the open pit design at the Reward-Main
Lode and the Reward-Marshall Lode potentially contributing to the Project’s economic viability.
Rockface
o Rockface remains open for further drilling at depth, with the deepest hole at Rockface intercepting
strong copper and gold grades.
o Infill drilling focused on shallow to intermediate depths where existing data is limited and revealed
additional high-grade copper mineralisation, potentially extending the mine plan upward. An
additional seven drill holes are awaiting assay results. Infill and exploratory drilling to continue.
Near term targets continue to be worked up based on drilling results and geophysics with a focus on
expanding the resource and extending the mine life of this high-grade project. In 2024, KGL will expand its
exploration program to target depth extensions at Reward and Rockface. KGL is currently drilling a 2km
stratigraphic hole to improve our understanding of the geological structures at depth.
During 2024, our objective is to enhance the resource classification to JORC Measured category,
specifically encompassing the initial two years of planned production.
Progressing key project development activities
KGL is progressing optimisation studies to improve key value drivers and financing options for the project
as we move towards the important development milestones of Final Investment Decision (FID) and
financing for the project, which is subject to market conditions at the time.
KGL’s progress along the development pathway is taking place at a time when analysts are forecasting a
chronic shortage in copper over the next decade with copper considered critical and/or strategic for each
nation’s energy and economic security and for the clean energy transition.
Corporate
Current cash & cash equivalent as at 31 December 2023 was $13.5 M.
Federal Government: Copper included on Strategic Materials List
During the quarter, the Federal Government included copper on a newly created Strategic Materials List.
Inclusion may provide the project with access to more supportive policy settings that encourage
accelerated development of this high-grade project as an important part of the country’s clean energy
transition.
KGL Resources Limited | Quarterly Activities Report
Page 1 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Drilling Results / Exploration Program
Growing the high-grade copper resource and mine life at Jervois continues to be a key value driver for KGL
shareholders.
The 2023 drilling program has been centered around four specific target areas:
Reward-Marshall Lode shallow to intermediate resource infill drilling
Reward Main Lode shallow to intermediate resource infill drilling
Rockface depth extensions
Rockface shallow to intermediate resource infill drilling
The 2024 drilling program is aimed at resource extensions at Rockface and Reward and resource classification uplift
to JORC Measured category at Reward open pit.
Overall, the results of the 2023 Jervois drilling program were successful and confirmed extensions to mineralisation
at Rockface and Marshall and increasing confidence in open pit resource at Reward.
Reward
The purpose of the infill drilling conducted within and around the intended Reward open pit was to increase the
confidence in the mineral resource estimate to deliver a more robust mine plan and mineral resource to ore reserve
conversion. Mineral resources for the Reward open pit are currently classified under JORC (2012) as Indicated and
infill drilling is aimed at improving these to Measured resource status.
The findings from infill drilling at Reward are largely consistent with the current mineral resource model and have
been a key driver in our decision to review options for prioritising mining of the Reward deposit and the potential to
increase the size of the Reward open pit.
Final assay results have been received for Reward Main Lode and Reward-Marshall Lode which are the two areas to
be exploited by the Reward open pit mine. These findings of near-surface, high-grade copper contribute valuable
insights to the project's potential and economic viability. Of note are the results from KJD613 and KJD614 within the
Marshall Lode, revealing high-grade copper with appreciable silver and gold in the near-surface deposits.
Marshall Lode:
KJD6131:
2.8m @ 8.37% Cu, 127.3 g/t Ag, 1.42 g/t Au from 30.35m including:
1.8m @ 11.80% Cu, 183.7 g/t Ag, 1.76 g/t Au from 30.35m
KJD614:
6.7m @ 3.13% Cu, 40.9 g/t Ag, 0.46 g/t Au from 19.00m including:
1.6m @ 9.25% Cu, 71.3 g/t Ag, 1.64 g/t Au from 20.00m
Within the Marshall lode, high-grade occurrences extend to deeper levels. These instances of elevated copper
grades are observed within thicker mineralised zones, as evidenced by the three intersections highlighted below.
The outcomes from these drillholes serve to reinforce and validate the existing mineral resource model, as depicted
in Figure 2 and Figure 3.
