30 October 2015
Quarterly Activities Report
Period Ended 30 September 2015
Jervois Copper-Silver Project
Completed PFS shows strong economics of Jervois o C1* cash cost of US$0.88/lb over mine life
o 3.2 years payback
o A$807M operating cash flow
Continuing exploration success
o high grade copper at newly emerging Rockface –
potential new mine
o potential for more discoveries
Overview
KGL Resources Limited (KGL or the Company) completed the Pre-Feasibility Study (PFS)
of its 100% owned Jervois Copper-Silver Project and announced the results on 16 October.
Jervois was confirmed as a robust, mid-level scale mining project with an initial annual
production of 21,000 tonnes of copper, one million ounces of silver, plus lead and zinc, with
a mine life of more than 8 years.
The completed PFS was updated from the initial PFS announced last December. The
enhanced result benefited from work in 2015 that included increasing and upgrading the
mineral resources, simplifying the metallurgical processing and reducing the operating
costs.
The PFS places Jervois among the lowest cost of the world’s probable new mines. The
PFS shows a C1* cash cost of US$0.88/lb (A$1.26) over the initial mine life of 8.25 years, a
3.2 year payback and A$807M operating cash flow.
It is likely that the mine life will be extended. With 12km of strike length, all orebodies
remain open. The potential for substantial discoveries is demonstrated by the recent
strongly mineralised intersection at the Rockface prospect – more than 2% copper over
13m - in an area that is not included in the current mining inventory used in the PFS.
Rockface has the potential to add a new open pit and underground mine to the Jervois
project.
*After by-product credits
www.kglresources.com.au
Jervois Copper-Silver-Gold Project, Northern Territory (KGL 100%)
The Jervois project as presented in the PFS will consist of open pit mining of several
deposits followed by underground mining to feed a 2.2 Mtpa flotation plant producing
80,000 to 100,000 tpa of copper concentrate plus a separate lead/zinc bulk concentrate.
The project is forecast to produce a total of 754,000 tonnes of copper concentrate at a
grade of approximately 23% copper and 283 g/t silver over an initial mine life of 8.25 years.
This equates to an average annual production of approximately 21,000 tonnes of contained
copper and 1 million ounces of contained silver. The project will also produce approximately
179,000 tonnes of bulk lead-zinc-silver concentrate at a grade of 43% lead, 17% zinc and
1,069 g/t silver over the life of mine.
Key Life of Mine (LoM) Highlights
Resource – Copper
– Lead/Zinc
26.7Mt @ 1.12%Cu, 16.6g/tAg
3.8Mt @ 0.72%Cu, 3.7%Pb, 1.2%Zn, 67.5g/tAg
LoM*
Average Annual Production
LoM C1 Cash Cost (after credits)
LoM C3 Cash Cost
8.25 years
21,000t Cu
US$ 0.88/lb
US$ 2.13/lb
Copper Price**
Silver
Gold
FX – Exchange (A$:US$)
US$ 3.25
US$ 19.94 / oz
US$ 1,269 /oz
1A$:0.7US$
Gross Revenue (net TC and RC’s)
Operating Cash Flow
A$ 2,392m
A$ 807m
Pre-Production Capital Costs
Deferred Capital Cost (Year 2)
A$ 189.5m
A$ 26.7m
NPV (10% Discount rate)
Payback Period
IRR
A$ 248m
3.2 years
35%
The PFS is based on a total Indicated and Inferred Resource of 30.5 Mt containing 327,000
t copper, 22.6 Moz silver, 143,000 t lead and 47,000 t zinc.
Exploration potential* exists peripheral to the current resource estimates. The Exploration
Target for the combined Bellbird and Marshall-Reward zones for a 0.5% Cu cut-off is of the
order of 4 – 8 Mt at 0.8 – 1.2% Cu, 7 – 15 ppm Ag for 40,000 to 100,000 tonnes of copper,
and 1.5 – 3.5 million ounces of silver. The lodes are open at depth, and there are additional
possibilities along strike from the deposits based on isolated drillhole information and from
interpretations of the geophysical surveys.
*The potential quantity and grade of the Exploration Potential is conceptual in nature, and
there has been insufficient exploration to define a Mineral Resource in these areas.
www.kglresources.com.au
Recent exploration successes at Rockface, Green Parrot and Bellbird East offer the potential for
additional high grade relatively shallow resources that could feed into the early part of the mine
schedule and further enhance the project’s economics.
Open Pit Mining is proposed in three locations - Marshall-Reward, Green Parrot and Bellbird.
The life of mine waste to ore stripping ratio for the open pits is 7.3 : 1. Open pit mining continues
for the first 6.25 years of the mine life. Underground mining is scheduled to commence in the
third year of operations.
The process plant will produce copper sulphide concentrate as a primary product which will
contain variable amounts of silver and gold depending on the ore source. During treatment of
lead-zinc ores, the plant will produce two products: a copper concentrate, and a bulk lead-zinc
concentrate which will also contain the majority of the silver and gold. The only significant
penalty element will be bismuth which will be contained in both concentrates and is likely to
attract a minor penalty.
