Investor Presentation
Released
Released
Announcement PDF
April 2015
21 April,
1 2015
Jervois Project Setting
On the Plenty Highway
Concentrate to be trucked from
site to Alice Springs then
transported by rail to Darwin port
In the 1960’s, ore was trucked
from Jervois to Mt Isa
2
Jervois Project Setting
12km of prospective strike length
Existing Mining Lease due to
historical mining activities on site
3
Reward Prospect looking south
Outcropping Copper Mineralisation
4
4
Geological Setting
•
•
•
5
Hosted by Bonya Schist in Eastern
Arunta
Northerly Plunging Syncline
Hybrid SEDEX-VMS
Mineral Resources Update
25.3 Mt @ 1.1% Cu for 280,000 t Cu
25.3 Mt @ 22 g/t Ag for 18 Moz Ag
25
450,000
400,000
350,000
20
+64%
Million Ounces
Copper Metal (tonnes)
300,000
250,000
200,000
150,000
100,000
+61%
15
10
5
50,000
0
May 2011
July 2011
Copper Indicated
6
Jan 2012
Copper Inferred
Nov 2012
Sep 2014
Exploration Potential
0
May 2011
July 2011 Jan 2012
Silver Indicated
Silver Inferred
Nov 2012 Sep 2014
Exploration Potential
The potential quantity and grade of the Exploration Potential is conceptual in nature and there has been insufficient exploration to define a Mineral Resource. It is
uncertain if further exploration will result in the determination of a Mineral Resource.
High Grade Resources
1.6
Mutooroo
Australian Copper Mines and Projects
(open pit only)
1.4
1.2
Jervois
Copper Grade (%Cu)
1.0
Maroochydore
White Range
0.8
E1-Monakoff
Kanmantoo
Mt Elliott
Lady Annie
Einasleigh
0.6
Hillside
Kalkaroo
Kalman
0.4
Rocklands
Nanadie Well
Bushranger
Copper Hill
0.2
0.0
10,000,000
Roseby
Browns
Temora
100,000,000
Mineral Resources (tonnes, log scale)
Source: SNL Mining & Metals, Terra Studio. Most recent mineral resources available, copper only. Bubble size according to copper metal contained.
7
Jervois Pre-Feasibility Study
2 mtpa Flotation Plant
7 Year Mine Life
21,000 tpa Copper Production
1 M ozpa Silver Production
Initial Capex $189m
C1 cost US$1.51/lb*
* (After by-product credits and using an exchange rate of A$/USD 0.845
and silver price of USD 20/oz)
8
Additional Work Programme
The Jervois project’s value can be significantly increased by further drilling and
metallurgical work:
1.
2.
3.
4.
Geotechnical – Steeper Pit Walls
Metallurgy – Targeting increased recovery of Copper and Silver
Resource Drilling – Targeting known high grade areas
Operating Costs – Reductions in mining costs – cheaper diesel
Targeting additional $100m - $200m in free cash flow
9
1. Geotechnical Drilling
• 1,200 meters of diamond core in to the planned pit walls
• Aim is to design steeper walls to reduce waste mining
• New zones of copper discovered in Eastern and Western
walls at Marshall
10
2. Metallurgical Test work
Metallurgy test work designed to achieve the following: Increase the gold and silver recoveries
Increase the recovery of copper in the transitional zone
Test the production of a mixed lead and zinc concentrate
Also found ore is softer (lower power consumption)
11
3. Resource Drilling
• 9,000m Resource
Drilling Completed
• Additional 2,000m
underway
12
4. Operating Costs
Budget pricing received for open pit and underground mining costs
Load and haul unit rate cost for surface mining have decreased significantly
Site establishment, and mobilisation costs have decreased significantly
Underground mining costs have decreased moderately.
Processing operating costs reduced due to lower power consumption
Cheaper diesel fuel price will result in substantial cost reductions in transport.
13
Schedule
1,200m Diamond Core Geotechnical Drilling Completed in March 2015
9,000m Resource Drilling Programme Completed April 2015
Additional 2,000m drilling underway to follow up new mineralised zones
Metallurgical Test work – Nearing Completion
Resource update scheduled for July 15
Updated PFS October 15
14
Yambah Tenements
• $20,000 cost
• Prospective for base
metals
• Granted Exploration
Licenses
The Yambah Project was acquired because of a correlation recently made by the NTGS between the
Bonya Metamorphics that host Jervois and the Strangways Metamorphic Complex that also forms part
of the Palaeoproterozoic eastern Arunta Region.
15
Yambah Tenements
16
For more information contact
Simon Milroy on +61 7 3071 9003
or info@kglresources.com
or visit www.kglresources.com
ASX code: KGL
Level 7, 167 Eagle Street
Brisbane, QLD 4000
AUSTRALIA
Forward-Looking Statements:
This presentation includes certain “Forward-Looking Statements”. All statements, other than statements of historical fact, included herein, including without
limitation, statements regarding forecast cash flows and potential mineralisation, resources and reserves, exploration results and future expansion plans
and development objectives of KGL Resources are forward-looking statements that involve various risks and uncertainties. There can be no assurance that
such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.
The Jervois Resources information was first released to the market on 15 September 2014 and complies with JORC 2012. The company confirms that it is
not aware of any new information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.’
17
Mineral Resources
18
Share your feedback