KJD606:
9.9m @ 2.07% Cu, 32.9 g/t Ag, 0.30 g/t Au from 39.00m including:
o 2.9m @ 3.24% Cu, 26.4 g/t Ag, 0.60 g/t Au from 46.80m
KJD608:
11.7m @ 2.00% Cu, 54.1 g/t Ag, 0.32 g/t Au from 73.00m including:
o 2.3m @ 4.52% Cu, 108.3 g/t Ag, 0.85 g/t Au from 79.81m
KJD612:
10.4m @ 3.25% Cu, 90.6 g/t Ag, 0.34 g/t Au from 123.80m including:
o 3.2m @ 6.62% Cu, 195.7 g/t Ag, 0.61 g/t Au from 130.00m
1
All thicknesses quoted in this report are estimated true thickness unless otherwise specified
KGL Resources Limited | Quarterly Activities Report
Page 2 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Figure 1. Longitudinal projection of the Reward planned open pit showing the reported drill holes (labelled white dots)
and the Reward mineral resource block model. Previous drilling shown as smaller black dots
Figure 2. Cross section showing the thick copper intersection in KJD606 and KJD608 demonstrating consistency with
the mineral resource block model.
KGL Resources Limited | Quarterly Activities Report
Page 3 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Main Lode:
Of note are the results from KJD588 and KJD586 within the Reward Main Lode, revealing high-grade copper with
appreciable silver and gold in the near-surface deposits.
KJD588:
14.8m @ 1.55% Cu, 18.2 g/t Ag, 0.32 g/t Au from 17.00m including:
2.1m @ 3.53% Cu, 30.7 g/t Ag, 0.69 g/t Au from 18.00m
KJD586:
13.6m @ 2.00% Cu, 25.3 g/t Ag, 0.29 g/t Au from 57.30 including:
5.7m @ 3.35% Cu, 35.8 g/t Ag, 0.47 g/t Au from 71.00m
Figure 3. Cross section showing the wide copper intersection in KJD586 and KJD588 demonstrating consistency with
the mineral resource block model.
Rockface
During the quarter, assay results were received for two deep holes at Rockface, namely KJCD575W1 and
KJCD556D4. KJCD575W1 is the second deepest hole drilled at Jervois, yielding the deepest copper intersection
recorded on the property. Notably, it encountered high-grade stringer copper mineralisation over an estimated true
width of 5 metres situated approximately 130 metres below the Feasibility Study mine plan, at Rockface.
Deepest hole at Rockface intersects strong copper and gold in KJCD575W1:
5.0 m2 @ 2.43% Cu, 0.55 g/t Au, 18.1 g/t Ag from 1,132.5 m including
2.1 m @ 3.53% Cu, 1.01 g/t Au, 21.5 g/t Ag from 1,134.54 m
High-grade copper-zinc-lead-silver massive sulphides discovered in deep Rockface drillhole KJCD556D4:
4.1 m @ 3.59% Cu, 20.49% Zn, 4.32% Pb, 199.9 g/t Ag, 0.65 g/t Au from 990.0 m
2
All thicknesses quoted in this report are estimated true thickness unless otherwise specified
KGL Resources Limited | Quarterly Activities Report
Page 4 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Following a recent Downhole Electromagnetic (DHEM) survey, a conductor was identified (KJCD575W1_on-hole),
correlating with the mineralisation found in the hole. This conductor is interpreted to persist beyond the actual point of
intersection (Figure 4). KJCD556D4 intercepted a 4.1 metres true thickness of massive sulphide mineralisation, which
contains substantial amounts of sphalerite (zinc sulphide) as well as copper and lead sulphides plus high silver grades.
However, the exact extent and importance of these zinc-rich massive sulphides remains uncertain and will necessitate
further drilling for a comprehensive assessment.
Figure 4 Long Projection of the deeper portion of the Rockface North Lodes showing the two most recent results (N.B.
topographical surface is +365m RL). (colours serve to differentiate the physical boundaries conductor plates but do not
relate to any quality of the conductor).
Recent drilling efforts at Rockface have primarily focused on exploring deep holes to discover extensions of the
Rockface North Lode at significant depths. This exploration technique involves an iterative process combining drilling
and DHEM geophysics. The Company has previously reported successful results from this approach and has plans
to continue exploring at greater depths in the upcoming year.