The concentrate transport study concluded that the use of sealed half height containers was the
cheapest and safest method to transport the concentrate from site to Darwin. The sealed half
height containers will be trucked to Alice Springs and then transported by rail to either Darwin or
Adelaide for export to Asian smelters. This process will eliminate the need for any intermediate
enclosed warehousing at both Alice Springs and at the export port.
Power will be generated on site from a 100% Liquefied Natural Gas (LNG) fuelled power plant
with the inclusion of a PV solar plant representing 10% of the overall power demand.
The PFS provides for the Definitive Bankable Study to commence early in 2016, design,
procurement and construction to commence in 2017 (subject to funding being secured) and first
production targeted for 2018.
Exploration
New areas of copper mineralisation were discovered during the quarter.
KGL completed a 3D induced polarisation (3DIP) and magnetotelluric survey (MT) in the
Bellbird region to search for additional zones of mineralisation in a poorly tested yet highly
prospective zone along the 12km mineralised strike length at Jervois.
Targeting the anomalies identified in the survey, KGL initiated a 10-hole drilling program. Five
holes were completed during the quarter, and all holes intersected new zones of copper
mineralisation.
The fifth hole, drilled at the Rockface Prospect, intersected an extended length of strongly
mineralised core from 253 metres. This is deeper than any previous hole drilled at Rockface
and well below the current Inferred Resource. Diamond hole KJCD171 intersected:
13m @ 2.14% copper, 12.4 g/t silver, 0.10 g/t god from 253m
2m @ 2.83% copper, 10.8 g/t silver and 0.05 g/t gold from 278m
www.kglresources.com.au
The Rockface trend does not feature in the PFS mine schedule. However, with such
mineralisation intersected in the first hole into an IP anomaly 500m long, further drilling could
identify areas for mining.
Further high grade copper was intersected near the surface at the Killeen Prospect:
2m @ 3.18% copper, 11.8 g/t silver and 0.03 g/t gold from 19m (Hole KJC167)
Yambah prospects, Northern Territory (KGL 100%)
Preliminary exploration work continued on two exploration licences at Yambah, 50km north of
Alice Springs in the Northern Territory. KGL announced in April 2015 that they had been
acquired due to the close similarity of the mineralisation style and host rocks to Jervois.
The highly prospective tenements contain a base metal zone and copper occurrences that have
not been fully drill tested.
Corporate
At the end of September 2015, KGL had a cash balance of $3.163 million.
Outlook
Down hole electromagnetic surveying is currently taking place at the site. The results from these
surveys will be used to design the next drill program at the site.
PWC has been commissioned to find a project partner to participate in the development of
Jervois as a significant copper, silver and multi-metal mine.
For further information, contact:
Mr Simon Milroy
Managing Director
Phone: 07 3071 9003
About KGL Resources
KGL Resources Limited is an Australian mineral exploration company focussed on increasing
the high grade resource at the Jervois Copper-Silver Project in the Northern Territory and
developing it into a multi-metal mine.
www.kglresources.com.au
Competent Persons Statement
The Jervois Resources information and Exploration Potential were first released to the market on 29 July
2015 and complies with JORC 2012. The company confirms that it is not aware of any new information or
data that materially affects the information included in the original market announcement and that all
material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.’
The Jervois Reserves information was first released to the market on 16 October 2015 and complies with
JORC 2012. The company confirms that it is not aware of any new information or data that materially
affects the information included in the original market announcement and that all material assumptions
and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
The Jervois Pre-feasibility information was first released to the market on 16 October 2015 and complies
with JORC 2012. The company confirms that it is not aware of any new information or data that materially
affects the information included in the original market announcement and that all material assumptions
and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.’
The Jervois Exploration data in this report is based on information compiled by Martin Bennett, who is a
member of the Australian Institute of Geoscientists and a full time employee of KGL Resources Limited.
Mr. Bennett has sufficient experience which is relevant to the style of the mineralisation and the type of
deposit under consideration and to the activity to which he is undertaking, to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr. Bennett has consented to the inclusion of this information in
the form and context in which it appears in this report.The following drill holes were originally reported on
the date indicated and using the JORC code specified in the table. Results reported under JORC 2004
have not been updated to comply with JORC 2012 on the basis that the information has not materially
changed since it was last reported.
Hole
Date originally
Reported
KJCD171
KJC167
JORC Reported
Under
22/10/2015
2012
22/10/2015
2012
Tenements
Tenement Number
Location
Beneficial Holding
ML 30180
ML 30182
EL 25429
EL 30242
E28340
E28271
PL 01/12
Jervois Project, Northern Territory
Jervois Project, Northern Territory
Jervois Project, Northern Territory
Jervois Project, Northern Territory
Yambah, Northern Territory
Yambah, Northern Territory
Savo Island, Solomon Islands
100%
100%
100%
100%
100%
100%
75%
www.kglresources.com.au
Mining Tenements Acquired
and Disposed during the
quarter.*
Location
Beneficial Holding
0%
Tenements subject to farmin or farm-out agreements
PL-01/12
Location
Beneficial Holding
Savo Island, Solomon Is
75%
Tenements subject to farmin or farm-out agreements
acquired or disposed of
during the quarter
Nil
Location
Beneficial Holding
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.
