Investor Presentation
Released
Released
Announcement PDF
Mines and Money Hong Kong
March 2015
24 March,
2015
1
Corporate Overview
Price KGL 20 Mar 2014 - 30 Mar 2015
$0.43
ASX code
KGL
Issued shares
141.5 million
$0.38
Options
2.8 million
Average monthly volume
8.4 million
Market capitalisation (20 Mar 15)
$21 million
Cash (31 Dec 2014)
$9.8 million
$0.33
$0.28
$0.23
$0.18
Debt
Nil
$0.13
$0.08
20/03/14
1/05/14
12/06/14
24/07/14
4/09/14
16/10/14
27/11/14
8/01/15
Top Shareholders
%
KMP Investments Pte Ltd
27.3%
Andrew Daley
Chairman
HSBC Custody Nominees (Aust)
6.5%
Simon Milroy
Managing Director
JP Morgan Nominees Australia
3.9%
Chris Bain
Non-Executive Director
National Nominees
3.5%
Brad Ellis
Non-Executive Director
Top 20 shareholders
59.5%
John Taylor
Non-Executive Director
2
Board of Directors & Management
19/02/15
Jervois Project Setting
On the Plenty Highway
Concentrate to be trucked from
site to Alice Springs then
transported by rail to Darwin port
In the 1960’s, ore was trucked
from Jervois to Mt Isa
3
Jervois Project
12km strike length
4
Reward Prospect looking south
Outcropping Copper Mineralisation
5
5
Jervois Project Setting
Existing Mining Lease due to
historical mining activities on site
6
Geological Setting
•
•
•
7
Hosted by Bonya Schist in Eastern
Arunta
Northerly Plunging Syncline
SEDEX style deposit
Mineralisation intersected 870m
below surface
Deep Drill Hole
72m @ 3.27% Cu, 51.22 g/t Ag
and 1.16 g/t Au
Copper mineralisation
Lead and Zinc mineralisation
8
Mineral Resources Update
25.3 Mt @ 1.1% Cu for 280,000 t Cu
25.3 Mt @ 22 g/t Ag for 18 Moz Ag
25
450,000
400,000
350,000
20
+64%
Million Ounces
Copper Metal (tonnes)
300,000
250,000
200,000
150,000
100,000
+61%
15
10
5
50,000
0
May 2011
July 2011
Copper Indicated
9
Jan 2012
Copper Inferred
Nov 2012
Sep 2014
Exploration Potential
0
May 2011
July 2011 Jan 2012
Silver Indicated
Silver Inferred
Nov 2012 Sep 2014
Exploration Potential
The potential quantity and grade of the Exploration Potential is conceptual in nature and there has been insufficient exploration to define a Mineral Resource. It is
uncertain if further exploration will result in the determination of a Mineral Resource.
High Grade Resources
1.6
Mutooroo
Australian Copper Mines and Projects
(open pit only)
1.4
1.2
Jervois
Copper Grade (%Cu)
1.0
Maroochydore
White Range
0.8
E1-Monakoff
Kanmantoo
Mt Elliott
Lady Annie
Einasleigh
0.6
Hillside
Kalkaroo
Kalman
0.4
Rocklands
Nanadie Well
Bushranger
Copper Hill
0.2
0.0
10,000,000
Roseby
Browns
Temora
100,000,000
Mineral Resources (tonnes, log scale)
Source: SNL Mining & Metals, Terra Studio. Most recent mineral resources available, copper only. Bubble size according to copper metal contained.
10
High Grade Resources
3.0
Size and grade of undeveloped copper projects
2.5
First Quartile
Second Quartile
Third Quartile
Fourth Quartile
Copper Grade (%Cu)
2.0
Jervois
1.5
1.0
0.5
Weighted Average: 0.49% Cu
0.0
0
200
400
600
800
Copper Contained in Resources (Mt)
Source: SNL Mining & Metals, Terra Studio. Undeveloped copper projects with more than 250,000t of contained copper metal (open pit only)
11
1,000
Jervois Pre-Feasibility Study
2 mtpa Flotation Plant
7 Year Mine Life
21,000 tpa Copper Production
1 M ozpa Silver Production
Initial Capex $189m
C1 cost US$1.51/lb*
* (After by-product credits and using an exchange rate of A$/USD 0.845
and silver price of USD 20/oz)
12
Jervois 2 mtpa Flotation Plant
13
Additional Work Programme
The Jervois project’s value can be significantly increased by further drilling and
metallurgical work:
1.
2.
3.
4.
Geotechnical – Steeper Pit Walls
Metallurgy – Targeting increased recovery of Copper and Silver
Resource Drilling – Targeting known high grade areas
Operating Costs – Reductions in mining costs – cheaper diesel
Targeting additional $100m - $200m in free cash flow
14
1. Geotechnical Drilling
• 1,200 meters of diamond core in to the planned pit walls
• Aim is to design steeper walls to reduce waste mining
• New zone of copper in Eastern wall at Marshall
15
2. Metallurgical Test work
Metallurgy test work designed to achieve the following: Increase the gold and silver recoveries
Increase the recovery of copper in the transitional zone
Test the production of a mixed lead and zinc concentrate
16
3. Resource Drilling
High Value
Exploration Targets
17
3. Resource Drilling
High Value
Exploration Targets
18
4. Operating Costs
Going to tender for open pit and underground mining costs
Cheaper fuel price will result in substantial cost reduction of transport, mining
and power
19
Schedule
1,200m Diamond Core Geotechnical Drilling Completed in March 2015
9,000m Resource Drilling Programme Commenced February 2015
Metallurgical Test work – Nearing Completion
Resource update scheduled for June 15
Updated PFS September 15
20
For more information contact
Simon Milroy on +61 7 3071 9003
or smilroy@kglresources.com
or visit www.kglresources.com
ASX code: KGL
Level 7, 167 Eagle Street
Brisbane, QLD 4000
AUSTRALIA
Forward-Looking Statements:
This presentation includes certain “Forward-Looking Statements”. All statements, other than statements of historical fact, included herein, including without
limitation, statements regarding forecast cash flows and potential mineralisation, resources and reserves, exploration results and future expansion plans
and development objectives of KGL Resources are forward-looking statements that involve various risks and uncertainties. There can be no assurance that
such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.
21
Mineral Resources
22
Compliance Statement
The Jervois Resources information was first released to the market on 15 September 2014 and complies with JORC 2012. The company confirms that
it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.’
The following drill holes were originally reported on the date indicated and using the JORC code specified in the table. Results reported under JORC
2004 have not been updated to comply with JORC 2012 on the basis that the information has not materially changed since it was last reported.
Hole
KJD
23
Date originally
Reported
010W1
15/01/2015
JORC Reported
Under
2012
Share your feedback
Discover