Concurrently, there's a recognition that there is potential to refine and potentially expand the high-grade Rockface
Main Lode mineralisation, particularly at shallow to intermediate depths.
The most recent infill drilling at Rockface revisited the area in the vicinity of the original hole KJCD171 discovery (ASX
Announcement: 22/10/2015). The results of Hole KJCD171 included:
10m @ 2.14% Cu, 12.5g/t Ag, 0.10g/t Au from 255 m, and
1.5m @ 2.83% Cu, 10.8g/t Ag, 0.05g/t Au from 278 m
Four holes discussed in this report were strategically designed (Figure 6). Each of these holes intersected copper
mineralisation exceeding 1% Cu, as outlined in Table 1. Notably, the result from KJD582 is particularly significant as
it revealed an extended high-grade copper zone, which is expected to positively impact the adjustment of the
mineral resource model in an upward direction and expand the mine plan (Figure 5)
KGL Resources Limited | Quarterly Activities Report
Page 5 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Table 1: Mineralised intersections in recent Rockface drilling
Figure 5 Cross section of KJD582 At Rockface Main Lode, which show the position of the strong high-grade copper
intercept above the currently planned extent of stoping
KGL Resources Limited | Quarterly Activities Report
Page 6 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Figure 6. Plan view of the 4 holes targeting the Rockface Main lode at shallow to intermediate depth.
KGL is awaiting assay results from the remaining 7 drillholes at Rockface completed in 2023.
Initial Drilling Program in 2024
The emphasis of the current infill drilling campaign at the Rockface resource will continue to be on shallow to
intermediate depths, where existing drilling data is relatively limited. This approach has been adopted to capitalise
on the potential for resource expansion in these specific areas.
Rockface remains open for further drilling at depth, with the deepest hole at Rockface intercepting strong copper and
gold grades. Near term targets, including intermediate depths and Rockface depth extensions, continue to be
worked up based on drilling results and geophysics with a focus on expanding the resource and extending the mine
life of this high-grade deposit.
Having achieved our goal of a minimum 10-year mine life and based on recent exploration success, KGL is currently
drilling an initial 2km stratigraphic hole to improve our understanding of the geological structures at depth and the
origin of the mineralising processes which have led to the deposition of the known copper deposits.
We expect the drill core and assay data from this hole, once added to the integrated 3D model of all exploration
drilling results and ground geophysics, will provide stratigraphic and structural information which will assist in
identifying target areas for follow up drilling.
The potential to add considerable value by extending the mine life justifies our focused exploration program.
Ongoing exploration success can add materially to the value of the project as it drives capital efficiencies, cashflow
and IRR improvement. A robust market for copper may also provide KGL with additional production options in our
mine plan.
KGL Resources Limited | Quarterly Activities Report
Page 7 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Progressing Project Development Activities
During the quarter, KGL continued to progress optimisation studies to improve key project value drivers including
productivity improvements that will support project financing.
This ongoing process is geared towards refining the economic, technical, and environmental aspects of the project.
The optimisation efforts are anticipated to yield an optimised Feasibility Study, providing a detailed, comprehensive,
refined and definitive assessment of the project's viability and potential for long-term success.
Significant work has been undertaken to quantify the impact of potentially expanding the open pit mine plan and
increasing the size of the mining equipment that results in higher and more efficient open pit mining rates. This will
effectively delay the capital development of the underground mines whilst, smoothing capital expenditure and peak
labour and accommodation requirements.
Proposed process plant configuration enhancements will also reduce the amount of labour required on-site for
construction and increases the annual processing rate from 1.6 Mtpa to 2.0 Mtpa. The majority of the Front-End
Engineering Design (FEED) work is complete. The plant will utilise a conventional crushing, SAG and ball mill
comminution circuit and energy efficient Jameson Cell technology in the flotation circuit.
Discussions are ongoing in relation to the contracts for supply, construction and operation of the process plant.
We continue to work with key contractors and each level of government and the local community to ensure we can
deliver a cost competitive project, on time, as we move the project along the development pathway towards Final
Investment Decision (FID).