Name of entity
KGL Resources
ABN
Quarter ended (“current quarter”)
30 September 2015
52 082 658 080
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
1.3
1.4
1.5
1.6
1.7
(a)exploration and
evaluation
(b) development
(c) production
(d) administration
(d) office closure
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other – Settlements
Foreign Exchange differences
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a)prospects
(b)equity investments
(c) purchase options
(c) other assets
(d) disposal Costs
Proceeds from sale of:
(a)prospects
(b)equity investments
(c)other fixed assets
Loans to other entities
Loans repaid by other entities
Deed of Company Arrangement (KMWA)
Net investing cash flows
Total operating and investing cash flows (carried
forward)
Current Quarter
$A’000
-
Year to date
(9 months)
$A’000
-
(1,139)
(4,915)
(496)
-
(1,764)
(91)
-
17
-
185
-
(1,618)
(6,585)
(-)
-
(40)
-
-
-
(-)
(40)
(1,618)
(6,625)
+ See chapter 19 for defined terms.
30/09/2015
Appendix 5B Page 1
Appendix 5B
Mining exploration entity quarterly
1.13
Total operating and investing cash flows
(brought forward)
(1,618)
(6,625)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other
-
-
Net financing cash flows
-
-
Net increase (decrease) in cash held
(1,618)
(6,625)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
4,781
0
9,788
0
1.22
Cash at end of quarter
3,163
3,163
1.14
1.15
1.16
1.17
1.18
1.19
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current Quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
128
1.24
Aggregate amount of loans to the parties included in item 1.10
-
1.25
Explanation necessary for an understanding of the transactions
Remuneration and expenses paid to executive and non-executive directors for the quarter.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on consolidated assets
and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in which the
reporting entity has an interest
+ See chapter 19 for defined terms.
Appendix 5B Page 2
30/06/2015
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Amount used
$A’000
-
-
-
-
Estimated cash inflow/(outflow) for next quarter
4.1
4.2
4.2
4.3
4.31
4.4
4.5
4.6
$A’000
(388)
Exploration and evaluation
Investment/Development
Deed of Company Arrangement
Deposit Interest
Operations Costs
Admin
Asset Disposal
Capex
14
(421)
(11)
(806)
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
the related items in the accounts is as follows.
Current Quarter
$A’000
Previous Quarter
$A’000
5.1
Cash on hand and at bank
295
244
5.2
Deposits at call
2,868
4,537
5.3
Bank overdraft
5.4
Other (provide details)
3,163
4,781
Total: cash at end of quarter
+ See chapter 19 for defined terms.
30/09/2015
Appendix 5B Page 3
Appendix 5B
Mining exploration entity quarterly
Changes in interests in mining tenements
Tenement reference
6.1
Interests in
mining tenements
relinquished,
reduced or lapsed
6.2
Interests in
mining tenements
acquired or
increased
Nature of interest
(note (2)
Interest at
beginning
of quarter
Interest at end
of quarter
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
7.2
7.3
7.4
7.5
Total number
Number quoted
141,540,563
141,540,563
Issue price per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through share
consolidation
+Convertible
debt securities
(description)
+ See chapter 19 for defined terms.
Appendix 5B Page 4
30/06/2015
Appendix 5B
Mining exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Expired during
quarter
Exercised during
quarter
Decrease
through
consolidation
Debentures
(totals only)
Unsecured
notes (totals
only)
2,475,000
324,842
Unlisted
Options
Exercise price
Expiry date
Unlisted
Options
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards acceptable
to ASX (see note 4).
2
This statement does /does not* (delete one) give a true and fair view of the matters
disclosed.
Sign here:
0
............................................................ Date: 31/10/2015..............
(Director/Company secretary)
Print name:
...Kylie Anderson......................................................
Notes
1
The quarterly report provides a basis for informing the market how the entity’s activities
have been financed for the past quarter and the effect on its cash position. An entity
wanting to disclose additional information is encouraged to do so, in a note or notes
attached to this report.
+ See chapter 19 for defined terms.
30/09/2015
Appendix 5B Page 5
Appendix 5B
Mining exploration entity quarterly
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in
mining tenements acquired, exercised or lapsed during the reporting period. If the entity
is involved in a joint venture agreement and there are conditions precedent which will
change its percentage interest in a mining tenement, it should disclose the change of
percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not required in
items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries
and AASB 1026: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Accounting Standards for foreign entities. If the standards used do not address a topic,
the Australian standard on that topic (if any) must be complied with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6
30/06/2015