A critical milestone on the horizon is the FID, contingent upon prevailing market conditions. The decision to move
forward with the project will be carefully evaluated based on economic factors, market dynamics, and other relevant
considerations. This prudent approach ensures that the project aligns with favourable conditions, thereby
maximising the likelihood of success and sustainability in the long run. The FID serves as a pivotal point in the
project timeline, signifying a commitment to advancing the Jervois Project towards its goal of becoming a successful
and economically viable venture.
Copper Market Commentary
The outlook for the Copper Market in 2024/2025 has recently improved with a number of analysts forecasting a
deficit in supply in 2024 due to mine supply disruptions together with expectations of an acceleration of the clean
energy transition with over 60 countries at the recent COP28 Climate Summit supporting a plan to triple the global
renewable energy capacity by 2030. Achieving this level will require huge amounts of copper to be produced in the
coming years. In fact, higher renewable energy targets could push the global copper demand up by an additional 4.2
million tonnes. Based on these expectations, analysts believe copper prices could rise to US$15,000/mt
(US$6.80/lb) in 20253 .
The high-grade Jervois Copper Project is well positioned to benefit from the expected long-term structural deficit in
copper and the copper price increase required to incentivise new production. Recent commentary from industry
participants calls for US$6-$8/lb copper as the minimum price range to incentive material investment into new
copper projects (Cu price as at 25 January 2024 is US3.87/lb).4
Corporate
Current cash & cash equivalent as at 31 December 2023 was $13.5 M.
3
Bank of America (December 2023 Report) quoted in CNBC Article, 2/1/2024: Copper could skyrocket over 75% to
record highs by 2025 — brace for deficits, analysts say by Lee Ying Shan.
4
Nicole Adshead-Bell, Chair, Director Cupel Advisory Corp.
KGL Resources Limited | Quarterly Activities Report
Page 8 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 31 December 2023
Mr Anthony Liaw was appointed Chief Financial Officer in December 2023. Anthony, a Certified Public Accountant
and Chartered Tax Adviser, started his career with Pricewaterhouse Coopers and Ernst Young in Singapore and has
worked as a CFO and Tax Director with global commodity and production companies.
Federal Government: Copper is a Strategic Mineral
Governments are increasingly recognising that dependence on foreign sources of critical materials creates a
strategic vulnerability for their economy and military in the face of adverse foreign government actions, natural
disasters, and other events that could disrupt supplies.
With chronic shortfalls in copper forecast over the next decade and challenges in supply from the traditional low-cost
markets of Chile and Peru, Australia has the opportunity to grow its critical minerals wealth and become an
important player in developing secure, reliable and sustainable global supply chains for copper that are
internationally competitive.
Many states in Australia including the NT have recognised Copper as a critical mineral. The Australian federal
government recently announced that copper is to be included on the newly created Strategic Materials List.
Executive Chairman, Mr. Denis Wood, commenting on progress in 2023, said:
“The strong drilling results from our most recent drilling programs at Reward and Rockface continue to
demonstrate the strong potential for expansion of the high-grade resource from infill drilling at shallow to
intermediate depths as well as from DHEM surveys indicating that both Rockface and Reward remain open
at depth. The results also support a more robust mine plan and the project’s economics.
During 2023 we commenced drilling a 2km stratigraphic hole to improve our understanding of the geological
structures at depth and the origin of the mineralising processes which have led to the deposition of the
known copper deposits. The site was shutdown in late December, with drilling to recommence in late
February, weather permitting, on the 2024 drilling campaign including the 2km stratigraphic hole. This
ongoing work will provide important stratigraphic and structural information which will assist in identifying
target areas for follow up drilling.
KGL’s Jervois Copper Project is well positioned with the necessary mining approvals and permits, to be one
of the few projects that can be in production, subject to final investment decision, as the market is faced with
a chronic shortfall in supply. Short term industry-wide challenges relating to labour shortages, cost inflation
and supply chain disruptions remain which may impact the ability to deliver a cost competitive project on
time.
Given the robust outlook for the copper market, we believe that the Jervois high grade copper, silver, gold
project, will play an important role in supporting jobs and skills growth, local business opportunities and
economic development activity in Northern Australia. Development can provide secure, reliable and
sustainable supply of critical minerals to our strategic partners to support their national security and clean
energy objectives at a time when chronic shortages in this critical mineral could potentially impact global
supply chains.”
”
This announcement has been approved by the board of KGL Resources Limited.
KGL Resources Limited | Quarterly Activities Report
Page 9 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 30 December 2023
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
Jervois Project, Northern Territory
100%
ML 30182
Jervois Project, Northern Territory
100%
ML 30829
Jervois Project, Northern Territory
100%
EL 25429
Jervois Project, Northern Territory
100%
EL 30242
Mt Cornish, Northern Territory
100%
EL 28340
Yambah, Northern Territory
100%
EL 28271
Yambah, Northern Territory
100%
EL 28082
Unca Creek, Northern Territory
100%
ML 32277
Lucy Creek Borefield, Northern Territory
100%
Mining Tenements Acquired/Granted and
Disposed during the quarter*
Location
Beneficial Holding
Location
Beneficial Holding
Location
Beneficial Holding
Nil
Tenements subject to farm-in or farm-out
agreements
Nil
Tenements subject to farm-in or farm-out
agreements acquired or disposed of during the
quarter
Nil
Related Party Payments
As reported in the quarterly cash flow report part 6.1, amounts paid to related parties of $159k
consist of directors’ fees and expenses for the quarter.
KGL Resources Limited | Quarterly Activities Report
Page 10 of 11
ASX Announcement
Quarterly Activities Report
Period Ended 30 December 2023
Forward Looking statements
This presentation includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”, “project”,
“opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward looking statements. All
statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast cash
flows and potential mineralisation, resources and reserves, exploration results and future expansion plans and development
objectives of KGL are forward-looking statements that involve various risks and uncertainties. Although every effort has been made
to verify such forward-looking statements, there can be no assurance that such statements will prove to be accurate and actual
results and future events could differ materially from those anticipated in such statements. You should therefore not place undue
reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements. Statements
in relation to future matters can only be made where the Company has a reasonable basis for making those statements.
Competent Person Statement
The following drill holes were originally reported on the date indicated and using the JORC code specified in the
table.
JORC
Date originally
Hole
Reported
Reported
Under
KJD
613
24/01/24
2012
24/01/24
614
2012
24/01/24
606
2012
24/01/24
608
2012
24/01/24
612
2012
588
19/12/23
2012
586
19/12/23
2012
KJCD 575W1
08/11/23
2012
556D4
08/11/23
2012
171
22/10/15
2012
KJD
582
19/12/23
2012
585
19/12/23
2012
587
19/12/23
2012
587D1
19/12/23
2012
KJC
607
609
24/01/2024
24/01/2024
2012
2012
KJCD
171
22/10/2015
2012
596
600
602
603
605
19/12/2023
24/01/2024
24/01/2024
24/01/2024
24/01/2024
2012
2012
2012
2012
2012
556D4
8/11/2023
2012
KGL Resources Limited | Quarterly Activities Report
Page 11 of 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
KGL Resources Limited
ABN
Quarter ended (“current quarter”)
52 082 658 080
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers – GST receipts
1.2
Payments for
Year to date
(6 months)
$A’000
498
767
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(429)
(764)
(e) administration and corporate costs
(829)
(1,853)
-
-
232
421
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Other
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(528)
(1,429)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(28)
(52)
(4,593)
(7,372)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(6 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – payment of security deposits
-
-
2.6
Net cash from / (used in) investing
activities
(4,621)
(7,424)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(58)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings – lease
payments
(44)
(86)
3.7
Transaction costs related to loans and
borrowings – lease interest
(4)
(7)
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(48)
(151)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
18,707
22,514
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(528)
(1,429)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(4,621)
(7,424)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(48)
(151)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(6 months)
$A’000
-
-
13,510
13,510
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
7,509
6,674
5.2
Call deposits
6,001
12,033
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
13,510
18,707
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
159
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
0
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(4,593)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(5,121)
8.4
Cash and cash equivalents at quarter end (item 4.6)
13,510
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
(528)
13,510
2.64
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity ex
Share your feedback
Discover